展会特装英文报价单样本
Height: 4.5 m
Total amount(RMB)
howed by Party B. y Party A, and the additional
ith the same date of start in
jaco8749013
展会特装英文报价单样本Quotation
TO: Attn: Venue: Shanghai New International Expo Centre
NO. A 1 Structure name Ground part space ground General exhibition carpet (color shall be chosen by the customer) 63 m2 10 Subtotal : B 1 2 3 4 5 6 7 Main body Reception desk (with Bar wooden keel, fire board veneer, glass top, Chair) cabinet door, lock Products showcase Lintel Image wall Back wall Light box Cabinets wooden frame, paint on both sides, silver wire drawing wooden frame, fire board veneer wooden frame, fire board veneer wooden keel, fire board veneer wooden keel, fireproof paint, lamps, slides wooden frame, fireproof paint, cabinets door, lock 1 5 1 1 41 5 2 set set set set m2 set set 2,500 2,800 6,500 3,500 200 600 800 Subtotal : C 1 2 3 4 5 6 7 8 D 1 2 E 1 2 workers movers fonts pictures Orther booth shall be constructed and dismantled by professional workers round trip for constructing and dismantling by professional movers 18 2 worker trip 200 500 Subtotal : F 1 Adittional fees electric box 30A380V three-phase power 1 set 1,800 Lights and furniture booth paing wire lights Negotiating tables and chairs Plasma TV Sofa Drinking fountains, trash can potted flower green plants Art bubble word, KT board pictures, images, art photoes 1 1 set set 1,200 2,500 Subtotal : 3*6㎡ shealthed wire Downlight / Metal Halide / sun lamps / spotlights etc. to meet the scene brightness Tempered glass countertops, 0.9m stainless steel stand feet. Plasma TV (42-inch) Sofa + tea table free drinking fountains(with warter), trash can free potted flower as you need green plants 2 3 3 0 0 1 1 2 set set set set set unit pot set 500 500 500 0 0 0 0 0 Subtotal : Materials
Stand area: 63 ㎡ (7 × 9)
Quantity Unit
Stand Height: 4.5 m
Price(RMB)
2
raw space management
collected by the show venue for each exhibitor
63
m2
Байду номын сангаас
30 Subtotal :
共计Total: 税金Tax: 共计含税Total tax: 共计含税最终优惠价Total amount: 6.0%
Notes: 1. In addition to the materials referred in detail above, the other materials shall be subject to the physical sample showed by Party B. 2. After signing the contract, if Party A needs extra materials out of this quotation, of which the cost shall be paid by Party A, and the add agreement shall be added to the contract. 3. The payment items and ways are detailed in the contract. 4. Quotation shall be signed by both responsible persons for comfirmation, then will be attached to the contract with the same date of s force and closing. 微信: