采购中心常用英文缩写
Process Control Plan Assessment Product Process Validation Pre-Pilot Pilot Problem Report and Resolution Controlled Shipment Engineering Sign Off Off Tooling Sample Engineering Change Request Engineering Change Notice Bill of Material Engineering Bill of Material Process Bill of Material Temporary Substitution Approval Product Data Management Build Issue Report Test Issue Report Geometric Dimensioning Tolerance Vehicle Partitioning & Production Structure Install Assembly Computer Aided Engineering Enterprise Resource Planning
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
PCPA PPV PP P PRR CS ESO OTS ECR ECN BOM EBOM PBOM TSA PDM BIR TIR GD&T VPPS IA CAE ERP
产品开发
缩写 SOR PSA TA SQE PE DRE CME VSE PDT PMT PST APQP DVP&R SOP PPAP AAR PSW SPCR PTR 全称 State Of Requirements Potential Supplier Assessment Technical Assessment Supplier Quality Engineer Product Engineer Design Release Engineer Change Management Engineer Vehicle Sub-system Engineer Product Development Team Product Management Team Product System Team Advanced Product cation Plan and Report Star Of Production Production Part Approval Process Appearance Approval Report Part Submission Warrant SUPPLIER PROCESS CHANGE REQUEST Production Trail Run 中文 产品要求说明 潜在供应商评审 技术评审 供应商质量工程师 产品工程师 产品设计工程师 更改管理工程师 车型支系统工程师 产品开发组 产品管理团队 产品系统团队 先期产品质量计划 设计验证计划和报告 开始批量生产 生产件批准程序 外观批准报告 零件提交保证书 供应商过程更改申请 产品试装
过程控制计划审核 产品和工艺确认 预试生产 试生产 问题报告与解决 受控发运 工程签署 工装样件 工程更改申请书 工程更改通知书 明细表 设计明细表 工艺明细表 临时工程更改及待用批准 产品数据管理系统 试制问题报告 试验问题报告 几何尺寸和公差 汽车零部件分类结构 零部件装配分组 计算机辅助工程 企业资源计划系统
常用英文缩略词
采购贸易
序号 1 2 3 4 5 6 7 8 9 10 序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 缩写 RFQ KD PT CFR CIF FOB CCC 全称 Request For Quotation Knock Down Pass through COST AND FREIGHT Cost,Insurance and Freight Free On Board China Compulsory Certification 中文 报价要求 散件组装 进口的原配供应商提供的零部件或材料 成本加运费 成本加保险费加运费 离岸价 中国强制性产品认证