目录摘要............................................................................ - 0 -引言............................................................................ - 2 -第一篇设计说明书..................................................... - 4 -第一节变电站主接线选定方案................................................... - 4 -第二节变压器选定方案.............................................................. - 5 -第三节断路器与隔离开关选定方案....................................... - 6 -第四节母线选定方案.................................................................. - 7 -第二篇设计计算书 ................................................. - 8 -第一节电气主接线........................................................................ - 8 -第二节主变压器选择.................................................................. - 18 -第三节设备型号选择.................................................................. - 21 -断路器与隔离开关的选择 ..................................................... - 24 -母线的选择 .............................................................................. - 29 -设计心得体会............................................................ - 33 -摘要由发电、变电、输电、配电和用电等环节组成的电能生产与消费系统。

它的功能是将自然界的一次能源通过发电动力装置转化成电能,再经输、变电系统及配电系统将电能供应到各负荷中心。

电气主接线是发电厂、变电所电气设计的首要部分,也是构成电力系统的重要环节。

主接线的确定对电力系统整体及发电厂、变电所本身的运行的可靠性、灵活性和经济性密切相关。

并且对电气设备选择、配电装置配置、继电保护和控制方式的拟定有较大的影响。

电能的使用已经渗透到社会、经济、生活的各个领域,在国民经济中的地位越来越高。

本文是对220KV电压等级变电所一次部分的初步设计,主要完成了电气主接线的设计。

包括电气主接线的形式的比较、选择;主变压器、启动/备用变压器和高压厂用变压器容量计算,台数和型号的选择;短路电流计算和高压电气设备的选择与校验。

关键词:变电所;电气部分;变压器;主接线设计;电气设备ABSTRACTBy power generation, the substation, transmission and distribution and power consumption of links such as electric power production and consumption system. It's the function of the nature a energy through the power generation power device into electrical energy, then after losing power distribution system and distribution system, electric power supply to the load center. The main electrical wiring is power plants, substation electrical design's first part, also be constitute the important link of the power system. The determination of the wiring in power system and power plants, whole substation of the reliability of the operation itself, flexibility and economy closely related. And for electrical equipment selection, power distribution equipment configuration, relay protection and control of the recommended way to have a major influence. The use of electricity has penetrated into society, economy, life in all areas, in the position of the national economy is getting higher and higher. This paper is to 220 KV substation voltage level is a part of the preliminary design, the main finished the design of the main electrical wiring. Including the main electrical wiring form of comparison, choice; The main transformer, start/standby transformers and high pressure factory with the transformer capacity calculation, the Numbers and types of choice; Short circuit current calculation and the high voltage electrical equipment choice and calibration.Key words:converting station,Electrical part,transformer,The Lord wiring design,Electrical equipment引言在高速发展的现代社会中,电力工业在国民经济中有着重要作用,它不仅全面地影响国民经济其他部门的发展,同时也极大的影响人民的物质与文化生活水平的提高。

一、设计在工程建设中的作用设计工作是工程建设的关键环节。

做好设计工作对工程建设的工期、质量、投资费用和建成投产后的运行安全可靠性和生产的综合经济效益,起着决定性作用。

设计是工程建设的灵魂。

设计的基本任务是,在工程建设中贯彻国家的基本建设方针和技术经济政策,做出切合实际、安全实用、技术先进、综合效益好的设计,有效的为电力建设服务。

二、设计工作应遵循的主要原则1.遵守国家的法律、法规,贯彻执行国家的经济建设方针、政策和基本建设程序,特别应贯彻执行提高综合经济效益和促进技术进步的方针。

2.要运用系统工程的方法从全局出发,正确处理中央与地方、工业与农业、城市与乡镇、近期与远期、技改与新建、生产与生活、安全与经济等方面的关系。

3.要根据国家规范、标准与有关规定,结合工程的不同性质、要求,从实际情况出发,合理确定设计标准。

4.要实行资源的综合利用,节约能源、水源,保护环境,节约用地等。

三、设计的基本程序设计要执行国家规定的基本建设程序。

工程进入施工阶段后,设计工作还要配合施工、参加工程管理、试运行和验收,最后进行总结,从而完成设计工作的全过程。

第一篇设计说明书第一节变电站主接线选定方案变电站电气主接线是指变电站的变压器、输电线路与电力系统相连接的形式,从而完成输配电任务。

变电站的主接线是电力系统接线组成中的重要组成部分。

主接线的确定,对电力系统的安全、稳定、灵活、经济运行以及变电站电气设备的选择、配电装置的布置、继电保护和控制方法的拟定将会产生直接的影响。

根据对原始资料的分析,现将各电压等级可能采用的较佳方案列出。

进而,以优化组合的方式,组成最佳可比方案。

10KV双母线分段ZN12-10/2500GN2-10/3000第二节变压器选定方案主变压器:两台220KV无励磁调压三绕组变压器站用变压器:两台80KW的双绕组变压器供给站用变变压器技术参数序号型号额定容量(kvA)容量比额定电压(kv)连接组标号空载损耗(kw)空载电流(%)阻抗电压(%)第三节断路器与隔离开关选定方案220KV侧110KV侧第四节母线选定方案220KV侧第二篇设计计算书第一节电气主接线一、电气主接线的意义和要求电气主接线是发电厂、变电所电气设计的重要部分,也是构成电力系统的重要环节。

主接线的确定对电力系统整体及发电厂、变电所本身运行的可靠性、灵活性和经济性密切相关,并且对电气设备选择、配电装置布置、继电保护和控制方式的拟定有较大影响。

因此,必须处理好各方面的关系,全面分析有关影响因素,通过技术经济比较,合理确定主接线方案,决定于电压等级和出线回路数。

电气主接线是由高压电气设备连成的接收和分配电能的电路,是发电厂和变电所最重要的组成部分之一,对安全可靠供电至关重要。

因此设计的主接线必须满足如下要求:(1) 满足对用户供电必要的可靠性和电能质量的要求;(2) 接线简单、清晰,操作简便;(3) 必要的运行灵活性和检修方便;(4) 投资少,运行费用低;(5) 具有扩建的可能性。

二、接线方式选择220KV电压等级主接线选择:备选方案:(1)双母线:双母线接线有2组母线,并且可以互为备用。

它的特点是:供电可靠,调度灵活,扩建方便,能广泛用于出线带电抗器6-10KV配电装置;35-60KV 出线数超过8回,或连接电源较大、负荷较大时;110KV-220KV出线为4回及以上时。