This contract is concluded on the 1th day of July 2012 (the “Effective Date”) between(the “Buyer”) and (the “Seller”).

(买方)与(卖方)于二零一二年七月一日(生效日期)订立本合同。

1.SCOPE OF THE CONTRACT 合同目的

The Seller agrees to sell and deliver Coal in bulk and the Buyer agrees to purchase and accept delivery of Coal in bulk at the terms and conditions set out below:

根据下述条款与条件卖方同意售卖和运送散装煤炭而买方同意购买及接受散装煤炭。

2.DEFINITIONS 定义

Actual Calorific Value means:实际热值意即the calorific value of the Coal as stated in the final certificate of analysis basis kcal/kg (NAR);载明于最后检验证的煤炭热值

Affiliates means:分支机构意即in relation to any company or corporation, a Subsidiary or Holding Company of that company or corporation or any other Subsidiary of that company or corporation or of that Holding Company;

Banking Day and Business Day mean:银行工作日和营业日意即any day except a Saturday or Sunday on which banks in the city of New York, New York, USA, are generally open for the conduct of business;

Calorific Value (CV)

means:热值(CV)意即

the calorific value of the Coal expressed in BTU/lb or kcal/kg; Holding Company:控股公

has the meaning given to it in the definition of Subsidiary;

INCOTERMS 2010 means:贸易术语2010意即the 2010 edition of the standard trade definitions published by the International Chamber of Commerce;

Kcal/kg means:大卡/公斤

意即

the heating value of coal expressed in kilo-calories per kilogram;

Laytime means:装卸时间

意即

the time allowed for discharging the vessel;

Laycan means:受载期意即the agreed days during which the vessel shall arrive at the port of discharge for the commencement of discharge;

Metric Ton (MT) means:

公吨(MT)意即

1 metric ton of 1,000 kilograms or 2204.6

2 lbs; NAR means:收到的净值Net As Received;

Subsidiary means:子公司意即a company or corporation which, in relation to another company or corporation (a “Holding Company”): (a) is controlled, directly or indirectly, by the Holding Company; (b) more than half the issued share capital of which is beneficially owned, directly or indirectly by the Holding Company; or (c) which is a Subsidiary of another Subsidiary of the Holding Company; and for this purpose, a company or corporation shall be treated as being controlled by a Holding Company if the Holding Company is able to direct its affairs and/or to control the

composition of its board of directors or equivalent body;

US$ means:美元$意即the lawful currency of the United States of America.

3.QUANTITY 数量

One cape-sized shipments of 165,000 Metric Tons +/- 10% in vessel’s option.

一艘好望角型船只165,000公吨正负10%。

4.QUALITY 质量

Colombian original coal in accordance with the following typical spec ifications (the “Coal”):

哥伦比亚原煤符合下述典型规格(煤炭)

Buyer’s Right to Reject买方拒收权

The Buyer has the right to reject the Coal if: 买方有权拒收,如:

?The loadport Net Calorific Value (as received) result is below 5600 kcal/kg; or 装货港净热值(收到时)低于5600大卡/公斤,或

?The loadport Sulphur content (as received) result is over 1%; or 装货港含硫量(收到时)高于1%,或

?The loadport Ash content (as received) result is over 16%. 装货港灰分(收到时)高于16%

5.PRICE 价格

The price per Metric Ton of the Coal shall be calculated as follows:

煤炭的每公吨价格计算如下:

Price 价格

US$ xxx per MT delivered CIF 1 safe port, 1 safe berth in Fangcheng port, Guangxi province, China, basis 5,800 kcal/kg (NAR) with no draft restrictions at discharge port.

每公吨美元$ xxx CIF 一个安全港口,一个在中国广西省防城港的安全、没有吃水限制泊位,基础5,800大卡/公斤(收到时净值)。

Price Adjustment 价格调整

Calorific Value 热值

In the event the Actual Calorific Value is above or below 5,800 kcal/kg (NAR) a pro-rata price adjustment will be deducted from or added to the Price, calculated as follows:

假如实际热值高于或低于5,800大卡/公斤(收到时净值),则价格将按比例计算调整,算法如下:

Where: 算式中

Freight means the actual freight rate per Metric Ton, to be advised by Seller to Buyer;

FOB Price means the CIF price less Freight.

Freight 运费即是由卖家方报给买方的每公吨实际运费。

FOB Price 即是CIF价格扣除Freight运费。

6.SHIPPING SCHEDULE 装运时间表

The Coal shall be loaded during May or June 2012 in Seller’s opti on and subject to suitable vessel availability.

煤炭由卖方选择于二零一二年五月或六月装运,视乎船只供应情况。

If a workable letter of credit is not received by Seller’s bank in accordance with the clause 8. PAYMENT, Seller shall have the right but not the obligation to delay or suspend performance of any of its obligations under this contract and/or terminate this contract. Any losses arising out of Buyer’s failure to open a workable letter of credit in time shall be for Buyer’s account.

假如卖方未能按照第八条·付款所示如期收到可操作的信用证,卖方有权推延或搁置其供货责任以及/或终止本合同。因买方未能开出可操作的信用证而招致的任何损失均由买方负责。

7.DELIVERY 运送

CIF (Incoterms 2010) 1 safe port, 1 safe berth in Fangcheng po rt, Guangxi province, China, basis 5,800 kcal/kg (NAR) with no draft restrictions at discharge port.

CIF(贸易术语2010)一个安全港口,一个于中国广西省防城港的安全、无吃水限制的安全泊位,基础5,800大卡/公斤(收到时净值)。

Buyer shall provide at discharge port a safe berth reachable on arrival where the vessel shall always be able to enter, discharge, lie and leave afloat.

买方须于卸货港提供一安全泊位,让船只到达时可以随时进入、卸货、停靠和离开。

Vessel Nomination 船只通报

Seller shall notify the Buyer of the following details in writing:

卖方将以书面形式通知买方以下资料:

a.The name (or IMO number) of the vessel that the Seller nominates including the age,

flag, class, deadweight tonnage, beam, length overall and draft of the vessel;

船只的名称(或IMO编号)包括船龄、载重吨位、船宽、整体长度以及吃水量。

b.The estimated date of arrival of the vessel at the port of discharge.

到达卸货港的预计日期。

Buyer shall confirm acceptance of vessel nomination within 1(one) Business Day of Seller’s nomination. 卖方通报后买方须於一个营业日内确认。

The Seller shall give written notice to the Buyer of the progress of the vessel five (5) days, three (3) days, two (2) days and twenty four (24) hours before the ETA of the vessel at the port of discharge. The Seller shall inform the Buyer of any deviation in excess of twenty-four (24) hours to the aforementioned ETA. 卖方将于预计船只抵达卸货港前五天、三天、两天和二十四小时以书面通知买方船只的进度。如有偏差,卖方将于前述的预计抵达日二十四小时前通知买方。

The Seller may substitute any vessel nominated under this contract by another vessel by giving a notice of substitution to the Buyer at any time prior to ETA of the original vessel.

卖方或于预计抵达日前任何时候发出更换通知书通知买方更换原来通报的船只。

Discharge rate 卸载速度

Buyer shall guarantee a minimum discharge rate of 25,000 metric tons per weather working day, Sundays and holidays included (PWWD SHINC).

买家须保证每一可卸载工作天最少卸载25,000公吨,包括星期天和公众假期。

Turn time: 12 (twelve) hours.

等泊时间:十二小时

Agency, port charges, dues and taxes

At the discharge port, the Seller is only accountable for port charges associated with bringing the vessel alongside the discharge berth. Any taxes, dues or other charges levied against the cargo shall be for the Buyer’s account. All such charges shall be paid promptly by the Buyer such that the Buyer is in a position to take delivery of the cargo without delay.

在卸货港卖方只负责牵涉引领船只停靠泊位的码头费用,买方须负责其他所有费用。买家须及时支付该等费用以免导致延误。

Stevedores 装卸工

The stevedores shall be appointed by the Buyer. The stevedores and anyone employed by the stevedores shall be under the supervision of the Master. Loss and/or damage caused by Stevedore act or omission, if any, to be settled directly between stevedores / Buyer and Master / owners.

买方负责委派装卸工。装卸工与任何受雇于装卸工人仕均由船长监督。如装卸工的行为或疏忽引致损失及/或损失,由装卸工/买方与船长/船东直接解决。

Product discharged by Buyer 买方卸载货物

Product is to be discharged and taken free from the vessel's holds at the Buyer's risk and expense.

货物由船只卸载转移的风险和费用由买方负责。

Notice of Readiness and Laytime 准备就绪通知与卸货时间

After arrival at the port of discharge, Notice of Readiness may be tendered by the vessel during or outside of office hours at any time of day or night, Saturdays, Sundays and holidays included, whether in port or not, whether in berth or not, whether in free pratique or not, whether customs cleared or not.

船只抵达卸货港后,将随时发出准备就绪通知,无论是办公或非办公时间,日与夜,包括星期六,星期天与公众假期,无论在港口与否,在泊位与否,入港与否以及清关与否。

Laytime shall commence at the earlier of: 卸货时间将随下开情况开始,以先发生着为准:

a.Twelve (12) hours after Notice of Readiness has been tendered; or 发出准备就绪通

知后十二小时,或

b.The actual commencement of discharge. 实际卸货开始时。

Laytime shall cease on completion of discharge (holds to be left by stevedores swept cleaned, to Master’s satisfaction). Any extra time used solely for the Buyer’s draft survey shall count as Laytime. Time used for final draft survey, shall always count as Laytime and time used.

卸货完成后卸货时间即终结(剩余的装卸工须清扫干净直至船长满意)。任何额外用于买方进行吃水测量的时间均算作卸货时间。用于最终吃水调查的时间通常算作卸货时间及耗用时间

Time and costs of shifting directly between berths at the Buyer’s or Port Authority’s request shall count as Laytime and all in doing so shall be for the Buyer’s account.

买方或港口当局要求在泊位间直接转移花费的时间和成本算作卸货时间并由买方负责。

Any time lost during discharging due to the vessel's inability to discharge or due to any other defect and/or default in the vessel, deficiency and/or default of the vessel's personnel shall not count as Laytime. 卸货时由于船只不能卸货或由于任何的船只缺陷及/或缺失、不足及/或由于船员的缺失导致的时间损失不算作卸货时间。

In the event of weather conditions which, in the opinion of either the Port Authority or the Master make discharging perilous, and all discharging operations are suspended then all such time lost shall not count as Laytime, unless vessel is already on demurrage, and the Master may close hatches in case of heavy rain, heavy snow, or hail. In case of rain, all holds which have not been fully discharged should be closed in order to avoid wetting the Coal.

天气方面,如果港口当局或船长认为会引致卸货危险而暂停卸货操作则所有时间损失将不计算入卸货时间内,除非船只已然滞期,而船长或会于大雨、大雪或下冰雹时关闭舱门。大雨时,所有未卸载的剩余货物应该关闭以防弄湿煤炭。

Laytime permitted at the discharge port shall be calculated on bill of lading quantity.

提单上数量将会计算可允许的卸货时间。

Demurrage and Despatch 滞期费与速遣费

The demurrage rate shall be as per the governing Charter Party.

滞期费依据租船合约中的规定计算。

If total Laytime used exceeds total Laytime allowed, Buyer shall pay Seller demurrage per day or pro rata for the excess time. If the total Laytime used is less than the total Laytime allowed, the Seller shall pay despatch to the Buyer for the time saved at the rate equal to fifty per cent (50%) of the demurrage rate per day or pro rata part thereof.

如果所用卸货时间超出可允许的卸货时间,买方将付与卖方按日计算的滞期费或按比例计算的超时费。如果所用卸货时间少于可允许的卸货时间,则卖方将付与买方按节省了的时间计算的速遣费,费率是滞期费或超时费的50%。

Laytime calculations shall be presented by the Buyer within 30 (thirty) calendar days of the completion of discharge. Demurrage / despatch shall be paid by the party so owing within 3 (three) Business Days of agreement of Laytime calculation s against presentation of the owed party’s invoice.

卸货时间总计将于卸货完毕后三十个日历日内由买方出具。按装货时间总计议定付款方将于收款方开出发票后三个营业日内支付滞期费/速遣费。

8.PAYMENT 付款

Letter of Credit 信用证

Payment shall be made by Buyer in US$ without any deduction, withholding, offset or counterclaim whatsoever by means of a fully workable irrevocable documentary letter of credit, to be opened by a bank and in a form fully acceptable to Seller covering 100% (one hundred percent) of the cargo value based on Seller’s pro forma invoice value of quantity of 165,000mt and allowing a tolerance of +/- 10% in quantity. 付款以美元结算,不得扣减,留存,抵消或反诉,付款工具使用由银行开出的按卖方备考发票货物总值的100%不可撤销、卖方接受的信用证,货物数量165,000公吨,容许正负10%数量差异。

1.The letter of credit must be opened within 3 (three) Business Days after this contract signed.

信用证必须于签署本合同后三个营业天内开出。

2.Time is of the essence for the opening of the letter of credit. The opening of the letter of credit shall

be a condition precedent to the Seller’s obligation to deliver the Coal.

开出信用证的时间极为重要。开出信用证是卖方履行供煤责任的先决条件。

3.The letter of credit shall be available and negotiable at the counters of any bank and shall provide

that:

信用证可于任何银行议付而且:

a)Third party documents are acceptable; 第三方文件可接受;

b)Underdrawings and multiple drawings are allowed; 可以不足额兑付及多次兑付。

c)Documents to be presented within 42 days of the bill of lading date; 文件可以于提单日期后42

天内提交。

d)The value of the letter of credit may escalate/de-escalate in accordance with the price formula

without any further amendment; 信用证的金额可以按计价方程式上浮/下浮,无需改证。

e)Spelling mistakes and other typographical errors not affecting unit price, quantity and/or amount

are acceptable; and 不影响单价、数量及/或总额的拼写错误可以接受。

f)Interest payable may be drawn separately; 应付利息可以另行兑付。

g)The quality specifications stated are typical values. If such values differ from the actual values

shown on the certificate of analysis issued at the port of loading, they cannot be deemed as a discrepancy under the letter of credit except for quality specifications that exceed or are below any stated rejection limit. 质量规格只是典型数值。如果该数值不符装货港的检验报告,于议付信用证时不能被视为误差,除非数值超过或低于拒收标准。

4.If the certificate of sampling and analysis reflects specifications which are outside of the typical

specifications but within the rejection limits as stated in clause 4. QUALITY, the beneficiary of the letter of credit may negotiate without discrepancy.

如果取样与检验报告的结果不符典型规格但仍然在拒收标准内(第四条。品质),则信用证不存在误差,受益人可以进行议付。

5.The letter of credit shall be governed by UCP 600 (ICC Uniform Customs and Practice for

Documentary Credits).

信用证受UCP 600 管辖。

6.The letter of credit shall not bear any sanction clauses.

信用证不得存在任何制裁条款。

7.All charges relating to the opening of the lette r of credit shall be for the Buyer’s account. Any charges

from the advising/negotiating bank shall be for the Seller’s account.

开证费用由买方负责,议付费用由卖方负责。

Payment 付款

95% of the value of the Coal based on the bill of lading weight and the analysis determined at the port of loading, shall be paid at sight under the letter of credit against presentation of the following original documents:

依据提单上的重量以及于装货港取得的检验报告,煤炭货值的95%将凭以下文件即期议付信用证:

1.Seller’s provisional invoice; 卖方临时发票;

2.3/3 original ‘clean on board’ Charter Part y bills of lading, made out to order and blank endorsed,

marked “freight payable as per Charter Party”; 3/3全套‘洁净’提单,‘凭指示’‘空白背书’标明‘运费按租船合同支付’;

3.Certificate of weight in 1 original and 1 copy; 重量证明,一正本,一副本;

4.Certificate of analysis in 1 original and 1 copy; 检验证明,一正本,一副本;

5.Certificate of origin in 1 original and 1 copy. 产地来源证,一正本,一副本。

Final payment shall be made under the letter of credit against presentation of the following documents: 最后货款凭以下文件议付信用证;

If the calorific value (on a NAR basis) determined at the port of loading by an internationally recognised licensed marine inspector and at the port of discharge by CIQ is within 200 (two hundred) kcal/kg:

如果热值(收到时净值),无论于装货港由国际认可的持牌海事督察检验及于卸货港由CIQ检验,都在200大卡/公斤以内:

1.Seller’s final commercial invoice;卖方最终商业发票,

2.Beneficiary’s certificate certifying that the calorific value (on a NAR basis) determined at the port of

loading by an internationally recognised licensed marine inspector and at the port of discharge by CIQ is within 200 (two hundred) kcal/kg. 受益人证明书证明热值(收到时净值)于装货港由国际认可的持牌海事督察检验及于卸货港由CIQ检验的结果都在200大卡/公斤以内。

If the calorific value (on a NAR basis) determined at the port of loading by an internationally recognised licensed marine inspector and at the port of discharge by CIQ is greater than 200 (two hundred) kcal/kg: 如果热值(收到时净值),于装货港由国际认可的持牌海事督察检验及于卸货港由CIQ检验,结果是大于200大卡/公斤:

1.Seller’s final commercial invoice based on umpire certificate of analysis, indicating the basis of the

calculation of the payable amount; 卖方最终商业发票,根据仲裁者的检验报告说明应付金额的计算方法,

2.Umpire certificate of analysis. 仲裁者的检验报告。

9.TITLE AND RISK 货物权与风险

Title shall pass from Seller to Buyer when the letter of credit issuing bank has accepted the documentary presentation by Seller’s bank under the letter of credit and, in the case of sight payment, payment has been received by the Seller, or in the case of deferred payment, the issuing bank has accepted the deferred payment obligation to the Seller.

当发证银行接受了卖方银行提交的议付文件,货物权即由卖方移至买方,如果是即期付款,即卖方以收取货款,如果是延期付款,那么发证银行已对卖方承担延期付款的责任。

Risk shall pass from Seller to Buyer when the Coal is delivered on board the performing vessel at the port of loading.

当煤炭在装货港装船后,风险即由卖方移至买方。

10.WEIGHING, SAMPLING AND ANALYSIS 称重、取样及分析

Weighing 称重

The weight shall be determined at the port of loading by draft survey performed by an internationally recognized licensed marine inspector. The Seller shall appoint the inspector and shall bear the cost of these operations. The inspector shall issue a weight certificate for the Coal as determined by the draft survey and this weight shall be shown on the bill of lading. The weight thus determined shall be final and binding for settlement purposes, save for fraud or manifest error.

重量将由国际认可的持牌海事稽查于装货港执行的吃水调查决定。卖方负责委派稽查并承担有关

费用。稽查调查吃水后将发出煤炭重量证明并显示于提单上。该重量经决定后是最终的并作为议

付依据,除非有作弊或明显错误。

Sampling and Analysis 取样和分析

Sampling shall be conducted at the port of loading by an internationally recognised licensed marine inspector. The Seller shall appoint the inspector and shall bear the cost of these operations. Sampling shall be conducted using a mechanical or manual sampler where available. A composite sample shall be split into 3 (three) sub-samples, one for analysis by the inspector, one for Buyer, and one to be retained by the inspector for umpire purposes. The Buyer shall have the right to be represented during sampling operations at the port of loading at its own expense.

取样将由国际认可的持牌海事稽查于装货港执行。卖方负责委派稽查并承担有关费用。取样将采用机械或人工采样。一份综合样本将会分成三个子样本,一个由稽查化验,一个给买方,第三份则由稽查保留作仲裁之用。买方有权自费派遣代表到装货港观看取样过程。

Determination of the quality of the Coal shall be done by analysis of the laboratory sample. The laboratory shall issue a certificate of analysis in accordance with ISO testing and analysis procedures. These results shall be final and binding, save for (a) fraud or manifest error; or (b) unless challenged as provided for below:

煤炭品质将由化验室经分析后决定。化验室将依据ISO测试机分析标准发出品质证明。分析结果将是最终的,除非(a)存在作弊或明显错误,或(b)以下情况出现:

If the difference between the calorific value (on a NAR basis) determined at the port of loading by an internationally recognised licensed marine inspector and the port of discharge by CIQ is greater than 200 (two hundred) kcal/kg, then within 3 (three) Business Days after the calorific value has been determined at the port of discharge by CIQ, either party shall have the right to call for the load port umpire sample to be analysed. The analysis of such umpire sample shall be performed by SGS Newcastle. The calorific value determined by the umpire shall be final and binding on both parties, save for fraud or manifest error. 如果热值差异(收到时净值)-于装货港由国际认可的持牌海事稽查检验的以及于卸货港由CIQ检验的结果-大于200大卡/公斤,那么当得到卸货港的CIQ的检验结果后三个营业日内,双方皆有权要求化验存于装货港的仲裁用样本。该样本将由纽卡斯的SGS执行化验。仲裁用样本的化验结果将是最终的,对双方均有约束力,除非出现作弊或明显错误。

The Seller shall have the right to be represented during sampling operations at the port of discharge at its own expenses.

卖方有权自费派遣代表到卸货港观看取样过程。

Seller shall have the right to appoint an independent inspector to conduct sampling and/or analysis operations at the port of discharge (the “Seller’s Inspector”). Seller’s Inspector shall be permitted to witness operations performed by CIQ at the port of discharge and to seal samples. Sample seals shall only be broken in the presence of the Seller’s Inspector. Upon completion of sample preparation the Seller’s Inspector shall be provided with a natural state sample for each sub-lot. The costs of Seller’s Inspector shall be for Seller’s account.

卖方有权指派独立的稽查在卸货港进行取样和/或化验(卖方稽查)。卖方稽查可于卸货港见证CIQ的工作以及封存样本。样本必须于卖方稽查在场时才可解封。取样完成后卖方稽查可以获给货物每一部分的自然状态样本。派遣卖方稽查的费用由卖方负责。

A composite sample taken at the port of discharg e split and sealed by CIQ shall be reserved as Seller’s sample. Seller’s sample shall be delivered to the Seller’s office in China.

一份在卸货港由CIQ分组和封存的综合样本将会保留给卖方。该卖方样本将送至卖方设于中

国的办事处。

If an umpire analysis is performed and as a result a payment adjustment is to be made, such payment shall be made by the party so owing by telegraphic transfer within 3 (three) Business Days of the date the umpire’s certificate is issued against presentation of a copy of the umpire certificate and the owed party’s invoice for the sum claimed.

如果仲裁化验的结果显示货款需要调整,那么当仲裁证明发出后的三个营业日内,付款方当

依据收款方发出的发票随同仲裁证明以T/T支付调整金额。

11.FORCE MAJEURE

If either party is prevented, hindered or delayed from performing in whole or in part any obligation or condition of this contract by reason of force majeure (the “Affected Party”), the Affected Party shall give written notice to the other party promptly and in any event within 3 (three) Business Days after receiving notice of the occurrence of a force majeure event giving, to the extent reasonably practicable, the details and expected duration of the force majeure event and the quantity of Coal affected (the “Force Majeure Notice”).

任何一方如果遭遇不可抗力(遭遇方)的妨碍、阻碍或延迟而未能全部或部分履行本合同中任何责任或条件,那么无论什么情况下,遭遇方须于收到不可抗力事故报告后三个营业日内以书面通报对方并尽可能实际说明事故详情,估计事故持续时间和受影响的煤炭数量(不可抗力报告)。

Provided that a Force Majeure Notice has been given, for so long as the event of force majeure exists and to the extent that performance is prevented, hindered or delayed by the event of force majeure, neither party shall be liable to the other and the Affected Party may suspend performance of its obligations under this contract (a “Force Majeure Suspension”). During the period of a Force Majeure Suspension, the other party may suspend the performance of all or a part of its obligations to the extent that such suspension is commercially reasonable.

发出不可抗力报告后,在不可抗力事故持续期间,受不可抗力妨碍、阻碍或延迟的工作,双方均无需向对方负责,遭遇方基于本合同规定可以暂停执行工作(不可抗力暂停)。在不可抗力暂停期间,另一方可以基于合理商业考量暂缓执行其全部或部分工作。

The Affected Party shall use commercially reasonable efforts to avoid or remove the event of force majeure and shall promptly notify the other party when the event of force majeure is terminated.

遭遇方应合理的使用商业手段防止或清除不可抗力事故,当不可抗力事故终止时马上通知对方。

If a Force Majeure Suspension occurs, the time for performance of the affected obligations and, if applicable, the term of this contract shall be extended for a period equal to the period of suspension.

如发生不可抗力暂停,受影响的责任完成时限甚或本合同的有效期将延展至与暂停期同等时间。

If the period of the Force Majeure Suspension is equal to or exceeds 3 months from the date of the Force Majeure Notice, and so long as the force majeure event is continuing, either party may, in its sole discretion and by written notice, terminate this contract or, in the case of multiple deliveries under this contract, terminate the affected deliveries. Upon termination in accordance with this clause, neither party shall have any further liability to the other in respect of this contract or, as the case may be, the terminated deliveries except for any rights and remedies previously accrued under the Contract, including any payment obligations.

如果不可抗力暂停自不可抗力通知日期起计达到或超过三个月而不可抗力事故仍然持续,则双方皆有权决定以书面通知对方终止本合同或,终止受影响的货物运送航次。合同根据本条款终止时,除了较早前据本合同累计的权利和补救措施外,双方就终止的航次对于对方皆无后续责任包括付款责任。

“Force Majeure” means any cause or event reasonably beyond the control of a party, including, but no t limited to fires, earthquakes, lightning, floods, explosions, storms, adverse weather, landslides and other acts of natural calamity or acts of god; navigational accidents or maritime peril; vessel damage or loss; strikes, grievances, actions by or among workers or lock-outs (whether or not such labour difficulty could be settled by acceding to any demands of any such labour group of individuals); accidents at, closing of, or restrictions upon the use of mooring facilities, docks, ports, harbours, railroads or other navigational or transportation mechanisms; disruption or breakdown of, storage plants, terminals, machinery or other facilities; acts of war, hostilities (whether declared or undeclared), civil commotion, arrest and/or detention of the Coal and/or vessel, embargoes, blockades, terrorism, sabotage or acts of the public enemy; any act or omission of any governmental authority; good faith compliance with any order, request or directive of any governmental authority; curtailment, interference, failure or cessation of supplies reasonably beyond the control of a party; or any other cause reasonably beyond the control of a party, whether similar or dissimilar to those above and whether foreseeable or unforeseeable, which, by the exercise of due diligenc e, such party could not have been able to avoid or overcome. A party’s inability economically to perform its obligations under the Contract shall not constitute an event of force majeure. 不可抗力意思是不受一方控制的任何事故或事件,包括但不仅限于火灾、地震、闪电、水灾、爆炸、雷暴、恶劣天气、山泥坍塌及其他自然灾害或天灾;航行事故或海上灾害;船只损坏或损

失;示威、怨气、罢工或锁闭(不管这些劳工问题能否以向诉求让步解决);于停泊设施、码头、港口、铁路或其他航行或运输机制的意外、关闭或限制;仓储、机器或其他设施中断、毁坏;战争、敌对(公告或未公告),动乱、逮扑及/或扣留煤炭及/或船只,禁运、封锁、恐袭、破坏或乱民行为、政府机关任何举措或疏漏;遵守政府机关的命令、要求或指令;遇事方不能控制的供应削减、干扰、事故或断绝,或任何一方不能控制的,不管与上述的事件相似或不相似,能预见或不能预见,是遇事方尽职亦不能避免或解决的事故。

This clause shall not apply to any obligations to pay, indemnify or provide security or to any Coal for which vessel space has been booked, pricing has been established or payment has been made unless the Seller has expressly consented in writing.

对于已经定好舱位、价格已经确立或货款已经支付的煤炭,此条款不能豁免其付款、赔偿或提供保护措施的责任,除非卖方以书面同意。

12.DISPUTE RESOLUTION 解决争端

Any dispute arising out of or in connection with this contract, including any question regarding its existence, validity or termination, shall be referred to and finally resolved by arbitration under the Rules of the Hong Kong International Arbitration Centre (HKIAC), which Rules are deemed to be incorporated by reference into this clause. The tribunal shall consist of three arbitrators, one to be nominated by Buyer, one by Seller and the third to be mutually agreed by Buyer and Seller, failing such agreement, the appointing authority of HKIAC shall appoint the third arbitrator. However, it is understood that both parties shall be entitled to take any reasonable measures for the protection of rights accrued to them by this contract without prejudice to the provisions of this clause. The language of the arbitration shall be English. The arbitration shall be held in Hong Kong Special Administrative Region. The Arbitration Tribunal shall state in its award in detail the facts of the case and reasons for its decision. The award shall be final and binding.

任何与本合同有关的争议,包括任何关于本合同的存在、合法性或终止的问题都受香港国际仲裁中心(HKIAC)的法律管束并最终仲裁,是本条款认可作为参照的法律。法庭将由三名仲裁人组成,买方提名一名,卖方提名一名,第三名是买卖双方都同意的人,如不能一致同意人选,则由HKIAC指派第三名仲裁人。双方都明白各自有责任采取合理措施保护其于本合同中的权益但会不偏不倚地遵守本条款的规定。仲裁使用的语言是英文。仲裁将于香港特别行政区进行。仲裁庭在其判令中将会说明详细事实和判令的理据。该判令将是最终而且具有约束力的。

13.CHOICE OF LAW 适用法律

The Contract shall be governed by and construed in accordance with the laws of Hong Kong, without regard to principles of choice of law.

本合同服膺并按香港法律解释,不考虑选择适用法律的原则。

The United Nations Convention on Contracts for the International Sale of Goods (1980) shall not apply to this contract.

联合国国际货物销售合同公约(1980)并不适用于本合同。

14.TAXES AND TARIFFS 税项与关税

Any taxes, tariffs and duties whether existing or new on the Coal or on commercial documents relating thereto or on the cargo itself, imposed in the country of origin shall be borne by the Seller.

所有在原产国收取的卖炭税项与关税,无论是原来存在的或新实行的,或者与货运有关的商业文件征税,都由卖方负责。

Any taxes, tariffs and duties whether existing or new on the Coal or on commercial documents relating thereto or on the cargo itself, imposed in the country of discharge and/or the importing country shall be borne by Buyer.

所有在卸货地收取的卖炭税项与关税,无论是原来存在的或新实行的,或者与货运有关的商

业文件征税,都由买方负责。

15.LICENSES 批文

Buyer undertakes that all the necessary import licences and all other authorisations required for the Coal have been obtained (and/or will be obtained) for the entire quantity covered by this contract. Buyer furthermore guarantees that such licences will remain in force for the full life of the contract.

买方保证合同中所有进口煤炭的所有必需的进口批文和所有其他授权都已经取得(或将会取得)。买方进一步保证在合同生效期间所有的批文都是始终有效的。

No failure by the Buyer to comply with this clause shall: amount to frustration; constitute a force majeure event; or otherwise constitute justification for the non-performance by the Buyer of any obligation (or part thereof) under this contract.

买方未能遵行此条款时,不可以此为由制造不可抗力事端,造成困扰,或开脱其合同中承担的全部或部分责任。

16.ASSIGNMENT 转让

Without the prior written consent of the other party, which shall not be unreasonably withheld, neither party may assign or create a trust or otherwise transfer its rights or obligations under this contract in full or in part, except that the Seller and its assigns may without such consent assign all or a portion of their rights to receive and obtain payment under this contract in connection with securitisation or bank funding arrangements. Any such assignment will not detract from the Seller’s obligations under this contract.

没有另一方的书面同意,任何一方均不可以转让或成立委托人,或转移合同中的全部或部分权益或责任,但卖方及其委任人可以无需该同意书转让其全部或部分权益,为证券或银行资金安排有关的目的收取本合同中的货款。任何此等转让将不会削减卖方合同中应负的责任。

17.DEFAULT 缺省

If either Party (the “Defaulting Party”) (i) fails to comply with any material obligation under this contract and such failure remains uncured for 3 (three) Business Days after written notice thereof; (ii) makes an assignment or arrangement for the benefit of creditors, (iii) is the subject of a petition or proceedings which has been filed/commenced under any bankruptcy or similar law for creditor protection, which is not withdrawn or dismissed within 30 (thirty) days of filing; (iv) otherwise becomes bankrupt or insolvent (however evidenced) or commits any act of bankruptcy; (vii) becomes subject to a dissolution or winding

up order or to appointment of an administrator, examiner, receiver, custodian, liquidator, trustee or other similar official, then the other Party (the “Non-Defaulting Party”) shall have the right to (a) terminate this contract upon written notice to the Defaulting Party; and/or (b) suspend performance of its obligations under this contract until such event of default is cured or the contract is terminated; and/or (c) withhold and/or offset any payments due to the Defaulting Party until such event of default is cured.

如任何一方(缺省方)(i)不能遵守本合同中任何一项实质责任而该等失误在发出书面通知

后三个营业日仍然持续;(ii)为债权人的利益作出转让或安排,(iii)被债权人入禀清盘或

类似诉讼,在入禀后三十日内尚未撤诉,(iv)已经破产或无力偿债或自行申请破产,(v)

被申请解散或清盘,那么另一方(无缺省方)有权(a)发出书面通知终止本合同,(b)暂

停履行本合同的责任直至缺省事件解决或本合同终止,及/或(c)扣留或抵消对缺省方的款

项直至该缺省事件解决。

18.LIMITED WARRANTY 有限保证

The Seller gives no guarantees, conditions, warranties or representations, express or implied (whether by statute or otherwise), in relation to the quality, merchantability, fitness or suitability of the product for any particular purpose or otherwise, which extend beyond the description of the goods and any specifications contained in this contract and any such guarantees, conditions, warranties or representations which would otherwise be implied by statute (including without limitation by the Sale of Goods Act 1979) are hereby excluded.

就产品的品质、适销、合格、适用的问题,卖方不保证任何超出本合同中描述的货物与规

格,无论是明示或暗示,法规订明与否。法规暗示的保证(包括货品销售法案1979)在此排

除。

19.LIMITATION OF LIABILITY 有限的责任

Neither the Seller nor the Buyer shall be liable, whether in contract or in tort or otherwise, for indirect, consequential or special damages or losses of whatsoever nature, however caused.

无论卖方与买方均无需对自然造成的非直接、相应的或特殊损毁或损失负责,不管什么原因。

20.INCOTERMS 贸易术语

Insofar as not inconsistent herewith INCOTERMS 2010 (and any later amendments thereto) shall apply to this contract.

本合同应用贸易术语2010(及任何较后的修订)。

21.CHANGE OF CONTROL 控制权转换

In the event of any actual or prospective change in the organisation, control or management of the Buyer or the Seller, including without limitation, a change to the majority shareholding or privatisation or equivalent process, subject always to clause 17. DEFAULT, this contract will not be changed or in any way modified and shall continue in full force and effect.

假如卖方与买方发生实质的或预期发生控制权或管理权变化,包括主要股权变动或私有化或

类似程序,参照第十七条。缺省,本合同将不会改变或有任何修正并将继续完全有效。

22.NOTICES 通知

No notice or communication with respect to this contract shall be effective unless it is given in the English language in writing and delivered or sent by facsimile or electronic mail to the other party at the address set out herein, or to such other address as each party otherwise notifies the other party.

任何通知须使用英文书写并通过传真或电邮发送至对方的下述地址方为有效,或发送至双方互相知会对方的地址。

Notices given by first class mail shall be deemed to have been delivered when received. Notices sent by facsimile or electronic mail shall be deemed to have been received upon completion of successful transmission if sent during normal office hours at the place of receipt. Any facsimile or electronic mail transmitted outside of normal office hours at the place of receipt shall be deemed to have been received on the next Business Day.

以一级邮件发送的通知被视为完全送达并被接收。以传真或电邮发送的通知,如在接收地的办公时间内成功传送亦被视为已被接收。任何以传真或电邮发送的通知,如在接收地的办公时间外传送则视为在下一个办公日被接收。

All notices, requests and other communications hereunder shall be addressed: 所有通知、请求和通讯将被发送至以下地址:

If to Buyer: 买方

If to Seller: 卖方

23.SET OFF

Notwithstanding any other provision of this contract, if, at any time, Buyer and/or any of its Affiliates fails to make any payment due to Seller and/or any of its Affiliates, whether under this contract or any other contracts between the parties, Seller shall be entitled to withhold, set off or deduct any sum either under this contract or any other contracts then in force; provided that such deduction shall not exceed the aggregate value of the goods and the sums due under the contracts. Such withholdings or deduction may be applied by Seller automatically in diminution of its claims against Buyer in respect of any such failure to pay or perform any part of a contract.

24.WAIVERS

No amendment, modification or waiver of any provision of this contract or of any right, power or remedy shall be effective unless made expressly and in writing.

No waiver of any breach of any provision of this contract shall: (a) be considered to be a waiver of any subsequent or continuing breach of that provision; or (b) release, discharge or prejudice the right of the waiving party to require strict performance by the other party of any other provisions of this contract.

The granting of any time or indulgence (express or implied) by Seller in favour of Buyer, including but not limited to additional time to open a letter of credit, shall not under any circumstances constitute any variation or waiver of any right, power or remedy of any provision of this contract, whether or not such grant is made in writing.

25.SEVERABILITY

The invalidity, illegality or unenforceability of any one or more of the provisions of this contract shall in no way affect or impair the validity and enforceability of the other provisions of the contract.

26.CONFIDENTIALITY

The existence of and terms of this contract shall be held confidential by the parties save to the extent that such disclosure is made to a party’s banks, accountants, auditors, legal or other professional advisers, or as may be required by law, a competent court or a liquidator or administrator of a party, or the other party has consented in writing to such disclosure.

27.ENTIRE AGREEMENT

This contract constitutes the entire agreement between the parties and supersedes all representations and prior agreements (both oral and written) in connection with the matters which are the subject of this contract. Each party acknowledges and represents that it has not relied on or been induced to enter into this contract by any representation, warranty or undertaking other than those expressly set out in this contract. A party is not liable to the other party for a representation, warranty or undertaking of whatsoever nature that is not expressly set out in this contract.

IN WITNESS WHEREOF the parties have executed this document as of the respective dates specified below with effect from the Effective Date specified on the first page of this document.

Accepted:

_______________________________________ (signed by fully authorised signatory)

Date: _______________________________________ (signed by fully authorised signatory)

Date:

工厂建造合同范本精装版

( 合同范本 ) 甲方:_____________________________ 乙方:_____________________________ 日期:__________年______月______日 精品合同 / Word文档 / 文字可改 工厂建造合同范本精装版 The contract concluded after the parties reached a consensus through equal consultations stipulates the mutual obligations and the rights they should enjoy.

工厂建造合同范本精装版 第一条定义 “业主”指_________. “承包商”指_________. “工厂”指在附录_________中指定的构成固定设备的全部机器、设备和材料。 “工地”指按本合同用于建造工厂的全部土地。 “工程”指承包商按本合同实施的工程。 “合同价格”指业主向承包商支付的全部工程款项。 第二条承包商的职责 1.承包商应负责设计、筹划以及在工地上建造工厂。 2.除了业主根据第_________条提供的项目和设施,承包商应提供所有为使工厂成功建造所必需的设备、材料、工具、设施、劳工和服务。

3.承包商应根据附录_________中的日程安排施工。 4.承包商应根据附录_________中的规定为业主培训工厂设备的操作和维修人员。 5.承包商应向业主提供附录_________中规定的备件。 6.承包商应向业主提供附录_________中指定的维修设备。 第三条业主的职责 1.业主应提供工地,并在本合同有效期内允许承包商自由地、不受干扰地出入该工地。 2.业主应按时提供附录_________中指定的物件和设施。 3.业主将从有关部门获取为工厂建造、设备运行所必需的执照和许可证,包括承包商雇员的工作许可证。 4.业主应按第_________条中规定的合同价格向承包商支付工程款项。 第四条合同价格 1.在本合同生效后_________天内,业主应向承包商支付金额为合同价格,作为承包商完成该工程并承担本合同规定的所有义务的

采购合同(中英文版)

PURCHASE ORDER 采购合同 合同编号( Contract No.):日期(Date): 卖方(Seller): 地址(Address): 电话(Tel):传真(Fax):电子邮箱(E-mail): 买方(Buyer): 地址(Address): 电话(Tel):传真(Fax): 邮箱(E-mail): The undersigned seller and buyer have agreed to close the following transactions according to the terms and conditions set forth as below: 买卖双方经协商同意按下列条款成交: http://biz.doczj.com/doc/0316172738.html,modity, Quantity and Price: 1.1. The contract price will be calculated based on the actual shipping quantity. 结算总金额以实际发货数量计算。 1.2. The packing list should indicate the weight of a balk and the quantity of bales. 装箱单应表明规格,每包重量,数量和装箱的总重量。 1.3 As seller's parking list indicated. 以卖方的装箱单为准. 2. Shipment 装运: 2.1 The seller is responsible to load products into the container. 卖方负责装入集装箱内。 2.2 Package: opp bag

合同意向书范本中英文版

合同意向书范本 潜在资产出让合同意向书 潜在卖方:_____________________________ 潜在买方:_____________________________ 交易事项:_____________________________ 日期:______________, 20_____ 本意向书不具有约束力,所包含之条款有待上述潜在卖方与买方就可能发生之交易(本处应指“资产出让”)进行磋商。本意向书不应被视为任何合同、或具有法律约束力的协议,而应视作仅为磋商之目的而订立的有关本意向书项下可能达成之合同的条款概述。签署本意向书之目的是为了能够便于潜在买方就购买价格筹措资金。双方应对本意向书之内容保密,且除了本意向书项下双方及其雇员、律师、会计师和潜在买方之潜在贷款方之外,不得向任何其他第三方透露。本次磋商之交易条款随附其后,但是除非潜在的买卖双方签署书面协议,这些条款(及潜在出让本身)将不具有约束力。随附条款中“应该”一词仅为合同阅读之惯例,并不意味随附之条款具有或将要具有法律约束力。 ____________________________ 签字 ____________________________ 签字 LETTER OF INTENT FOR POSSIBLE CONTRACT FOR SALE OF ASSETS Possible Seller: _____________________________ Possible Buyer: _____________________________ Business: _____________________________ Date: ______________, 20_____ This is a non-binding letter of intent that contains provisions that are being discussed for a possible sale of the Business named above from the possible Seller named above to the possible Buyer named above. This is not a contract. This is not a legally binding agreement. This is merely an outline of possible contract terms for discussion purposes only. This is being signed in order to enable the Possible Buyer to apply for financing of the purchase price. This letter of intent is confidential and shall not be disclosed to anyone other than the parties and their employees, attorneys and

设备供应商中英文合同参考

合同 Between BYD Electronics India Private Limited ADDRESS:D-2, D-8 PT(2) SIPCOT Industrial Park,Irungattukottai, Sriperumbudur-602105,Tamil Nadu , India TEL:+91-44-47108888FAX: +91-44-47108866 A corporation duly registered and existing under the laws of India, hereinafter referred to as "USER or BYD"; 一个注册于印度并受印度法律约束的公司,以下称之谓“使用方或比亚迪” And 和 ADDRESS: 地址: TEL:FAX: 86-755- 电话:86-755- 传真:86-755- A corporation duly registered and existing under the laws of China, hereinafter referred to as "SUPPLIER".一个注册于中国_并受中华人民共和国法律约束的公司,以下称之为“供货人”。 Whereas “SUPPLIER” is unable to engage in the import & export business, and whereas USER accepts that SUPPLIER may consign HANG FUNG ELECTRIC MFG.LIMITED as an agent to conduct business with USER, and USER signed the CONTRACT (Contract No.______) with its agent dated on ____. Now therefore, in consideration of the premises and mutual consultations, the parties hereto establish the terms and conditions hereinafter as a supplemental agreement, which is binding upon both parties, and it is as follows: 鉴于供货人自身无法从事进出口业务,同时鉴于使用方同意供货人委托恒丰电业制造厂有限公司作为代理商与其进行关于买卖该设备的交易,而使用方和代理商于______签订了合同(合同号为:_______)。因此,考虑到以上情况并经相互协商,双方特约定以下条款及条件作为该合同的补充协议,协议双方均遵照该协议信守执行。 Therefore, the parties agree with the terms and conditions as follows: 因此,双方在如下条件上达成协议: ARTICLE 1 – SUPPLIER’S WARRANTY OVER ITS AGENT 第一款-供应方对其代理商的保证 1.1 Agent carries out the overseas trade on behalf of Seller. Any and all of Agent’s compensation and other expenses will be in conformity to the agreement between Agent and Seller. In no event shall Buyer be responsible for the compensation and other expenses of Agent to carry out this Contract. 代理商是为了卖方的利益进行外贸代理的一方,代理商的一切佣金、其他花费遵从代理商与卖方的约定,不应由买方承担。

工厂建造合同2018

工厂建造合同2018 合同范本

第一条定义 “业主”指_________。 “承包商”指_________。 “工厂”指在附录_________中指定的构成固定设备的全部机器、设备和材料。 “工地”指按本合同用于建造工厂的全部土地。 “工程”指承包商按本合同实施的工程。 “合同价格”指业主向承包商支付的全部工程款项。 第二条承包商的职责 1.承包商应负责设计、筹划以及在工地上建造工厂。 2.除了业主根据第_________条提供的项目和设施,承包商应提供所有为使工厂成功建造所必需的设备、材料、工具、设施、劳工和服务。 3.承包商应根据附录_________中的日程安排施工。 4.承包商应根据附录_________中的规定为业主培训工厂设备的操作和维修人员。 5.承包商应向业主提供附录_________中规定的备件。 6.承包商应向业主提供附录_________中指定的维修设备。 第三条业主的职责 1.业主应提供工地,并在本合同有效期内允许承包商自由地、不受干扰地出入该工地。

2.业主应按时提供附录_________中指定的物件和设施。3.业主将从有关部门获取为工厂建造、设备运行所必需的执照和许可证,包括承包商雇员的工作许可证。 4.业主应按第_________条中规定的合同价格向承包商支付工程款项。 第四条合同价格 1.在本合同生效后_________天内,业主应向承包商支付金额为合同价格,作为承包商完成该工程并承担本合同规定的所有义务的全部报酬。 2.合同价格不再上调,完成工种的成本风险应由承包商承担,商定合同价格时应认为承包商已获得全部信息并已把所有可能影响成本的因素估计在内。 第五条设计图样 1.承包商应根据合同,在附录_________规定的时间内向业主提交工厂建造所需的图样,供业主审批。业主应在收到这些图样后一个月内,对图样进行审核,并作出批准或不批准的决定。2.承包商应对上述图样中的任何缺点、错误或疏漏负责,除非这种缺点、错误或疏漏是因业主书面提供的不准确信息所致。3.业主或承包商互相提供的所有图样和技术资料,收到方应作为机密文件对待,除非另有商定,收到方不得将这些图样和资料用于与本合同无关的其他目的。 第六条检验

英文合同-货物进口合同(中英文)

英文合同:货物进口合同(中英文) 这篇《英文合同范文:货物进口合同(中英文)》是为大家整理的,希望对大家有所帮助。以下信息仅供参考!!! 签约日期:买方:卖方: 本合同由买卖双方缔结,用中、英文字写成,两种文体具有同等效力,按照下述条款,卖方同意售出买方同意购进以下商品: 【章名】第一部分 1.商品名称及规格 2.生产国别及制造厂商 3.单价 4.数量 5.总值 6.包装 7.保险 8.装船时间 9.装运口岸 10.目的口岸 11.装运唛头,卖方负责在每件货物上用牢固的不褪色的颜料明显地刷印或标明下述唛头,以及目的口岸、件号、毛重和净重、尺码和其它买方要求的标记。如系危险及/或

有毒货物,卖方负责保证在每件货物上明显地标明货物的性质说明及习惯上被接受的标记。 12.付款条件:买方于货物装船时间前一个月通过______银行开出以卖方为抬头的不可撤销信用证,卖方在货物装船启运后凭本合同交货条款第18条a款所列单据在开证银行议付贷款。上述信用证有效期将在装船后15天截止。 13.其它条件:除非经买方同意和接受,本合同其它一切有关事项均按第二部分交货条款之规定办理,该交货条款为本合同不可分的部分,本合同如有任何附加条款将自动地优先执行附加条款,如附加条款与本合同条款有抵触,则以附加条款为准。 【章名】第二部分 【章名】14.fob/fas条件 14.1.本合同项下货物的装运舱位由买方或买方的运输代理人___________租订。 14.2.在fob条件下,卖方应负责将所订货物在本合同第8条所规定的装船期内按买方所通知的任何日期装上买方所指定的船只。 14.3.在fas条件下,卖方应负责将所订货物在本合同第8条所规定的装船期内按买方所通知的任何日期

中英文合同意向书范本正式版

YOUR LOGO 中英文合同意向书范本正式版 After The Contract Is Signed, There Will Be Legal Reliance And Binding On All Parties. And During The Period Of Cooperation, There Are Laws To Follow And Evidence To Find 专业合同范本系列,下载即可用

中英文合同意向书范本正式版 使用说明:当事人在信任或者不信任的状态下,使用合同文本签订完毕,就有了法律依靠,对当事人多方皆有约束力。且在履行合作期间,有法可依,有据可寻,材料内容可根据实际情况作相应修改,请在使用时认真阅读。 (sample letter of intent form) letter of intent for possiblecontract for sale o f assetspossible seller: _______________possible bu yer: _______________business: _______________date: _ _____________, 20_____ this is a non- binding letter of intent that contains provisions that are being discussed for a possible sale of the business named above from the possible s eller named above to the possible buyer named a bove. this is not a contract. this is not a l egally binding agreement. this is merely an outl ine of possible contract terms for discussion pu rposes only. this is being signed in order to enable the possible buyer to apply for financing of the purchase price. this letter of intent is confidential and shall not be disclosed to a nyone other than the parties and their employees

保密协议(中英文版)

MUTUAL NONDISCLOSURE AGREEMENT 互相保密协议 This Mutual Nondisclosure Agreement, effective as of ________, 2005, is being entered into between ____________________________ and ________ [insert correct company name and address] (“Company”) relative to ________ Confidiential Information supplied to Citect Pty. Ltd’s China operations (“Citect”) for the ______________________ Contract No. _________:Contract 003 for Software Supply and Services effective October 15, 2003. 根据《______________》(合同编号:_______________)之三——即《_____________》(有效日期为_____________)的约定,________________(_____,以下简称为“ESI”)向________________ (以下简称为“____________”) 提供______保密信息,现____和_____ [插入公司名称和地址](以下简称为“公司”)就该ESI保密信息的有关事宜经过友好协商,共同达成本互相保密协议,协议自2005年___月__日正式生效。 1. The Company and ESI each agree not to divulge to third parties, without the prior written consent of the other, any confidential information obtained from or through the other in connection with the performance of this Agreement (the “Confidential Information”), including the terms of this Agreement. Confidential Information may include, without limitation, trade secrets, processes, formulae, source code materials, specifications, programs, software packages, test results, technical know-how, methods and procedures of operation, business or marketing plans, customer lists, proposals, and licensed documentation. The Company and ESI hereby confirm that they will not use any Confidential Information of the other party, except in furtherance of the purpose(s) set forth hereinabove, and agree that each will also take all reasonable steps to prevent its employees and consultants from using or disclosing any of the other party's Confidential Information except as required for the performance of their duties hereunder. ESI and the Company will mark all Confidential Information with the word "Confidential" and will instruct their employees to identify as confidential any such information which is not in written form. Any information disclosed orally shall be followed by a written confirmation thereof, specifying the date and subject of the disclosure, within thirty (30) days. 公司和______双方一直同意:未经对方事先书面同意,不得将其在履行本协议过程中从对方处或通过对方而获得的任何保密信息(包括本协议中的条款,以下简称为“保密信息”)泄露给任何第三方。保密信息包括但不限于商业秘密、工艺流程、配方、源代码资料、规格说明、程序、软件包、测试结论、技术性专有决窍、操作方法和规程、业务或营销计划、客户名单、建议书和许可性文件。公司和ESI特此确认如下:除为实现本协议上述各项目的之外,任何一方不得擅自使用对方的保密信息,此外,上述双方还一致同意:双方应采取所有的合理的措施,防止其各自的员工和顾问擅自使用或披露对方的保密信息,但是,该等员工或顾问为履行其在本协议项下之职责所必须使用或披露的情形除外。ESI和公司双方将对其各自的保密信息明确标识为“保密”字样,并且,还应指示其员将任何非以书面形式存在的此等信息划分为保密信息的范畴。以口头形式披露的任何信息应在披露后的三十(30)天内向信息接收方发出书面确认书,明确与披露信息的数据和对象有关的事宜。 2. Information shall not be considered confidential if it: 符合下列情形之一的,则不属于保密信息的范畴:

中英文对照合同11

采购合同 (Purchasing Contract) 合同编号(Contract NO.): 合同签订地点(Signed At):东营 签订时间(Date):年月日出卖人(Seller): 买受人(Buyer): 鉴于:根据【中华人民共和国合同法】及相关法律法规,本着平等自愿、等价有偿、诚实诚信的原则,经双方协商一致,订立本合同。 According to the Contract law of the People's Republic of China and relevant laws and regulations,we conclude the contract on the basis of equality, voluntariness,compensation of equal value and sincerity. 第一条标的、数量、价款及交(提)货时间 Item 1 (object)Quantity Price and Delivery time 物资编码名称及规格型号Commodity code and type 生产厂家 Manufacture r 计量单位 Unit 数量 Quantity 单价(元) Unit Price 总金额(元) Total Amount 备注 Note 不含税总金额(人民币) Total Amount (V AT excluded) 交提货时间、数量:年月日至年月日全部交货。 Delivery time: From to 第二条质量标准:标准代号、编号和标准名称:GB150-98. Item 2 Quality standard: standard code,serial number and standard name:GB150-98. 第三条出卖人对质量负责的条件及期限 Item 3 Conditions and time limits that Sellers shall be held responsibility for 1. 质量负责条件和期限按正常运行12个月止执行。 1. Quality responsible conditions and time limits shall not be valid until the product has been functioning properly for 12 months 2. 出卖人对标的物的质量负责,产品均附质检报告单,质量保证书。如果出卖人知道或 者应当知道所处卖产品存在质量缺陷,所承担的质量保证期限不受前款质量负责期限的约束,应依法承担相应责任。 2. Sellers shall be responsible for the quality of the marks.The products should include the Quality Inspection Report and Quality Guarantee.If the sellers know or should know the products they sell with defects in quality,the quality assurance time limits should not be subject to the previous quality responsibility deadline and they should be held due responsibility for it. 第四条包装标准:标准包装,产品所需包装由出卖人合理包装,适合水运和长途内陆运输,防潮,防湿,防锈,防震。 Item 4 Packaging standard: Standard packaging, the sellers should package the products properly, it should be suitable for shipment and long distance inland transportation. The packaging of the products should be resistant of dampness, moisture, rust and shock. 第五条随机的必备品、配件、技术资料、工具数量及供应方法:随设备交货一起交齐。 Item 5 The accompanied necessary materia l, accessories, technical information ,quantity of

(新版黄皮书)FIDIC永久设备和设计建造合同条款

FIDIC 永久设备和设计-建造合同条件 CONDITIONS OF CONTRACT FOR Plant and Design-Build 通用条件 专用条件编制指南 争端裁决协议书格式 投标函、合同协议书格式 周可荣刘雯 万彩芸王健译

前言 FIDIC(国际咨询工程师联合会)是国际上咨询工程师最权威的组织,FIDIC编制的合同文件在国际上为世行、亚行、非行及许多国家的项目中采用,随着国际上工程咨询和承包业的不断发展,项目管理这个学科也在不断地完善和创新,一般FIDIC每十年左右对原有合同条件都要作一次修改与更新。 经过多位专家的努力,FIDIC最近出版了四本新的合同条件: “施工合同条件”(1999年第一版) “EPC—交钥匙项目合同条件”(1999年第一版) “工程设备和设计—建造合同条件”(1999年第一版) “合同的简短格式”(1999年第一版) 为了及时地与国内同行共同学习研讨这些国际上的最新文本,我们举办了这次学习班,并编写了这本材料,但因时间急促,其中“EPC—交钥匙项目合同条件”,“永久设备和设计—建造合同条件”,“合同的简短格式”三本书仅为讲授提纲,“施工合同条件”为全文译文。 但要声明的是,这份译文未经仔细校对,因而请勿复制传播,不要正式引用。中国工程咨询协会FIDIC文献编译委员会将会组织对这些合同条件的翻译,并出版中英对照的文本。 讲授提纲后面附有6篇有关FIDIC99年版合同条件的论文,供学习参考并请指正。 天津大学管理学院 国际工程管理研究所 1999年11月

引言 国际咨询工程师联合会(FIDIC)于1999年出版了下列四份新的合同标准格式的第一版: ● 施工合同条件(Conditions of Contract for Construction) 推荐用于由雇主设计的、或由其代表—工程师设计的房屋建筑或工程(building or engineering works)。在这种合同形式下,承包商一般都根据雇主提供的设计施工。但工程中的某些土木、机械、电力和/或建造工程也可能由承包商设计。 ● 永久设备和设计—建造合同条件(Conditions of Contract for Plant and Design-Build) 推荐用于电力和/或机械设备的提供,以及房屋建筑或工程的设计和实施。在这种合同形式下,一般都是由承包商根据雇主任务书设计和提供永久设备和/或其它工程(可能包括由土木、机械、电力和/或建造工程的任何组合形式)。 ● EPC/交钥匙项目合同条件(Conditions of Contract for EPC/Turnkey Projects) 适用于在交钥匙的基础上提供一加工厂或发电厂、一工厂或其它类似设施、基础设施项目或其它类型的开发项目的提供,这种合同条件所适用的项目(i)对最终价格和施工时间的确定性要求较高,(ii)承包商完全负责项目的设计和施工,雇主基本不参与工作。在交钥匙项目中,一般由承包商实施所有的设计、采购和建造工作:即在“交钥匙” 时,提供一个配备完整、可以运行的设施。 ● 合同的简短格式(Short Form of Contract) 推荐用于价值相对较低的房屋建筑或工程。根据工程的类型和具体条件的不同,此格式也适用于价值较高的合同,特别是较简单的、或重复性的、或工期短的工程。在这种合同形式下,一般都是由承包商根据雇主或其代表(如有时)提供的设计实施工程,但对于部分或完全由承包商设计的土木、机械、电力和/或建造工程的合同也同样适用。 建议在国际范围内招标时通用上述格式。在某些国家和地区,特别是当合同条件用于其国内合同时,可能需要对这些格式进行一些改动。FIDIC认为官方的和正式的文本是以英语编写的文本。 在编写永久设备和设计—建造合同条件的过程中我们认识到,尽管有许多条款是普遍适用的,但也有一些条款必须根据特定合同的具体情况予以变动。因此,我们将那些对大多数(并非全部)合同都适用的条款编入了通用条件中,以方便使用者将其纳入每一具体合同。 通用条件和专用条件共同构成了制约各方权力和义务的合同条件。对于每一份具体的合同,都必须编制专用条件,并且必须考虑到通用条件中提到的专用条件中的条款。 本版的通用条件是基于下列情况编写的: (i)期中支付和最终支付将根据测量的数值乘以工程量表中的费率和价格决定; (ii)如果通用条件中的某些词语需要用进一步的数据来说明,那么(除非其描述性

中英文协议意向书

(sample letter of intent form) letter of intent for possible contract for sale of assets possible seller: _____________________________ possible buyer: _____________________________ business: _____________________________ date: ______________, 20_____ this is a non-binding letter of intent that contains provisions that are being discussed for a possible sale of the business named above from the possible seller named above to the possible buyer named above. this is not a contract. this is not a legally binding agreement. this is merely an outline of possible contract terms for discussion purposes only. this is being signed in order to enable the possible buyer to apply for financing of the purchase price. this letter of intent is confidential and shall not be disclosed to anyone other than the parties and their employees, attorneys and accountants and the possible lenders of the possible buyer. the terms of the transaction being discussed are attached hereto, but the terms (and the possible sale itself) are not binding unless and until they are set forth in a written contract signed by possible seller and possible buyer. the word "shall" is used in the attached terms only as an example of how a contract might read, and it does not mean that the attached terms are or ever will be legally binding. ____________________________ ________________________ ____________________________

保密协议中英文版

保密协议 Confidentiality Agreement 鉴【】有限公司(下称“甲方”)与【】(下称“乙方”)拟就【】(下称“项目”)业务开展合作为保障甲乙双方商业秘密不受侵害,双方达成如下保密协议,以资共同遵守: Whereas 【】Co., Ltd (hereinafter referred to as “Party A”) is considering cooperating with【】(hereinafter referred to as “Party B”) for【】(hereinafter referred to as “the Project”).Therefore, the Parties hereby enter into this Confidential Agreement as follows for the purpose of safeguarding the business secret of the Parties: 一、定义 Article 1 : Definition 1、信息披露方:在本协议中是指保密信息的提供方; Information Discloser: In this agreement, it means the Party who provide confidential information to the other Party. 2、信息接受方:在本协议中是指保密信息的接收方。 Information Receiver: In this agreement, it means the Party who receive confidential information from the other Party. 二、保密信息的组成 Article 2: Composition of Confidential Information 本协议所称保密信息是指由信息披露方提供给信息接受方的任何与信息披露方经营业务或行为有关的、信息披露方尚未公开的信息,无论该信息采用何种形式提供给信息接受方,保密信息接受方或其工作人员均应合理认为其为保密信息。 Confidential Information referred in this Agreement means any information provided by information discloser to the information receiver which is related to the business or activity of the information discloser or any information that has not been publicized by the information discloser. The information receiver or the personnel of the information receiver shall reasonably deem such information as confidential information disregarding the form in which such information is provided to the information receiver.

工厂建造合同完整版

工厂建造合同完整版 In the case of disputes between the two parties, the legitimate rights and interests of the partners should be protected. In the process of performing the contract, disputes should be submitted to arbitration. This paper is the main basis for restoring the cooperation scene. 【适用合作签约/约束责任/违约追究/维护权益等场景】 甲方:________________________ 乙方:________________________ 签订时间:________________________ 签订地点:________________________

工厂建造合同完整版 下载说明:本协议资料适合用于需解决双方争议的场景下,维护合作方各自的合法权益,并在履行合同的过程中,双方当事人一旦发生争议,将争议提交仲裁或者诉讼,本文书即成为复原合作场景的主要依据。可直接应用日常文档制作,也可以根据实际需要对其进行修改。 第一条定义 “业主”指_____。 “承包商”指_____。 “工厂”指在附录_____中指定的构成固定设备的全部机器、设备和材料。 “工地”指按本合同用于建造工厂的全部土地。 “工程”指承包商按本合同实施的工程。 “合同价格”指业主向承包商支付的全部工程款项。

保密协议合同中英文对照版

NON-DISCLOSURE AGREEMENT 保密协议 THIS NON-DISCLOSURE AGREEMENT (this “Agreement”) is entered into this ____ day of _____________, 2008, by and between IAC (Shanghai) Management Co., Ltd., a company organized and existing under the laws of the People’s Republic of China (“PRC”), with its principal place of business at 5F03, King Tower, No. 28 Xin Jin Qiao Road, Jin Qiao, Pudong, Shanghai 201206, the PRC ("IAC") and _____________________, a company organized and existing under the laws of the PRC, with its legal address at [●] (the “Supplier”). IAC and the Supplier are hereinafter, collectively, referred to as the “Parties” and, individually, a “Party”). 本保密协议(本“协议”)由埃驰(上海)管理有限公司,一家根据中华人民共和国(“中国”)法律成立并存续的公司,其主要营业地位于中国上海市浦东新区新金桥路28号新金桥大厦5F03室,邮编201206(“IAC”)与_____________________,一家根据中国法律成立并存续的公司,其法定地址位于[●](“供应方”)于2008年___月___日签订。IAC和供应方在本协议下合称为“双方”,单独称为“一方”。 WHEREAS, the Parties desire to collaborate with each other in connection with the proposed supply of [insert description of the products to be supplied by Suppler to IAC] (the “Products”) by the Supplier to IAC and/or its affiliates (collectively, the “Buyer”) so as to confirm the specifications of the Products meeting the requirements of the Buyer (the “Project”); 鉴于,双方愿意就供应方向IAC和/或其关联方(合称“买方”)供应[填入产品名称](“产品”)之目的与对方合作(“项目”),以确定符合买方要求的产品规格; WHEREAS, in connection with the Project, each of the Parties has provided and may continue to provide the other Party with certain Proprietary Information (as defined below); the Party providing any Proprietary Information hereunder may also be referred to as the “Disclosing Party” and the Party receiving any Proprietary Information hereunder may also be referred to as the “Receiving Party” (which, in the case of IAC, shall also include its affiliates which are Buyers of the Products from the Supplier); and

相关主题