当前位置:文档之家› 工程设计合同(中英文)

工程设计合同(中英文)

建设工程设计合同

Engin eeri ng Service Con tract

(专业建设工程设计合同)

(Professio nal Engin eeri ng Service Con tract For Con structio n Project)

工程名称:___________

Name of the project:

工程地点:____________________________

Locati on of the project:

合同编号:__________________________________________

(由设计人编填)

Con tract No.:

(Filled in by the Desig ner)

设计证书等级:_____________________________

Level of the desig n certificate:

发包人:_________________________

Employer:

设计人:______________________________

Desig ner: ____________________

签定日期:____________________________________________

Date of con tract:

江苏省建设厅监制

江苏省工商行政管理局

Supervised by: Jia ngsu Provin cial Departme nt of Con structi on Jiangsu Provincial Administration for Industry and Commerce

发包人:_______________________

Employer: (Party A)

设计人: ___________________________________

Desig ner: (Party B) ___________________________

发包人委托设计人承担________________________________________ 工程设计,工程地点

为 _____ ,经双方协商一致,签订本合同,共同执行。

The Employer entrust the Designer to undertake the engineering design of

*** a nd the locati on for the project is within the pla nt of .After frie ndly con sultati on, the Parties hereby sig n this Con tract as follows :

第一条本合同签订依据。

Article 1 Basis for the con clusi on of this Con tract

1.1《中华人民共和国合同法》、《中华人民共和国建筑法》、《建设工程勘察设计市场管理规

定》。

1.1 The Con tract Law of the People' s Republic of Chi na; The Con structio n

Law of the People' s Republic of China; Regulati ons on the Adm ini stratio n of the Market for Survey and Desig n of Engin eeri ng Con structio n.

1.2国家及地方有关建设工程勘察设计管理法规和规章。

1.2 Nati onal and local rules and regulati ons on the adm ini strati on of the

market for survey and desig n of engin eeri ng con structi on.

1.3建设工程批准文件。

1. 3 Approval docume nts of the engin eeri ng con struct ion

第二条设计依据。

Article 2 Basis for desig n of the engin eeri ng con structi on

2.1发包人给设计人的委托书或设计中标文件

2.1 Letter of Authority or docume nts on letter of accepta nee provided by the

Employer to the Desig ner.

2.2发包人提交的基础资料

2.2 Basic materials submitted by the Employer.

2.3设计人采用的主要技术标准是:

国家及地方现行的技术标准和规范

2.3 The main tech no logical sta ndards adopted by the Desig ner are as

follows:

Current n ati onal and local tech nol ogical sta ndards, rules and

regulati ons.

第三条合同文件的优先次序

Article 3 Priority of the con tractual docume nts

Current n ati onal and local tech nol ogical sta ndards, rules and

regulati ons.

构成本合同的文件可视为是能互相说明的,如果合同文件存在歧义或不一致,则根据如下优先次序来判断:

The several docume nts formi ng the Con tract are to be take n as mutually expla natory of one ano ther, but in case of ambiguities or discrepa ncies, the priority of the docume nts forming the con tract shall be as follows:

3.1合同书

3.1 The Con tract

3.2中标函(文件)

3.2 The Letter of Acceptance (documents);

3.3发包人要求及委托书

3.3 Requirements of the Employer and letter of authority;

3.4投标书

3.4 The Ten der.

第四条本合同项目的名称、规模、阶段、投资及设计内容(根据行业特点填写)。

Article 4 Name, size, stages, investment and content of design (which may be filled in according to the characteristics of the industry).

名称:—

Name:

规模:_______________________________________

Size:

阶段:_______________________

Stage:

投资:约______ 万美元

Inv estme nt: About dollars

设计内容及工作范围:—二__________________________________

Desig n content and work scope :

第五条发包人向设计人提交的有关资料、文件及时间。

Article 5 Materials and documents delivered by the Employer to the Designer and time for delivery of materials and docume nts

1. 上级部门的批复文件。(合同生效后)

〔.Official reply docume nt by higher authority(after effective ness of con tract);

2. 设计开始前应提供有关技术规格资料。(合同生效后)

2. The Employer should supply related tech no logical specificati on

docume nts before start ing to desig n;

3. 主管部门对方案设计的审批意见。(施工图开始前提供)

3. Official reply of the power supply departme nt on consent of the power supply.

相关主题