XXXX风电场XX设备
XX检修标准化作业指导书
批准:__________ __________年_______月_______日
审核:__________ __________年_______月_______日
__________ __________年_______月_______日
编写:__________ __________年_______月_______日
作业负责人:__________
作业时间:______年____月____日____时____分至______年____月____日____时____分
XXXX风电场
目录
1 工作任务 ··············································第___页
2 作业准备阶段·······································第___页
2.1 准备工作······································第___页
2.2 召开班前会··································第___页
2.3 填写并签发工作票 ······················第___页
3 作业阶段 ··············································第___页
3.1 开工··············································第___页
3.2 危险点分析及安全控制措施·······第___页
3.3 作业流程及工艺标准 ··················第___页
3.4 竣工··············································第___页
4 结束阶段 ··············································第___页
5 附件 ······················································第___页
5.1 主要工器具··································第___页
5.2 备品备件及材料 ··························第___页
5.3 人员分工······································第___页
1工作任务
本作业指导书针对上川风电场V52-850风机齿轮箱加油工作。
2作业准备阶段
2.1 准备工作
2.2 召开班前会(详见班组日志)
2.3 填写并签发工作票
认真填写工作票,并经工作票签发人进行审核签发,保证工作票的正确。
3作业阶段
3.1 开工
3.2 危险点分析及安全控制措施
3.3 作业流程及工艺标准
3.4 竣工
4结束阶段
5 附件
5.1 主要工器具
5.2 备品备件及材料
5.3 人员分工。