当前位置:文档之家› 福特汽车的生产制造

福特汽车的生产制造

G G
G
6-Sigma 23 Methodology
TBD
TBD
TBD
QOS 總表- 3/3
QOS Activity / Element R/Y/G Rating
24
25
26
VO e-QOS El ement
APQP
RY G
MC
RYG
PVT
RY G
Tim e & Data Mgm t.
G
G
G
Variability Reduction
G
VRT/VFG
Tool Verification
Incom ing Material
Process Control / Build & Inspection Pr oce s s
Repair System Quality Acceptance Cr ite r ia
G
G
G
G
G
27 Rec'g / Insp
Order to Delivery
Sales & Service Certification System
Suppliers
QUALITY LEADERSHIP INITIATIVE
Engage All Employees
Quality Plan Do Check Act
• 9 Leadership Principles
大多數的企 業能力
•沉醉過去的成就(不再挑戰)
障 •靠檢驗及檢修 礙 •依賴嘗試錯誤法(經驗)
•救火式的解決問題(頭痛醫頭) •缺乏數據 •部門間互相的推卸 •官大學問大
3 sigma 4 sigma
5 sigma
6 sigma
挑戰—超越障礙
那些動力可以躍越障礙?
障 礙
大多數的企 業能力
深信我們還有進步的機會 相信方法論 接受挑戰現況 導入新的技術,工具及手法 領導管理階層的態度—改變 實事求是的行為表現
福特汽车的生产制造
生產製造概論
品質系統 新車上市控制計畫 環境保護 Six Sigma 物料規劃與運籌 福特生產系統/工廠工程 & 維護 顧客滿意
品質系統
• Total Quality Excellence – Company Policy Letter No.1.
• Brief History of FLH Quality Management • Quality Arrow (Quality is Job#1) • QS-9000/ISO 14001 System / Quality
QOS 總表- 1/3
QOS Area / Element R/Y/G Ratings
VO QOS / QITD Area / Elements
1 Tim e & Data Mgm t.
Variability Reduction
2 VRT/VFG
3 Tool Verification
4 Incom ing Material
Sigma Level 與合格率的關係
Sigma Level
2 3 4 5 6
在1.5s 的長期偏移量下 每百萬不良數 合格率
308,537 66,807 6,210 233 3.4
69.15% 93.32% 99.38% 99.98% 99.99966%
挑戰—為什麼大多數的企業在
3~4 Sigma?
Body
RY G G G G
Y G
Y
G G
Paint
RYG G G G G
G G
Final
RY G G G G
G Y
Y
PDA / NOVA-C
RY G G G G
G G G
G G
QOS 總表- 2/3 QOS Area / Element R/Y/G Ratings
VO QOS / QITD Area / Elements
1. 企業競爭與觀念變革 2. 福特生產系統之概念 3. 精實製造基本觀念 4. FPS 系統介紹與展開 5. FPS小組活動 6. FPS小組活動推行績效 7. 結語
工廠工程 & 維護 大綱
FTPM定義 ECPL動力上鎖簡介 FTPM系統介紹 TEM (Total Equipment Management) FRACAS簡介 Q&A
19 Control Pt/Tip Level
20 Ultra Sonic
21 Air Leakage Test
Body
RY G
R
Joint Quality Com m ./Mgm t. Quality
22 Com m .
Paint
RYG
Final
RY G
R
PDA / NOVA-C
RY G G G G
Operating System • TGW Reduction / VRT / SAQ • TGR / Kano Model (to be covered by Knight in
detail)
3 Pillars of Ford Quality Is Job#1 Strategy
Drive Process
13 Squeak & Rattle
Water (20 m inute
14 soak) 15 M-10 Program 16 CBT (PDI or Final)
New QITD Area / Elements PIC (Product
17 Inform ation Center) 18 QVS Quick VIMS
Responsibility Model Line-Up Complexity Production Schedule and Release MP&L Exterior and Internal
Logistics Common Material Management
System
福特生產系統 內容大綱
• Reward and Recognition • Training and Feedback • Partnership with Unions, Dealers and
Is
Suppliers
Job #1
6-SIGMA
Data Driven Decision Making
• Define, Measure, Analyze, Improve, Control • Design for 6-Sigma • Common Problem Solving Language & Tools • High Quality, High Velocity Improvements in Business Results
顧客滿意
Customer is Job No.#1 TGW/TGR/CV-Sales/CV-Services Delighted Customers Consumer Driven Life Cycle Satisfaction Loyalty
Deliver Results
QUALITY OPERATING SYSTEM Performance to Standards
Ford Motor Company QOS
Future Customers
Product Creation
FPDS
Launch
Current
Customers
Current Model FPS
•Vehicle Quality
(High & Low Time-In-Service) •Customer Satisfaction •TGW •Warranty •Residual Value
•Sales & Service Satisfaction
•Elimination of Waste
Ford Lio Ho Quality Resolution Flow Diagram
RY G G
G Y
新車上市控制計劃 課程內容
1. 製造處 “前瞻工程部” 新車導入職掌介 紹現行車輛生產流程暨製程管制
2. 新車上市前生產可行性評估及成本分析 (feasibility study & cost analysis)
3. 新車上市之製造計劃 (Manufacturing Launch Plan)
3 sigma 4 sigma
5 sigma
6 sigma
我們的機會
利潤
利潤
獲利減少 *COPQ
利潤 COPQ
行政,製造, 或運輸 的成本
Байду номын сангаас
理論上的 成本
理論上的 成本
利潤
COPQ
理論上的 成本
哪一種比較有利??
*COPQ: Cost Of Poor Quality(劣質成本)
目標
Year
Projects from S.A.Q Green Belts Green Belt projects opened Green Belt projects closed Projects on hands per Black belt Black Belt projects opened Black Belt Projects closed Each Black Belt Projects closed
Process Control / Build & Inspection
5 Process 6 Repair System
Quality Acceptance
相关主题