当前位置:文档之家› [北京]办公楼及钢结构厂房施工组织设计(中英文对照)gnx

[北京]办公楼及钢结构厂房施工组织设计(中英文对照)gnx

XXX3期扩建工程Ebne Taicang Period-III ExpansionProject施工组织设计Construction Organization Design Nanjing Overseas Building Construction Corporation目录Contents编制说明和编制依据 (11)Chapter One Compilation Instructions and Bases (11)1.1 编制说明 (11)1.1 Compilation Instructions (11)1.2 编制依据 (11)1.2 Compilation Bases (11)第二章.工程概况 (12)Chapter Two Project Outline (12)2.1 工程概况 (12)2.1 Project Outline (12)2.2 现场状况 (16)2.2 On-the-site Condition (16)2.3 业主要求 (17)2.3 Owners’ requirements (17)第三章.工程施工目标 (18)Chapter Three Goal of Project Construction (18)3.1 工期目标 (18)3.1 Time Limit (18)3.2 质量目标 (18)3.2 Quality (18)3.3 安全目标 (19)3.3 Safety (19)3.4 文明施工目标 (19)3.4 Civilized Construction (19)第四章.施工规划 (20)Chapter Four Construction Plan (20)4.1 机构与管理 (20)4.1 Organization & Management (20)4.2 质量管理网络 (24)4.2 Quality Control Network (24)4.3 安全管理网络 (26)4.3 Safety Control Network (26)4.4 文明施工组织网络 (27)4.4 Civilized Construction Organization Network (27)第五章.施工部署 (30)Chapter Five Construction Planning (30)5.1 总体安排 (30)5.1 Overall Arrangement (30)5.2 施工程序 (32)5.2 Construction Procedures (32)5.3 加强现场协调工作 (35)5.3 Strengthening of on-the-site coordination (35)第六章.施工准备 (35)Chapter Six Construction Preparation (35)6.1 建立工程管理组织 (35)6.1 Establish project management organization (35)6.2 施工技术准备 (35)6.2 Technical preparation for construction (35)6.3 施工现场准备 (37)6.3 Preparation of construction site (37)6.4 劳动力组织 (38)6.4 Labor force organization (38)6.5 施工材料准备 (41)6.5 Preparation of construction materials (41)6.6 施工用电计划 (42)6.6 Construction electricity use plan (42)6.7 施工用水计划 (45)6.7 Construction water use plan (45)6.8 施工机具准备 (46)6.8 Preparation of construction apparatus (46)第七章.施工进度计划 (46)Chapter Seven Construction Progress Scheduling (46)7.1 施工总进度计划横道图 (46)7.1 General construction progress schedule bar graph (46)7.2 保证进度措施 (47)7.2 Measures to ensure construction progress: (47)第八章.现场平面布置 (48)Chapter Eight Construction Site Layout Arrangement (48)8.1 平面布置原则 (48)8.1 Layout arrangement principles (48)8.2 现场平面布置图 (49)8.2 construction site layout drawing (49)第九章.施工方法及技术措施 (49)Chapter Nine Construction method and technical measures (49)9.1、施工测量、定位放线 (49)9.1 Construction surveying, positioning (49)and setting out9.2基坑开挖 (55)9.2 Foundation pit excavation (55)9.3垫层施工 (57)9.3 Cushion construction (57)9.4 钢筋绑扎和安装 (57)9.4 Rebar tying and erection (57)9.5模板工程 (59)9.5 Form (59)9.6混凝土工程 (72)9.6 Concrete work (72)9.7砌体工程 (75)9.7 Masonry work (75)9.8 装饰工程 (78)9.8 Ornament work (78)9.9 屋面工程 (83)9.9 Roofing (83)9.10 门窗工程 (83)9.10 Doors and windows (83)9.11 脚手架工程 (84)9.11 Scaffolding (84)9.12 给水排水、采暖、消防工程 (86)9.12 Water supply & drainage, heating and fire fighting (86)9.13 电气工程 (104)9.13 Electric work (104)第十章.钢结构施工方案 (115)Chapter Ten Construction Plan for Steel Structural Engineering (115)10.1 工艺流程 (116)10.1 Process flow (116)10.2 施工组织管理网络 (118)10.2 Construction organizing and management network (118)10.3 施工总体步骤 (118)10.3 Overall construction procedures (118)10.4 钢结构施工方法 (119)10.4 Construction method of steel structure (119)10.5 钢结构的安装 (132)10.5 Erection of steel structures (132)10.6 吊装质量保证措施 (142)10.6 Assurance measures for good erection (142)10.7 质量检验标准 (143)10.7 Quality inspection standard (143)10.8 针对本工程特点采用的特殊措施 (144)10.8 Specific measures for this project (144)第十一章.计划投入的主要施工机械设备表 (148)Chapter Eleven List of Planned Main Construction Equipments (148)第十二章.季节施工 (154)Chapter Twelve Seasonal Construction (154)12.1 冬季施工措施 (154)12.1 Precautions in winter (154)12.2 雨季施工措施 (155)12.2 Precautions for rainy seasons (155)12.3 夏季施工措施 (158)12.3 Precautions in summer (158)第十三章.施工配合组织 (160)Chapter Thirteen Supporting Organization (160)第十四章.质量管理及质量保证措施 (163)Chapter Fourteen Quality Supervision (163)& Quality Assurance Measures14.1质量目标 (163)14.1 Quality goal (163)14.2 保证体系 (164)14.2 Assurance system (164)14.3 控制措施 (170)14.3 Control measures (170)14.4 钢结构制作质量保证措施 (172)14.4 Quality assurance measures (172)for making steel structure14.5 钢结构安装质量保证措施 (176)14.5 Quality assurance measures for installing steel structure (176)14.6 屋面、墙面、彩钢板施工质量保证措施 (177)14.6 Construction quality assurance measures (177)for roofs, walls and colored steel plates第十五章.安全管理及防范措施 (179)Chapter Fifteen Safety Control & Precautions (179)15.1 安全管理目标 (179)15.1 Safety Control Objective (179)15.2 保证体系 (179)15.2 Assurance system (179)15.3 保证措施 (182)15.3 Assurance measures (182)15.4 工艺对安全的保证……………………………………………………18415.4 Safety assurance of process (184)15.5 用电管理 (185)15.5 Power management (185)15.6 消防保卫管理 (186)15.6 Fire protection safeguard management (186)第十六章.现场环境管理措施 (187)Chapter Sixteen On-the-site Environmental (187)Management Measures16.1目标管理 (187)16.1 Objective management (187)16.2建立管理责任制 (187)16.2 Establishment of management (187)responsibility system16.3现场标识管理 (187)16.3 Management of on-the-site signs (187)16.4现场环境卫生管理 (188)16.4 On-the-site sanitation management (188)16.5文明施工 (188)16.5 Civilized construction (188)16.6环境保护措施 (189)16.6 Environmental protection measures (189)16.7防止噪音污染措施 (190)16.7 Measures for preventing noise pollution (190)第十七章.附图表 (191)Section Seventeen Attached Tables (191)1、现场平面布置图 (191)1. On-the-site plan layout (191)2、施工总进度计划横道图 (191)2. General construction progress bar chart (191)第一章编制说明和编制依据Chapter One Compilation Instructions and Bases1.1 编制说明:1.1 Compilation InstructionsXXX3期扩建工程施工组织设计系本工程的招标文件。

相关主题