专业外文翻译原文road surface of pitch1 Debulk1.1 SummaryGood pitch road surface quality is it reflect , appear any quality defect will all that has been achieved has come to nothing in rolling through rolling to want. The durable performance of meeting pitch road surface of the structure demand is affected by two indexes mainly, namely the mixture and debulk designed. In these two indexes , lack any durable performance that can't ensure the pitch road surface , if insufficient debulk, optimum mixture that design will reduce serviceability , pitch of road surface, and good debulk can improve the result of a kind of nonstandard mixture effectively . So, debulk is considered to influence one of the most important factors of durable performance of road surface of pitch .Debulk course to reduce pitch course , air vent of content in the mixture, for solid particle stemming and orientating among one viscoplasticity medium course this, in the form of forming a kind of closely more knit and more effective particle to arrange. This course only takes place under the construction state in theory, but not under the traffic condition.1.2 Impact on debulk of composition material on the pitch road surface1.2.1collects material performancein order to reach the ideal solidity of pressing, it is very important to collect material and detailed some nature of collecting material thickly: Such as the particle form, raised angle , the absorbing water rate and surface are constructed, grade mix mixture most heavy to collect material size , thick to collect material proportion , consumption and type ,etc. , consumption of sand and powder of ore pigeonhole to pitch mixture solidity have direct influence.Under the same situation as other indexes , collect material one grade of mixture or disconnected grade mixed and mix mixture than exchanging debulk more than the single size from thick to the detailed even grade of mixture mixed , thick to collectmaterial proportion heavy pitch mixture, must increase the strength of keeping notably , could obtain the necessary space rate . On the other hand, many sand, or detailed grade buy bituminous concrete to be very much easy to be plastic, this kind of mixture is still difficult to reach proper closely knit degree. The pitch mixture of much sand tends towards pushes and shoves and difficult with debulking under debulk function . The different kinds of packing has remarkable influence on debulk of the pitch mixture, according to survey, in a situation that other conditions are the same, ordinary silicate packing than lime stone ore powder pitch mixture and cement stone pitch mixture easy debulk bituminous concrete, pitch mixture total hole rate too very heavy difference have behind the shaping, 8% , 9.1% , 12% respectively.1.2.2pitch viscidity influencepitch viscidity influence pitch mixture strength degree, and can debulk nature have something to do with mixture. At the mixture, high viscidity can pin down particle move often as debulk pitch, if pitch viscidity too low, is it collect material to be particle easy to move and push and shove in real time to press. When pitch mixture temperature is higher, pitch is it is it collect material particle rub lubricant of obstruction to overcome to make, when the mixture has already been cooled, the pitch makes and combines the combinationmaterial which is collected the material particle. Generally speaking, in fixed 135 pitch being viscidity high,resistance, mixture of person who reduces space the heavier. So use high viscidity at the pitch , adopt higher debulk temperature to reduce viscidity promote pitch road surface but debulk essential means. Show according to materials data give temperature definitely , low drip of viscidity educate than high closely knit high degree that pitch reach of viscidity, through rise debulk temperature, high viscidity drip is it can reach high solidity of pigeonholing as low viscidity pitch to educate. Therefore understand debulk state , pitch of viscidity under the temperature to promote pitch road surface good debulk there are important meanings.1.2.3 performance of mixture influencein fact, performance , pitch of mixture, influence degree, road surface of debulk the heaviest to pitch, the influence than simple to collect material or drip breedobvious even. When pitch consumption is lower in the pitch mixture easy to is it do astringent , coarse mixture to form, often difficult debulk; When pitch consumption is too great, can form and lubricate the mixture excessivly , make the mixture under the function of the road roller, form unstable and can fracture ing , mixture suffused with the oil after the traffic is open; For lower than best pitch mixture of consumption, can through increase efficiency , debulk of course reduce the space rate, reach a kind of satisfaction; But if pitch consumption at the optimum value of higher thanning , press real-time , can't prevent out of shape limit , pitch of mixture from almost; Secondly , collect material water content meet the requirement of norm minimum while drying, such wet pitch mixture, present the inclination moved in the course of debulk, it is very difficult for the result to press worker.1.3 Temperature impact on pitch roadsurface debulk pitch debulk performance , mixture of road surface receive match ratio design, influence of factor, variety of pitch and temperature ,etc. of debulk, it is the most influential but with debulk temperature. As everyone knows, the properties of pitch and pitch mixture are very sensitive to temperature, is it can know (125C1130 ) in the same grade is it under the mixture , roll rising of temperature at the same time to mix to test. Mixture try on pieces of density increase , air rate reduce , until a certain temperature (145 1150 ) , mixture try on a density up to most heavy, at the same time the air rate is dropped to minimumly . If is it rise to continue under temperature this, can make density reduce, atmosphere rate increases. It is obvious temperature of mixture on the low side on the high side , will influence density and air rate , pitch of mixture (pigeonhole the solidity). The temperature of the pitch mixture is very important too in debulk of the construction site mixture. The temperature of the mixture has already become one of the two major factors influencing the solidity of high pressure of construction site and low air rate. Dark- Kui expressway layers of grains of type in being thick for 4cm the pitch. Construct location windy (4-5), organize the pitch but layer construct in with high temperatures period only, keep temperature bring 80 one 90 up to , make layer receive further debulk the pitch after all.1.4 mechanical impact on pitch roadBecause pitch road surface quality should reflect the mechanical impact on pitch road surface debulk of debulk through rolling finally, so, the selecting type and disposing of debulk machinery seems particularly important. Dark- expressway two bid section (13.4km ) pitch concrete road surface project Kui, construct by Xinjiang the north new construction of road and brige Limited Company, the layers of structure for 6cm thick grains of type grains of grains of type bituminous concrete of the type ten 4cm in the +5cm, the lower floor is the cement stability gravel storey. Each constructed to begin since April of 2000 by the end of September of the same age. Pitch by day work N eight P-1600 for dose rein in 1800 types mix and stir , paver of mixing and stir etc. mixture. According to the regional climate situation of known construction , and mix and stir the productivity of the equipment , paver, transporting the distance and transportation situation, the characteristic of the mixture, pave the thickness, pave layers of location ,etc. , select and make up to the mechanical pattern. Namely use two CC2l a pair of steel and a round of vibration road roller while pressing for the first time , press quietly twice at the speed of 3-5km; When is it press to replying, adopt two CC21 pairs of steel rounds of vibration road roller still, vibration at the speed of 4-5km/11 roll four, dispose the tire road roller of a Model YL16 at the same time, roll twice at the speed of 4-5km/h; After all when pressing, adopt one 2Y8/10 pairs of steel rounds of vibration road roller, at the speed of 3-4km/h quiet to press and accept mere twice. Make from the machinery of the above up and analyse that can be drawn , the having direct relations all over the speed that is counted , rolling with rolling of debulk on the road surface . As thickness , environmental temperature , effective debulk time of paving being when constructing within the person who allow, the ones that rolled would play a decisive role to the debulk of the road surface all over the speed that is counted with rolling.Can know according to experience. The rolls and only fix through testing section all over countinging of pitch road surface, and should also be in the type of the road roller, solidity of pressing, shake frequently under the situation confirmed of valid debulk time of the amplitude , mixture, could get . Can select through conclusion totest section to debulk speed at the same time. By result of the test analyse can know , while rolling all over counting the samly , roll slow than roll speed get high solidity of pigeonholing soon, but it is only higher to press the solidity 0.4-0.8, there is no actual use value, while replying and press and press after all, should try one' s best to choose the high speed of rolling , in order to improve and press the mechanical homework efficiency of the way, reduce its quantity allocated1.5 pitch concrete glueand form analysis and research VFA (pitch consumption) of strength and pitch kind to solve pitch concrete glued and marries the strength problem. Because Marshall's test method has not already accorded with the actual conditions(because the concrete road surface of pitch has been pressed gently by the automobile tire on the real highway, Marshall test hit real number of times whether two sides each hit 75 times, if increase and hit the real number of times at the same time, aggregate break up and break to pieces, but gentle to press and increase aggregate have broken situation take place even quiet year again), so we must solve with other theory pitch concrete oilstone of as with glueing reason of envelope come and explain pitch concrete oil film thickness of as problem we (oilstone than) problem, we spread certain paste to paste while glueing envelopes, with the increase of the pressure, the surplus paste is crowded out, the tighter the envelope mouth is glued, there is the relation between certain pressure and thickness of the paste, the bigger the pressure is, the thinner the thickness of the paste is, it is the bigger to glue the strength of forming. The thickness of oil film of concrete of pitch is the same too, the greater the pressure of rolling the equipment (the tire) adopted when we construct is, keep high temperature for the first time, oil film thickness thin, pitch concrete that form it glues to be heavy to marry strength, this is that the American engineer JOHN.L.MCRAE gentleman's GTM machine rotates the gentle theory of pressing, this GTM testing machine has well solved the equipment (the pressure of the tire) of rolling, rolls the relation that temperature compares with oilstone (the thickness of the oil film). Seeing that of our country large-scale car amount tire pressure up to 1.0 Mpa more than already, propose and use GTM testing machine go on and rotate with 1.0 pressure of Mpa gentle to pigeonhole, temperature130 ∽ 135 when testing, after being steady in order to design the amount of oil used with the oil amount. The on-the-spot construction technological requirement is replied and pigeonholes the temperature after finishing to control above 130 degrees, press and adopt the large tonnage tire road roller for the first time (pressure of tires is more than of 1.0 Mpas).The kind of the pitch and ore material glue the strength of forming influencing the pitch concrete to the seizing of the pitch directly in addition, so the good modified pitch with good resisting splitting at the time of the low temperature at the same time of high-temperature stability has appeared at home, and should deal with the acid and neutral hard quality ore material , improve the seizing, generally adopt and catch the lime wash and is washed or mixed and adds the quick lime powder or low grade cement.2 Pitch preventative maintenance and machinery of concrete road surface2.1 The characteristic of concrete road surface of original sin and type of damagingPitch because concrete road surface use and glue and form strength better pitch material made and combine the material , therefore gluing the strength of forming while strengthening the ore material greatly , has improved the intensity and stability of the mixture, make to use the quality and durability raise road surface . Pitch concrete road surface have surface level, infiltrate, drive a vehicle advantage comfortable, with low noises, therefore find more and more extensive application. But it is often influenced by respects, such as weather, temperature, driving a vehicle and material, and such reasons of the respect as the road surface structure is designed, will present various disease unavoidably, and the disease has brought harmful influence on driving speed, road surface service life, passenger's comfortableness and traffic safety.Pitch damage of concrete road surface overall to can be divided into two big classes, one is structural damage , including the destruction of a certain part whole or among them of structure of road surface , the ones that made road surface unable tosupport and is scheduled loaded; Another functional damage, it might follow and structural damage take place, but because roughness and resisting the decline in slippery performance,etc. make it not have a function booked again, thus influenced quality of driving a vehicle.Pitch early disease of concrete road surface show as early rut and decay of roughness, suffused with oil and resist slippery decline of performance often at expressway, show as early small crack at ordinary arterial highway, detailed material lose cause undisguised, polishes, , the host is lost, surface disease that the road surface infiltrates. That the pitch wears out. If disease the can deal with but develop as one pleases in early days, must lead to the fact surface to be loose further, or cause serious deformation disease, such as peeling off and rut of depth of lower floor. Because of infiltrating, then cause structural damage, such as whole trough, thus must adopt the repairing method to carry on road surface maintenance. So seek one swift helping, cost rational settlement pitch concrete road surface early applicable technology of disease to maintain to be solved problem urgently in the work2.2 Important meaning of preventative maintenanceAround the relation that is built and maintaining, maintaining and preventing, with the constant perfection of the road network, only keep good road surface serviceability for a long time, the huge investment of road construction could give full play to its investment benefit , keep road surface good technological state must have one maintaining and support system come guarantee powerful for a long time, come from this meaning and say , maintain a kind of continuation that is road construction in fact. In the road surface maintains the relation with maintenance, People always get used to it after the road surface begins to be damaged for a long time , just remembers that will carry on maintenance to it, Carry on preventative meaning of maintenance know enough often under being also in good state to road surface. Preventative maintenance is a kind of periodic pressure maintenance measure in fact, it does not consider whether there is a certain damage on the road surface, Preventative maintenance best to implement opportunity should to in good state still in road surface, or go on only at the time of some disease omen .Though preventative maintenance needs to invest some expenses, it is a kind of expenses- benefit than very good maintenance measure. American department mentions in the road surface solution , what the American road industry was once passed to different grades of hundreds of thousands kilometers is followed, find that the serviceability and life-span of these roads have a common change characteristic : A road with qualified quality, performance drops by 40% within service life 75%, called preventative maintenance stage this stage. Such as be unable to in time maintenance, in 12% service life in the time, performance drops by 40% again afterwards, cause and maintain cost increase by a large margin , call that and correct maintenance stage this stages. Count and draw and invest through investigation 1 preventative maintenance fund can economize 3- l0 yuan correct maintenance conclusion of fund each time. U.S.A. SHRP plan one important achievement point out preventative maintenance delay road surface serviceability worsen the speed, lengthen its service life and economize the important meaning of expenses of life cycle.Correct serviceability that implement preventative maintenance and can keep the road surface good , lengthen life cycle of road surface , reduce life cycle expenses and economize and maintain the fund. Plan and estimate according to SHRP , go on preventative maintenance of 3-4 can lengthen 10- 1 years such as service life within life cycle of whole road surface, economize and maintain 45-50% of expenses, these foreign experience of benefitting is worth we drew lessons from . Need emphasize , implement to one- two road preventative maintenance can not give full play to his potential benefit and function only, put it preventative maintenance in network of highways support height of the system pay only, could fully embody its important strategic meaning and function .2.3 Choose suitable preventative maintenance machineryCarry on maintenance promptly when the road surface presents disease omen , make it not happen or continue developing, expanding , influence the stability of the basic unit, should carry on preventative maintenance. Preventative maintenance capital equipment have and irritate and sew machinery, road surface part mend homework machinery, heavy area surface punish machinery, usually.The pressure type irritates the sewing machine: Adopt artificial way to irritate and sew the homework, though can prevent the infiltration of the sub-surface of rainwater , alleviate the development with further crack, but because the sealed material is not irritated deeply enough, it is very difficult to reach the lasting result. Adopt pressure type irritate person who sew can irritate deep layer to reach the crack sealed material, irritate and sew better result , can lengthen service life of road surface , raise and go the security and comfortableness of the vehicle.Irritate and sew homework want and carry on clear to go on and irritate and sew after sewing first generally, greater than 3 crack of mm need and slot the homework generally. Irritate the heating that the sewing machine should be furnished with the control device of pressure, sealed material mainly or keep the device warm, for prevent spray gun hose from stop up and should take corresponding heating, keep measure warm also. The main characteristic of the pulling type is: Heat storehouse volume 470L, relatively more complete function havesuitable for irritating and sewing the homework by a large scale. Pair set up yuans of hand person who push away hot to irritate heating storehouse of person who sew volume 40 L, small easy to operate using flexible, low fabrication cost company, can look at according to work load feeling worthy of and heat cauldron again separately, suitable for hot to caulk the irritating and sewing the homework of material mainly; Have function cold to irritate person who sew without heating, use polymer modify water quality caulk the material mainly. If department pitch cold to irritate and sew material to modify emulsification, as emulsification after the solidification pitch, the modified pitch and crack of high polymer are glued and formed closely, can guarantee that there is good strength of seizing to irritate and sew the material and crack . Because cold to irritate and sew simple, easy to use craft, road surface give person who defend maintenance have wide prospects in pitch.Mend the hole machine in spraying type: Person who spray pitch road surface mend technology one high-efficient mending road surface hole maintenance technology of pool fast, cardinal principle to utilize way of spaying with high presure , mix emulsification pitch that heat already through nozzle with conveyer belt dept. oforthopedics come to convey, spray the mixture to the hole pool of road surface evenly through the compressed air at a high speed, because passing through function reaches and glues the result formed closely knitly. Because craft simple, need and go on and roll again, mend hole short activity duration, can open traffic quickly.Hope that you remember my result every day. Car chassis (or pulling type); Pitch pot of emulsification and heating and keep the device warm, sending the pipeline; The aggregate stores the storehouse and conveyer belt; The cleaner stores the pot; Liquor pressure drive; Air compressor machine and nozzlemake up . In pool go on and clear up, after repairing, attenbant need and know one nozzle (operate button at nozzle handle) can finish the hole pool of road surface mend the homework only to hole. Should pay attention to controlling the quality of the good aggregate and grading in using; Choose the broken milk tempo of the good emulsification pitch ; Grasp the spraying amount and so as to ensure roughness of road surface after mending, Mend machinery in hot regeneration of road surface : For economize valuable way spend material, reduce and mill old material pollution of the environment these come down to plane, many place popularize old way spend regeneration of material, pitch hot recycled craft because with cold to mill- factory mix recycled craft compare on the spot among them in a more cost-effective manner, reduce old material freight and factory mix regeneration need use continuous type to mix and stir the reasons, such as equipment. Generally, the maintenance of the expressway is widely used with maintaining in JiangsuProvince. Reach materials that company offer according to Great Britain, " repair the roads king " its mend method compare with traditional method, it can save 5/6 to mend time, personnel save 1/2 for homework, the old way totally utilizes with the material, new pitch mixture consumption can save 1/2 .Hot recycled key part of equipment to heat board mainly on the spot, it want offer high-efficient heat energy of radiating, heat and should short time to old road surface have, and reach certain depth; Can't be overheated, make the pitch wear out , lose the recycled meaning. Great Britain reach company repair the roads king heat board take interval heating way, can one is penetrated to the road surface deep layer, and road surface top layer pitch wear out again and hotly, well solve this problem . Inaddition according to mend area of uniform size, heat board it's better to have the sub-zone function.The rare thick liquid seals one layer of pitch rare thick liquid of emulsification with modifying and seals one layer of pavers: Rare thick liquid seal layers of technology to new, old wear out, crack, smooth loose of road surface, hole trough. Disease can play prevent and function of maintenance, make road surface waterproof, resist slippery, levels, wear-resisting performance is raised rapidly. In recent years, because rare thick liquid seal layers of standardization that construct, standardize, construction quality raise and reducing of cost, rare thick liquid seal layer apply common road and expressway maintained and had in early days extensively already.Modify emulsification pitch rare thick liquid seal layer modify emulsification pitch with roll and break to pieces by water quality high polymer intensive material, mineral packing, water and surface that additive make up punish layer one, can pave the thin layer , solidify fast, can open traffic in an hour after constructing in characteristic, because modify the pitch rare thick liquid of emulsification seal one layer of solidification time faster than the ordinary rare thick liquid, modify emulsification pitch rare thick liquid seal layer can seal than traditional rare thick liquid layer thick. Used in the punishment of constructing disease, such as repairing, chap, rut, etc. of road surface mainly, can be used for sealing and improving resisting slippery punishment of road surface. But modify the pitch rare thick liquid of emulsification is the same as other thin layers are punished, only have highway section with steady structure now suitably, must construct after mending strongly when curved sinking value is not enough. Guarantee modify emulsification pitch there aren't the thick liquid not rares. Modify emulsification pitch rare thick liquid material viscidity heavy, pave layer relatively thick, generally speaking, modify emulsification pitch raise than the emulsification pitch viscidity not modifying by 30-50%, result in and make obstruction heavy thick liquid, the speed slows down. Demand and modify emulsification pitch rare thick liquid seal layers of equipment device corresponding to strengthen power store to make thick liquid, cloth fast, mobility fine, cloth speed pave range that the thickness regulate heavy, in order to meet modifying the constructionrequest for sealing layer of rare thick liquid of pitch of emulsification.The pitch road surface maintains machinery and cares the car synthetically, cares the car etc. multi-functionally, have given play to one's own characteristics in the maintenance of the superhighway. As the constant increase,, especially the expressway of the superhighway increase, and the constant innovation on maintenance work craft and material , the mechanical manufacturer to maintaining , including the respects, such as designing, making, after-sale service. Put forward higher and higher request. Too should maintain mechanical applying unit from maintenance, quality of attenbant of equipment, maintenance exertion of material,etc. pays enough attention, it is in many aspects to accomplish, multi-disciplinary close cooperation, could promote the preventative maintenance mechanized development of the highway to the maximum extent .3 pitch concrete road surface in constructing1.one of precautions infiltrate, design and grade kind pitch concrete match ratio very in theory in constructing, in not butting if can't construct it guarantee by pitch concrete homogeneity(include and grade and last homogeneity that shut pitch , homogeneity that pave, roll homogeneity of shaping), pitch concrete road surface equally will produce infiltrate, purt thick liquid, rut, suffused with oil,etc. destroy the phenomenon in early days. Stone fit expressway pitch concrete finish adopt many broken stone pitch concrete (SAC) make finish structure, SAC structure does not infiltrate theoretically, and have good resisting the slipping and temperature stability, can meet and construct TD of depth > request for 0.7mm, why is it very good in some paragraphs on the line of Ann of stone, some paragraph very serious to destroy phenomenon in early days, main reason to guarantee pitch concrete homogeneity of road surface and pigeonhole solidity, pursue the roughness to cause excessivly. Guarantee pitch homogeneity of concrete and pigeonhole solidity key problem very in constructing. Sand celebrate academician Lin in " expressway pitch road surface destroy phenomenon with predict " book chapter ten describe to pitch concrete importance of homogeneity specially " in early days. Only brief here to sum up the。