钢结构厂房报价清单-最终版本

3ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量单 位单 价合 价小 计总 计Total withoutManagement Fees & Tax11,861,472.08I Ph as 11,666,236.031.1Pil e1,688,647.001.1.2Piling 8,823.00m179.00 1,579,317.00桩1.1.3Load testing 1.00lot30,000.00 30,000.00静载检测1.1.4Sonic testing 1.00lot15,000.00 15,000.00小应变检测1.1.5Connection rebar 7.00T7,500.00 52,500.00接桩钢筋1.1.6Grouting concrete 22.75m3520.00 11,830.00灌芯砼C351.2Fo un5,764,685.331.2.1Steel Sheet Pile 1.00lot180,000.00 180,000.00钢板桩围护1.2.2WellPoint dewatering 1.00lot30,000.00 30,000.00井点降水1.2.3Excavation 9,600.00m313.00 124,800.00挖土1.2.4Backfill 2,300.00m310.00 23,000.00回填土1.2.5Transport soil out of site 7,300.00 m3 78.00 569,400.00土方外运1.2.6 150mm C15 ConcreteCushion198.00 m3 490.00 97,020.00150厚C15混凝土垫层1.2.720mm leveling layer of WP20 cement mortar 1,439.00 m2 8.00 11,512.0020厚WS20水泥砂浆找平层1.2.8First layer of 3.0mm self-stick polymer modified 1,378.00 m2 95.00 130,910.00一道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.9Two layers of 3.0 self-stick polymer modified asphalt 92.00 m2 190.00 17,480.00二道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.1015mm WS20 Cement Mortar isolated layer 1,439.00 m2 8.00 11,512.0015厚WS20水泥砂浆隔离层1.2.1150mm C20 fine aggregate concrete74.00 m3 498.00 36,852.0050厚C20细石混凝土1.2.1215mm WS20 cement mortar isolated layer1,800.00m28.00 14,400.0015厚WS20水泥砂浆隔离层CIVIL WORK 土建工程DESCRIPTION 描 述3ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述1.2.13First layer of 3.0mm self-stick polymer modified 1,660.00 m2 95.00 157,700.00一道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.14Second layer of 3.0mm self-stick polymer modified 140.00 m2 190.00 26,600.00二道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层1.2.1520mm leveling layer of WP20 cement mortar 1,800.00 m2 8.00 14,400.0020厚WP20水泥砂浆找平层1.2.1650mm fine sand90.00 m3 230.00 20,700.0050厚细砂保护层1.2.17120mm M10 solid concrete brick wall 226.00 m3 728.00 164,528.00120厚M10混凝土实心砖保护墙1.2.18Pile caps bedding course 39.00 m3 490.00 19,110.00承台垫层砼1.2.19Formwork for bedding course 92.00 m2 81.50 7,498.00承台垫层模板1.2.20Steel bar for pile cap 29.60 t 5,120.00 151,552.00承台钢筋1.2.21Formwork for pile cap 276.00 m2 81.50 22,494.00承台模板1.2.22C30 concrete for pile cap 145.00 m3 510.00 73,950.00承台C30砼1.2.23Foundation beams bedding course 6.10 m3 490.00 2,989.00地梁垫层砼1.2.24Formwork for beam bedding 23.40 m2 81.50 1,907.10地梁垫层模板1.2.25Foundation beams steel bar 5.80 t 5,120.00 29,696.00地梁钢筋1.2.26Foundation beams formwork136.00 m2 81.50 11,084.00地梁模板1.2.27C30 Concrete of Foundation Beams21.30 m3 510.00 10,863.00地梁C30砼1.2.28C30 P6 Concrete of Equipments Passage 741.68 m3 512.00 379,740.16设备通道混凝土C30P61.2.29Formwork of Equipments Passage3,885.42 m2 81.50 316,661.73设备通道模板1.2.30Steel Reinforcement of Equipments Passage 110.84 T 5,120.00 567,500.80设备通道钢筋1.2.31Concrete Cushions of Pump house, Equipment 216.20 m3 490.00 105,938.00泵房,设备通道及设备基础垫层混凝土1.2.32Formwork of concrete cushion(Pump house, 85.37 m2 81.50 6,957.66泵房,设备通道及设备基础垫层模板1.2.33Concrete work of Equipment foundations(C30,P6) 936.83m3512.00 479,656.96设备基础混凝土C30P63ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述1.2.34Formwork of Equipment Foundations402.23 m2 81.50 32,781.75设备基础模板1.2.35Steel Rebar of Equipment Foundations98.94 T 5,120.00 506,572.80设备基础钢筋1.2.36Concrete of Pump House (C30,P6)517.90 m3 512.00 265,164.80泵房混凝土C30P61.2.37Formwork of Pump House 1,450.20 m2 81.50 118,190.97泵房模板1.2.38Steel Rebar of Pump House 161.30 T 5,120.00 825,856.00泵房钢筋1.2.39Concrete of Steel Pillars(C30,P6) 92.46 m3 512.00 47,339.52型钢柱混凝土C30O61.2.40Formwork of Steel Pillar Concrete431.50 m2 81.50 35,167.09型钢柱模板1.2.41Steel Rebar of Steel Pillar Concrete 22.50T5,120.00 115,200.00型钢柱钢筋1.3Grou1,003,577.001.3.1Soil Compaction2,769.00 m2 8.00 22,152.00素土压实1.3.2150mm detritus bedding course415.30 m3 260.00 107,978.00150mm 碎石垫层1.3.350mm medium sand bedding course 139.70m3230.00 32,131.0050mm 厚中砂垫层1.3.4300mm C30 Concrete 810.00 m3 510.00 413,100.00300厚C30砼随捣随光1.3.5Mono steel reinforcement net ∮14@20038.00t5,120.00 194,560.00单层钢筋网双向∮14@2001.3.6150mm C20 concrete 97.00 m3 498.00 48,306.00150厚C20砼随捣随光1.3.7Mono steel reinforcement net ∮8@2003.20t5,120.00 16,384.00单层钢筋网双向∮8@2001.3.8Formwork of Floor 156.00m281.50 12,714.00地坪模板1.3.9Floor block joint 600.00m8.00 4,800.00分仓缝1.3.10Hardener Floor surface 4,207.00m236.00 151,452.00BASF HardenFloor耐磨地面1.4Mai601,200.001.4.1Steel Rebar of floor plate 72.00t5,120.00 368,640.00楼承板钢筋3ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述1.4.2C30 concrete of floor plate 456.00m3510.00 232,560.00C30楼承板混凝土1.5Wall 1,402,634.901.5.1200mm autoclaved aeratedconcrete under ±0.0 42.80 m3 720.00 30,816.00±0.0以下200厚蒸压加气混凝土砌块1.5.260mm C20 fine aggregatedconcrete (φ4 bidirectional 298.00 m 80.00 23,840.0060厚C20细石混凝土(φ4双向@200防潮层1.5.3240mm outer concrete bricks58.40 m3 786.00 45,902.40240厚外墙混凝土砌块1.5.4200mm aerated concreted bricks736.00 m3 765.00 563,040.00200厚加气混凝土砌块1.5.5100mm aerated concrete bricks4.10 m3 765.00 3,136.50100厚加气混凝土砌块1.5.6300mm high concrete waterproof wall13.80 m3 510.00 7,038.00300高混凝土防水挡墙1.5.7Concrete surface adhesion agent 2,228.00 m2 8.00 17,824.00混凝土界面剂1.5.810mm WP15 cement mortar 12,757.00 m2 12.00 153,084.0010厚WP15水泥砂浆打底压实抹平1.5.92mm polyurethanewaterproof coat(non tar, two 242.00 m2 65.00 15,730.002厚聚氨酯防水涂料一层(非焦油型,分两道刷)1.5.1012mm WP5 composite mortar12,757.00 m2 12.00 153,084.0012厚WP5混合砂浆刮糙1.5.118mm WP10 composite mortar12,757.00 m2 20.00 255,140.008厚WP10混合砂浆粉面1.5.1260mm GRC-M plates 1.00 lot 65,000.00 65,000.0060厚GRC-M 板封砌1.5.13Fire proof treatment of Pillars 1.00lot69,000.00 69,000.00钢柱防火处理1.6D oo389,122.801.6.1Aluminum alloy door 1024 5.00 sets -铝合金门10241.6.2Aluminum alloy door 1524 5.00 sets -铝合金门15241.6.3Aluminum alloy door 1524 1.00 sets -铝合金门15241.6.4Solid Plywood door 1021 9.00 sets -实木夹板门10211.6.5Solid Plywood door 1521 6.00sets-实木夹板门15213ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述1.6.6Steel Roller Shutter Door 30306.00 sets 11,664.00 69,984.00钢质卷帘门30301.6.7Grade A fireproof Roller Shutter door 30307.00 sets 16,735.20 117,146.40甲级防火卷帘门30301.6.8Grade A fireproof door 15218.00 sets 6,988.80 55,910.40甲级防火门15211.6.9Grade A fireproof door 1821 1.00 sets 7,826.40 7,826.40甲级防火门18211.6.10Grade A fireproof door 10212.00 sets 3,912.00 7,824.00甲级防火门10211.6.11Grade A fireproof door 1221 1.00 sets 4,752.00 4,752.00甲级防火门12211.6.12Grade A fireproof door 2424 1.00 sets 8,389.20 8,389.20甲级防火门24241.6.13Grade B fireproof door 1021 7.00 sets 3,760.80 26,325.60乙级防火门10211.6.14Grade B fireproof door 1521 6.00 sets 6,127.20 36,763.20乙级防火门15211.6.15Grade C fireproof door 0823 1.00 sets 3,168.00 3,168.00丙级防火门08231.6.16Grade C fireproof door 1223 10.00 sets 4,293.60 42,936.00丙级防火门12231.6.17Grade C fireproof door 11212.00 sets 4,048.80 8,097.60丙级防火门11211.6.18Aluminum alloy rainproof louver 08121.00 sets -铝合金防雨百叶窗08121.6.19Aluminum alloy rainproof louver 16081.00 sets -铝合金防雨百叶窗16081.6.20Aluminum Alloy rainproof louver 15244.00 sets -铝合金防雨百叶窗15241.6.21Aluminum alloy glass window 1524 7.00 sets -铝合金玻璃窗15241.6.22Aluminum alloy glass window 3024 14.00 sets -铝合金玻璃窗30241.6.23Aluminum alloy glass window 5024 3.00sets-铝合金玻璃窗50241.7Roo 770,019.001.7.140mm foam glass, 140mmthermal insulation board 2,989.00 m2 55.00 164,395.00 40厚泡沫玻璃140保温板(燃烧性能A 级)1.7.2minimum 30mm LC5.0 lightaggregate concrete (2% 2,989.00m235.00 104,615.00最薄处30厚LC5.0轻集料混凝土2%找坡层3ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量 单 位 单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述1.7.3Longitudinal & horizontal joints (6m*6m)967.00 m 5.00 4,835.00纵横缝的间距6000x60001.7.420mm WS20 cement mortar leveling layer with proper 2,989.00 m2 13.00 38,857.0020厚WS20水泥砂浆找平层,找平层应留分格缝 ,缝1.7.54mm self-adhesive APP modified asphalt Coil 2,989.00 m2 120.00 358,680.004厚自粘性APP 改性沥青卷材1.7.6Non-woven fabrics 2,989.00 m2 18.00 53,802.00无纺布一层1.7.725mm WS20 Cement Mortar Protection layer 2,989.00m215.00 44,835.0025厚WS20水泥砂浆保护层1.8Othe46,350.001.6.1Aproll 36.00m230.00 8,280.00散水1.6.2Firewall Scaffolding 720.00m245.00 32,400.00防火墙脚手架1.6.3Ramp 27.00m2210.00 5,670.00坡道ⅡSubs 195,236.052.1Fo un39,978.502.1.1Excavation 76.00m313.00 988.00挖土2.1.2Backfill 12.00m310.00 120.00回填土2.1.3Transport soil out of site 64.00m378.00 4,992.00土方外运2.1.4Compact soil 64.00m28.00 512.00素土压实2.1.5Bedding course 6.80m3490.00 3,332.00C15垫层2.1.6Formworks 12.00m281.50 978.00垫层模板2.1.7Rebar for foundation 1.80t5,120.00 9,216.00基础钢筋2.1.8Formwork for foundation 87.00m281.50 7,090.50基础模板2.1.9C30 concrete for foundation 25.00m3510.00 12,750.00基础C30砼2.2Upp40,577.552.2.1C30 concrete column4.88m3510.00 2,488.803ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量单 位单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述C30砼柱2.2.2Reinforcement steel bar 0.80 t 5,120.00 4,096.00钢筋2.2.3Form works 8.50 m2 81.50 692.75模板2.2.4C30 concrete beam 7.90 m3 510.00 4,029.00C30砼梁2.2.5Reinforcement steel bar 1.80 t 5,120.00 9,216.00梁钢筋2.2.6Form works 78.00 m2 81.50 6,357.00梁模板2.2.7C30 concrete slab 8.60 m3 510.00 4,386.00C30砼板2.2.8Reinforcement steel bar 0.80 t 5,120.00 4,096.00钢筋2.2.9Formwork 64.00m281.50 5,216.00模板3.3Wall 66,354.803.3.1240mm autoclaved aeratedconcrete bricks under ±0.0 15.40 m3 720.00 11,088.00±0.0以下240厚蒸压加气混凝土砌块3.3.260mm C20 fine aggregatedconcrete (φ4 bidirectional 64.00 m 80.00 5,120.0060厚C20细石混凝土(φ4双向@200防潮层3.3.3240mm concrete block of outer walls56.40 m3 786.00 44,330.40240厚外墙混凝土砌块3.3.4240mm concrete block of inner walls 7.40m3786.00 5,816.40240厚内墙砌块3.4Fl oo13,781.203.4.1Soil Compaction 64.00 m2 8.00 512.00素土压实3.4.2150mm detritus bedding course9.40 m3 260.00 2,444.00碎石垫层150mm3.4.3150mm C20 concrete 9.40 m3 498.00 4,681.20150厚C20砼随捣随光3.4.4Rebar for floor 1.20t5,120.00 6,144.00地坪钢筋3.5Roo 16,464.003.5.140mm foam glass, 140mmthermal insulation board 64.00 m2 55.00 3,520.00 40厚泡沫玻璃140保温板(燃烧性能A级)3.5.2minimum 30mm LC5.0 lightaggregate concrete (2%64.00m235.00 2,240.003ALL COSTS AREIN RMBQUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL 数 量单 位单 价合 价小 计总 计CIVIL WORK 土建工程DESCRIPTION 描 述最薄处30厚LC5.0轻集料混凝土2%找坡层3.5.3Longitudinal & horizontaljoints (6m*6m)16.00 m 5.00 80.00纵横缝的间距6000x60003.5.420mm WS20 cement mortar leveling layer with proper 64.00 m2 13.00 832.0020厚WS20水泥砂浆找平层,找平层应留分格缝 ,缝宽53.5.54mm self-adhesive APP modified asphalt Coil 64.00 m2 120.00 7,680.004厚自粘性APP改性沥青卷材3.5.6Non-woven fabrics 64.00 m2 18.00 1,152.00无纺布一层3.5.725mm WS20 Cement Mortar Protection layer 64.00m215.00 960.0025厚WS20水泥砂浆保护层3.6Doo -3.6.1Aluminum Alloy GlassWindow 201612.80m2-铝合金玻璃窗20163.8Ot he18,080.003.8.1Scaffolding Support 160.00 m2 45.00 7,200.00脚手架支撑3.8.2Scaffolding of outer walls 64.00 m2 55.00 3,520.00外墙脚手架3.8.3Aproll 32.00m230.00 7,360.00散水Othe -Notes &。

相关主题