目录Contents第一节编制依据Reference (4)第二节工程概况General Information of the Project (5)2.1概况 Condition (5)2.2现场情况Site Condition (6)2.3工程特点 Characteristic of Project (7)第三节劳力及机具资源配置情况State of resource layout for labor and equipment (8)3.1 劳动力资源配置表labor configuration table (8)3.2机具配备动态计划表equipment configuration state schedule (9)第四节钢结构安装工艺Steel Structure Installation Techeniques (10)4.1安装思路 (10)4.2钢结构安装工艺流程Installation Workflow in Steel Structure (10)4.3 PART-A&C吊装顺序及工况分析Arrangement to PART-A&C Crane and Walking Way; (29)4.4吊机性能表 (30)4.5吊机行走路线图 (33)4.6 PART-A&C 钢柱吊装立面及平面图;The façade and plan for lifting of column (35)4.7 PART-A&C 最重的钢梁吊示意图;The schematic plan for lifting of the heaviest beam (35)4.8 139.8米标高梁吊装立面图;The façade for the beam which elevation is 139.8m (35)第五节垫板及二次灌浆施工艺The shim plate and construction process for concrete and the second time grouting .. (39)5.1垫板工艺要求 the requirement for the shim plate process (39)5.2二次灌浆施工艺 construction process the second time grouting (40)5.3养护Maintains (41)第六节高强螺栓施工工艺High Strengthen Bolt W orkingProcess (41)6.1 一般规定 General requirement (41)6.2安装前的检查工作inspection working before installation (43)6.3质量标准 Quality standard (51)6.4应注意的质量问题 Quality issues with attention required (53)6.5质量记录 Quality record (54)第七节焊接施工工艺Welding Techniques (54)7.1准备工作 Preparation Work (55)7.2焊接工艺 Welding Techniques (55)7.3焊接工作质量控制 Welding Quality Control (57)第八节油漆涂装施工工艺Painting work construction job .578.1涂装工艺Painting Technique (57)8.1.1工艺流程图Process Flow Diagram (PFD) (57)8.1.2涂装工艺Painting Technique ......................错误!未定义书签。
8.1.3构件表面处理Member Surface Treatment ............错误!未定义书签。
8.1.4油漆修补涂装Repairing Paint .....................错误!未定义书签。
8.2质量控制和质量保证措施Quality Measures .............错误!未定义书签。
8.3安保措施 HSE Measures ..............................错误!未定义书签。
第九节测量方案 (66)9.1准备工作Preparation Work (66)axes setting-out (67)9.2平面控制网的建立 Set-up of horizontal control network (69)9.3高程控制网的建立 (71)9.4钢柱控制测量 control measure of column (72)9.5沉降观察测量Measurement to Settlement (74)9.6测量精度保证措施Main Measurement to ensure the precision of the Measurement (76)9.7工程测量记录The Record in the Construction Measurement (76)第十节质量技术措施Quality Measures (77)10.1工程施工质量目标Project Construction Quality Target (77)10.2工程施工质量控制总体思路Guideline of project construction quality control (77)第十一节安全技术措施Safety measures (80)11.1安全操作平台 Safety Operation Platform (80)11.2爬梯 ladders (81)11.3生命绳 life line (84)第十二节安全管理措施Safety Management Measures (87)12.1作业人员的管理 Management of Operation Personnel (87)12.2机具管理 Management of Machinery and Tools (87)12.3临时用电的管理 Management of Temporary Electricity Supply (87)12.4脚手架的管理 Management of Scaffold (88)12.5进场道路的管理 Management of Entering Road (88)12.6劳防用品的管理 Management of PPE (88)12.7风险预知管理Risk Prediction Management (88)第一节编制依据 Reference1.1本工程招标文件;The bid document for the project1.2道康宁公司相关技术标准、规范及管理程序;The Dow Corning’s relevant technical standard, the specification andmanagement program.1.3东洋工程公司相关管理程序、技术标准;Toyo Engineering Corporation’s relevant management program and technicalspecification.1.4江苏省及张家港地区现行的相关地方标准、规范;The relevant location standard and specification which belongs to Jiangsuprovince and Zhangjiagang area.1.5.宝冶建设有限公司相关管理程序及企业标准Baoye Construction Corp.Ltd.’s management program and standard1.6相关标准及规范,部分摘录如下:The country’s relevant standard and the specification, as following: 《张家港油漆涂装标准》 09.061.000;《Zhangjiagang standard for painting and protective coatings》09.061.000;《建筑工程设计文件编深度规定》2003版;《Construction engineering design document》-2003《建筑结构可靠度设计统一标准》GB 50068-2001;《Construction struction standard》-GB 50068-2001;《建筑结构荷载规范》GB 50009-2001;《Construction struction load specification》-GB 50009-2001;《钢结构设计规范》GB50017-2003《Steel Structure Designing Specification 》GB50017-2003《建筑抗震设计规范》GB 50011-2001《Impermeability of construction design specifications》GB 50011-2001《钢结构防火涂料应用技术规程》CECS 24-90《Steel structure fire retardant coating application technology point of order》CECS 24-90《碳素结构钢》GB /T 700-88《Carbon Structural Steel》GB /T 700-88《钢结构用高强度扭剪型大六角头螺栓》 GB 1228~1231-91《High-strength steel structure with twisting hexagonal Shear big-head bolt》GB 1228~1231-91《大六角头螺母,垫圈等技术条件》The large hexagonal nut, washer, and other technical conditions《钢结构工程施工质量验收规范》 GB 50205-2001《Steel Structure Project Construction Acceptance Specification 》(GB50205-2001)《建筑钢结构焊接技术规程》JGJ81-2002《Architectural Steel Structure Welding Technology Specifications》JGJ81-2002 《钢结构高强度螺栓连接的设计、施工及验收规范》 JGJ 82-91《Steel Structure High Strength Bolt Designing, Construction and Acceptance Specification》(JGJ82—1991)《石油化工企业设计防火规范》 GB 50160-92 (1999年版)《Petrochemical companies code for fire protection design》GB 50160-92 (1999) 《工程测量规范》GB50026-2007Construction Survey Specification, GB50026-2007第二节工程概况General Information of the Project2.1概况 Condition工程名称:道康宁(张家港)有限公司19万吨/年有机硅聚硅氧烷项目(二期)工程Project Name: Dow Corning 190kt/a Siloxane Project in Zhangjiagang(Phase 2)建设单位:道康宁(张家港)有限公司Owner: Dow Corning (Zhangjiagang) Corp. Ltd.管理单位:东洋管理公司Management Company: AKER KVAERNER and TOYO ENGINEERING Corporation设计单位:天津市化工设计院Designer: China Tianjin Chemical Engineering Design Institute监理单位:上海协同工程造价监理咨询有限公司Supervising Company: Shanghai TJU Engineer Service Co., Ltd施工单位:上海宝冶建设有限公司Contractor: Shanghai Baoye Construction Corp. Ltd.道康宁(张家港)有机硅有限公司为美国道康宁在中国境内的全资子公司,位于江苏省张家港保税区附属区扬子江国际化学工业园内。