当前位置:文档之家› 通信工程施工合同范本精装版

通信工程施工合同范本精装版

通信工程施工合同范本精装版

Effectively restrain the parties’ actions and ensure that the legitimate rights and interests of the state, collectives and individuals are not harmed

( 合同范本 )

甲方:______________________

乙方:______________________

日期:_______年_____月_____日

编号:MZ-HT-053661

通信工程施工合同范本精装版

委托方(甲方):

承接方(乙方):

根据《中华人民共和国合同法》以及其他有关法律,法规的规定,结合室内装饰的特点,经甲,乙双方友好协商,甲方委托乙方承担室内装饰设计,并达成如下协议(包括本合同附件和所有补充合同),以便共同遵守。

一、甲方委托乙方按以下第种方案承担室内设计:

1.甲方委托乙方承担住宅室内设计,地址,房型,用途,使用面积平方米。设计收费按使用面积计算。

2.甲方委托乙方承担公共空间室内设计,地址,用途,建筑面积平方米。设计收费按建筑面积计算。

二、甲方委托乙方承担室内设计,设计收费标准为每平方米元,

收取设计费共计人民币元。

三、甲方应在签订合同之日首期付50%设计费,并与乙方约定上门测量的时间和地点。乙方在测量后天内完成初步设计方案,包括平面布置图,顶面布置图及局部效果图各一张。

四、甲方与乙方经过沟通对乙方完成的初步设计方案达成一致后,填写方案进程表(见附件),并由双方签字确认。甲方应支付设计费余款,乙方应在年月日至年月日共天内完成全套装潢设计图及施工图纸。

五、甲方所付的设计费不包含变动建筑主体等的结构设计。甲方如需变动建筑主体,增加房屋负荷,必须由原设计单位或具有相应资质等级的设计单位出具施工图,并报请物业及相关部门书面同意后,方可进行室内装饰设计。

六、全套图纸完成后,甲方如有更改意见,再与乙方沟通。乙方根据协商方案,绘制更改图纸,再次填写方案进程表,由双方签字确认。甲方如要求乙方修改图纸,图纸完工时间顺延或由双方另行约定。

场地平整施工合同(标准版)模板

The obligee in the contract can accomplish the goal in a certain period by discussing the agreed rights and responsibilities. 甲方:___________________ 乙方:___________________ 时间:___________________ 场地平整施工合同(标准版)

编号:FS-DY-62657 场地平整施工合同(标准版) 发包方:(甲方) 承包方:(乙方) 按照《中华人民共和国合同法》,本着平等互利,遵照公平、公正、诚信的原则,经甲乙双方协商签订本合同。 一、工程概况: 1、工程名称:_____ 2、工程地点:_____ 3、工程造价:平整土地____亩、单价____元/亩,合同金额:____元 4、开完工日期:_____年____月____日至_____年____月____日 二、权利和义务 (一)甲方的权利和义务 1、向乙方提供施工技术文件,作为协调工作。

2、监督乙方进行测量放线 3、甲方有权力对工程建设中的工程质量,随时监督和检查。 (二)乙方的权利和义务 1、严格按照甲方的设计及要求进行施工,自觉接受甲方的监督,确保工程质量,争创优良的工程。因工程质量不符合要求所造成的损失,均有乙方负责。 2、做到文明施工、安全施工,对施工现场进行严格管理,严禁违章作业,施工过程中所发生的一切不安全事故均由乙方负责,甲方不承担任何责任。 三、工程质量验收 1、工程竣工后由甲方组织验收。 2、严格按照设计及施工要求进行验收,要求达到地面平整、符合要求。 四、结算方式: 在乙方机械到现场进行施工后____天,支付乙方____的燃油费。工程竣工后,由甲方组织人员进行验收,验收合格后,甲方一次性支付乙方____工程款,____个月后,如果未

工程施工借款的合同范本正式版

YOUR LOGO 工程施工借款的合同范本正式版 After The Contract Is Signed, There Will Be Legal Reliance And Binding On All Parties. And During The Period Of Cooperation, There Are Laws To Follow And Evidence To Find 专业合同范本系列,下载即可用

工程施工借款的合同范本正式版 使用说明:当事人在信任或者不信任的状态下,使用合同文本签订完毕,就有了法律依靠,对当事人多方皆有约束力。且在履行合作期间,有法可依,有据可寻,材料内容可根据实际情况作相应修改,请在使用时认真阅读。 贷款方:_________借款方:_________ 根据国家规定,借款方为进行基本建设所需贷款,经贷款方审查发放。为明确双方责任,恪守信用,特签订本合同,共同遵守。 第一条借款用途_______________________。 第二条借款金额借款方向贷款方借款人民币(大写)_____元。预计用款为___年___元;___年___元;___年___元;___年___元;___年___元;___年___元。 第三条借款利率自支用贷款之日起,按实际支用数计算利息,并计算复利。在合同规定的借款期内,年息为__%。借款方如果不按期归还贷款,逾期部分加收利率2%。 第四条借款期限借款方保证从___年___月起至___年___月止,用国家规定的还款资金偿还全部贷款。预定为___年___元;___年___元;___年___元;___年___元;___年___元;___年___元,贷款逾期不还的部分,贷款方有权追回贷款,或者商请借款单位的其他开户银行代为扣款清偿。 第五条因国家调整计划、产品价格、税率,以及修正概算等原因,需要变更合同条款时,由双方签订变更合同的文件,作为本合同的组成部分。

施工合同通用条款(合同示范文本)

施工合同通用条款(合同示范 文本) Contracts concluded in accordance with the law have legal effect and regulate the behavior of the parties to the contract ( 合同范本 ) 甲方:______________________ 乙方:______________________ 日期:_______年_____月_____日 编号:MZ-HT-004297

施工合同通用条款(合同示范文本) 一、词语定义及合同文件 1、词语定义下列词语除专用条款另有约定外,应具有本条所赋予的定义: 1.1通用条款:是根据法律、行政法规规定及建设工程施工的需要订立,通用于建设工程施工的条款。 1.2 专用条款:是发包人与承包人根据法律、行政法规规定,结合具体工程实际,经协商达成一致意见的条款,是对通用条款的具体化、补充或修改。 1.3发包人:指在协议书中约定,具有工程发包主体资格和支付工程价款能力的当事人以及取得该当事人资格的合法继承人。 1.4 承包人:指在协议书中约定,被发包人接受的具有工程施工承包主体资格的当事人以及取得该当事人资格的合法继承人。 1.5 项目经理:指承包人在专用条款中指定的负责施工管理和

合同履行的代表。 1.6设计单位:指发包人委托的负责本工程设计并取得相应工程设计资质等级证书的单位。 1.7监理单位:指发包人委托的负责本工程监理并取得相应工程监理资质等级证书的单位。 1.8工程师:指本工程监理单位委派的总监理工程师或发包人指定的履行本合同的代表,其具体身份和职权由发包人承包人在专用条款中约定。 1.9工程造价管理部门:指国务院有关部门、县级以上人民政府建设行政主管部门或其委托的工程造价管理机构。 1.10工程:指发包人承包人在协议书中约定的承包范围内的工程。 1.11合同价款:指发包人承包人在协议书中约定,发包人用以支付承包人按照合同约定完成承包范围内全部工程并承担质量保修责任的款项。 1.12追加合同价款:指在合同履行中发生需要增加合同价款的

三方分包施工合同模板

(项目名称+工程名称)工程施工合同 甲方: 乙方: 丙方: 为明确施工过程中的权利义务,依照《中华人民共和国合同法》《建设安装工程承包合同条例》及相关法律法规规定,结合本工程具体情况,三方签订本合同。 第一条工程概况 项目名称: — 工程名称: 工程地点: 承包范围: 承包方式: 第二条组成合同的文件及解释顺序包括: 三方签订的协议书; 中标通知书; 投标书及其附件; ^ 本合同条款; 标准、规范及有关技术文件; 图纸; 工程量清单或工程预算书; 其他三方有本工程的洽商、变更等书面协议式文件。 第三条合同工期 开工日期:年月日 竣工日期:年月日 `

日历工期:日 如遇下列情况,工期作相应顺延,并用签证形式确定顺延期限: 甲方未能按时准备好前期开工条件; 在施工过程中,如遇甲方要求丙方停工的; 因遇不可抗因素而影响工程进度。 第四条合同价款及调整 本合同工程预算总造价为人民币大写(¥)。 本合同价款采用(固定总价或固定单价或可调价格)的形式:(选其一)% 固定总价。 固定总价约定的工程范围包括: 固定总价约定的风险范围包括: 固定单价。 固定单价约定的风险范围包括: 固定单价约定的风险费用计算方法: 在约定的风险范围内综合单价不再调整。风险范围以外的综合单价调整方法双方约定: 可调价格(包括可调综合单价和措施费)。约定调整因素包括:— 法律、行政法规和国家有关政策变化影响合同价款; 工程造价管理部门公布的价格调整; 设计变更; 一周内非乙方原因停水、停电、停气造成停工累计超过8小时; 双方约定的其他因素。 第五条工程款支付方式 预付款:本合同签订之日起个工作日内,甲方向丙方支付该合同总价款的%,即人民币(¥);提取合同总价款的%,即人民币(¥),作为合同履约保证金,则本次实际应支付合同总价款的%,即人民币(¥)。

场地平整施工合同范本文档

2020 场地平整施工合同范本文档CONTRACT TEMPLATE

场地平整施工合同范本文档 前言语料:温馨提醒,合同是市场经济中广泛进行的法律行为,人议,以及劳动合同等,这些合同由其他法律包括婚烟、收养、监护等有关身份关系的协进行规范,不属于我国合同法中规范的合同在市场经济中,财产的流转主要依靠合同。 本文内容如下:【下载该文档后使用Word打开】 场地平整施工合同范本1 甲方:(发包方) 乙方:(承包方) 现甲方有场地平整工程项目一处,自愿承包给乙方完成全部的施工运作,根据《中华人民共和国合同法》和相关法律法规等规定,为明确双方在工程承包中的权利、义务和责任,确保工程任务的全面完成,自愿、平等、互利的原则下,经甲乙双方协商同意签订本合同。 (一)工程地点:遵义市民健身中心 (二)工程范围:土石方开挖清运及场地平整(包括回填种植土及最后的清场);共计有1300平方米,平均开挖深度30CM,平均回填深度40CM。 (三)工程造价:经双方确定协议总价价为总价包干原则、如在施工过程中有需要增加或减少的,经甲乙双方议定可在总价上增减,结账要用油票) (四)工程质量:

乙方施工时需按照甲方认可的方案或者标高进行场地推土平整,经甲方验收合格认可为准。 (五)付款方式 待甲方验收合格后15个工作日给予支付。 (六)双方责任 (1)在施工中甲方应做好相应的协调工作。 (2)甲方有义务监督乙方的工程进度及工程质量。 (3)若在施工途中出现与甲方相关的问题,甲方应尽快解决办理。 (4)本合同签定后,乙方应保证进度,保证质量的完成工程项目,若因工程质量问题出现的返工,二次施工一切费用及损失由乙方自行承担,甲方概不承担任何费用。 (5)此工程包干价甲乙双方已定,乙方无权向甲方提出加价或提价。 (6)在以后的施工中,乙方无论是盈利或亏损,均由乙方自行承担,甲方概不负责。 (7)在施工中,若发生工程事故(如死、伤、残)乙方自行负责,甲方概不负责。 (8)若在施工途中出现非甲方原因导致的工程停工,乙方无权向甲方提出任何经济赔偿或停工补偿。 1、乙方不按时完成工程项目 2、乙方工程质量不符合规定 3、乙方不服从甲方现场管理人员的指挥管理

最新建设工程借款合同范本(标准版).docx

编号:_____________最新建设工程借款合同范本 甲方:________________________________________________ 乙方:________________________________________________ 签订日期:_______年______月______日

贷款方: 联系方式: 借款方: 联系方式: 根据国家规定,借款方为进行基本建设所需贷款,经贷款方审查发放。为明确双方责任,恪守信用,特签订本合同,共同遵守。 第一条借款用途: 第二条借款金额 借款方向贷款方借款人民币(大写)______元。 借款数额肯定要写的,大家也都会写,只是要注意数额应该用大写,并标上币种。在大写的旁边再附注小写,并写上小数点。这样做主要是防止数额被更改。写清楚了,如果你是借款人,你不用担心数额被修改。如果你是出借人,不用担心借款人说数额被你改过。 第三条借款利率 自支用贷款之日起,按实际支用数计算利息,并计算复利。在合同规定的借款期内,年息为______%。借款方如果不按期归还贷款,逾期部分加收利率______%。

利息可以由双方自行约定,但如最终引发纠纷,对于未支付的部分利息,只要未超过年利率24%,人民法院会给予保护;约定的利率超过年利率36%,超过部分的利息约定无效。但如果约定的年利率为24%--36%,借款人已经支付的部分利息,出借人可不予返还。 第四条借款期限 借款方保证从________年____月起至________年____月止,用国家规定的还款资金偿还全部贷款。贷款逾期不还的部分,贷款方有权限期追回贷款,或者商请借款单位的其它开户银行代为扣款清偿。 借款时间是认定借款期限和诉讼时效的重要依据,也是认定借条事实的重要因素,应该在写明________年____月____日。年份不能省略,如果没写年份,一旦发生纠纷,难以确定具体的时间。如果你是借款人,为防止借款日期被修改,应当用汉字大写:如:二〇一二年三月十六日。 第五条因国家调整计划、产品价格、税率,以及修正概算等原因,需要变更合同条款时,由双方签订变更合同的文件,作为本合同的组成部分。 第六条违约责任 贷款方保证按照本合同的规定供应资金。因贷款方责任未按期提供贷款,应按违约数额和延期天数,付给借款方违约金。违约金的计算与银行规定的加收借款方的罚息计算相同。 除违约金的约定外,为了保障款项的回收,还可以就借款设置抵押。

建筑工程合同通用条款(完成版)

通用条款 1.定义 1.1在合同中下列词语,除上下文另有说明外,具有本款所赋予的含义: (1)发包人:协议书中指明的将工程项目委托给承包人完成的当事人。 (2)承包人:协议书中指明的接受发包人委托并完成工程项目的当事人。 (3)协议书:发包人与承包人结合工程实际,经协商一致后,对通用条款所做的具体化、补充或修改。 (4)规范:与合同履行相关的政府强制性标准、规范,以及发包人和承包人在合同中约定适用的其它标准、规范和技术规程。 (5)图纸:按照协议书的约定,发包人负责设计时向承包人提供的施工图纸、设计变更、计算书和类似性质的技术资料,以及由承包人负责设计时向发包人提供的所有图纸、设计说明、计算书、操作和维修手册以及类似性质的其它技术资料。 (6)工程师:由发包人指定并根据其授权履行合同管理职责的人员。 (7)工程:发包人与承包人在协议书中约定的,发包人委托承包人完成的全部施工内容之总称。 (8)区段:发包人与承包人在协议书中约定节点工期或约定先行验收、移交的工程任何特定部分。 (9)验收:对承包人履行合同义务的全部或部分结果进行评价,以判定承包人履行合同义务是否符合合同约定标准。 (10)竣工:承包人履行完毕合同约定全部义务(质量保修义务除外)并经验收合格。 (11)完工:承包人完成协议书特别约定的任何区段的施工并经验收合格。 (12)开工日期:发包人与承包人在协议书中约定的,承包人开始履行合同义务的绝对或相对日期,协议书中约定由工程师签发开工令确定开工时间的,则为工程师签发开工令上指定的日期。 (13)竣工日期:发包人与承包人在协议书中约定的,承包人应将工程竣工的绝对或相对日期。 (14)完工日期:发包人与承包人在协议书中约定的,承包人应将协议书特别约定的区段完工的绝对或相对日期。

三方建筑工程分包施工合同样本

编号:_____________ 三方建筑工程分包施工 合同 甲方:___________________________ 乙方:___________________________ 丙方:___________________________ 签订日期:_______年______月______日

甲方: 乙方: 丙方: 为明确施工过程中的权利义务,依照《中华人民共和国合同法》《建设安装工程承包合同条例》及相关法律法规规定,结合本工程具体情况,三方签订本合同。第一条工程概况 1.1 项目名称: 1.2 工程名称: 1.3 工程地点: 1.4 承包范围: 1.5 承包方式: 第二条组成合同的文件及解释顺序包括: 2.1 三方签订的协议书; 2.2 中标通知书; 2.3 投标书及其附件; 2.4 本合同条款; 2.5 标准、规范及有关技术文件; 2.6 图纸; 2.7 工程量清单或工程预算书; 2.8 其他三方有本工程的洽商、变更等书面协议式文件。 第三条合同工期 3.1 开工日期:年月日

3.2 竣工日期:年月日 3.3 日历工期:日 3.4 如遇下列情况,工期作相应顺延,并用签证形式确定顺延期限: 3.4.1 甲方未能按时准备好前期开工条件; 3.4.2 在施工过程中,如遇甲方要求丙方停工的; 3.4.3 因遇不可抗因素而影响工程进度。 第四条合同价款及调整 4.1 本合同工程预算总造价为人民币大写(¥)。 4.2 本合同价款采用(固定总价或固定单价或可调价格)的形式:(选其一)4.2.1 固定总价。 4.2.1.1 固定总价约定的工程范围包括: 4.2.1.2 固定总价约定的风险范围包括: 4.2.2 固定单价。 4.2.2.1 固定单价约定的风险范围包括: 4.2.2.2 固定单价约定的风险费用计算方法: 4.2.2.3 在约定的风险范围内综合单价不再调整。风险范围以外的综合单价调整方法双方约定: 4.2.3 可调价格(包括可调综合单价和措施费)。约定调整因素包括: 4.2.3.1 法律、行政法规和国家有关政策变化影响合同价款; 4.2.3.2 工程造价管理部门公布的价格调整; 4.2.3.3 设计变更; 4.2.3.4 一周内非乙方原因停水、停电、停气造成停工累计超过8小时;

场地平整施工合同书范本

编号:_______________本资料为word版本,可以直接编辑和打印,感谢您的下载 场地平整施工合同书范本 甲方:___________________ 乙方:___________________ 日期:___________________

平整场地前应先做好各项准备工作,如清除场 地内所有地上、地下障碍物;排除地面积水;铺筑临时道路等。场地平整施工合同书怎么写呢?以下是在小编为大家整理的场地平整施工合同书范文,感谢您的欣赏。 场地平整施工合同书范文篇一 甲方: 乙方: 依据〈〈中华人民共和国合同法》及〈〈建筑安装工程承包合同条例》,为了做好鸣羊路(拆迁房)项目建设工作,经甲乙双方协商同意,建设项目场地拆除地上附着物和平整场地工程,签订本合同。 一、项目名称: 二、项目地点: 三、施工内容:拆除工程用地的地上附着物、平整场地达到工程 施工的要求等。 四、工程总价:本工程为包干价(材料、机械设备及运输费用)均乙方负责。合计人民币元整(元)。 五、承包方式:甲方将该工程承包给乙方,由乙方负责组织施工, 包括地上附着物拆除,清理和场地平整等。乙方应做好安全生产,严禁违章作业,施工过程中发生安全事故由乙方负责,甲方不承担任何责任。 六,施工期限:白本合同签订之日起天内完成该工程。超元,天气下雨不计工期。

七、结算方式:本工程平整场地工程全部完成后,由甲方同乙方进行现场验收,验收合格后,甲方再支付万的工程款,余款工程的 第一次工程款到后付清。 八,本合同未尽事宜,由双方共同协商解决,如产生补偿协议将本合同具有同等法律效力。 九、本合同一式二份,甲乙各执一份。白签订之日生效。 甲方: 法定代表人: 年月曰 乙方 乙方代表: 年月曰 场地平整施工合同书范文篇二 发包方:(以下简称甲方)承包方:(以下简称乙方) 依据〈〈中华人民共和国合同法》和相关法律法规,结合本工程实际情况,甲、乙双方就二期工程用地土方平整施工承包事宜,双方本着平等、白愿、互惠互利的原则,经友好协商签订如下协定,共同遵 —、工程概况 工程地点:市孝感乡北路,麻城商贸物流城;工程范围:二期工程用地,按市规划红线图150亩范围以内;工程内容:本工程用地平整,主要是高挖低填,余土白由外运到白选地点。本用地平整土方开挖最高点82.4

工程施工借款合同(示范合同)

Restrict the performance of the responsibilities of both parties to the contract, the termination of cooperation, and clear regulations on related businesses. (合同范本) 甲方:___________________ 乙方:___________________ 日期:___________________ 工程施工借款合同(示范合同)

工程施工借款合同(示范合同)说明:本合同书适用于合同双方同意签署协议后,约束合同双方的履行责任,合作终止以及相关业务明确规定,如果需要,可以直接下载打印或用于电子存档。 合同编号:____ 贷款方:_________借款方:_________ 根据国家规定,借款方为进行基本建设所需贷款,经贷款方审查发放。为明确双方责任,恪守信用,特签订本合同,共同遵守。 第一条借款用途 ____________________________________________________________ _________________________________。 第二条借款金额借款方向贷款方借款人民币(大写)_____元。预计用款为________年___元;________年___元;________年___ 元;________年___元;________年___元;________年___元。 第三条借款利率自支用贷款之日起,按实际支用数计算利息,并计算复利。在合同规定的借款期内,年息为__%。借款方如果不按期归还贷款,逾期部分加收利率20%。 第四条借款期限借款方保证从________年____月起至________年

施工类合同通用条款范本

目录 1.定义2? 2.合同文件及解释顺序3? 3.合同的变更与解除4? 4.合同转让与分包5? 5.工程师的权力..............................................................................................................66.批准不免除责任 (7) 7.承包人负责设计········································································································8 8.承包范围 (8) 9.质量标准··························································································································910.材料及设备供应·········································································································911.检验、测试11? 12.验收与移交?11 13.质量保修·····················································································································14 14.开工、工期与节点工期1?6 15.不可抗力18? 16.合同价························································································································2017.付款条件与方法21? 18.工程照管与成品保护 (23) 19.安全文明施工 (23) 20.风险承担···············································································································2421.知识产权24? 22.保密?24 23.通知25? 24.发包人与承包人其它基本义务 (25) 25.违约责任··················································································································27 26.履约保证金或履约银行保函30? 27.争议的解决31?

建筑工程施工三方协议书范本

建设方:________________________ 总包方:________________________ 分包方:________________________ 为明确施工过程中建设方、总包方及分包方三方的责任,依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、法规、遵循平等、自愿、公平和诚实信用的原则,建设、总包、分包三方就各自的权利义务,经协商一致,订立本协议。 一、总包服务费:本工程桩基工程的总包服务费由建设方支付。 二、承包范围:无锡交通世茂项目 B 地块一期桩基础工程。 三、工程造价及工程款支付:人民币_____元整,由建设方支付。本工程不设预付款。保留金的 5%,待保修期满后 14 个日历天内支付。 四、建设方责任 1. 负责现场的协调和管理,处理总包方、分包方之间的相关事宜。 2. 负责及时向分包方支付工程进度款及尾款。 五、总包方的工作 1. 负责对分包单位进场后的现场安全文明施工管理(不含质量、技术、进度) 、服务、配合、协调、对已完验收合格的工程负责保管。 2. 负责现场临时水电的统一管理。 3. 在不妨碍承包人优先使用的前提下,合理安排分包人使用总包现场内的施工机械、脚手架等设备。 4. 总包方负责该分包资料的保管和交档案馆的归档工作。 六、分包方的工作 1. 负责组织与建设方进行施工设计图的会审及技术交底、方案的报批与确认,处理解决相关的技术问题。 2. 对工程进度、质量、安全、环保文明施工等承担全部责任。 3. 遵守总包方施工现场各项管理制度,服从总包方的管理,做好分包范围内的现场文明施工,卫生清理工作。

4. 及时向建设方、总包方提供工程进度计划及工程进度报表并对报表的正确性、完整性负主要责任。 5. 自行组织和配合与监理的预检、隐检、材料检验、试验等达到工程合格标准所要求的一切工作,提供满足专项验收要求的所有技术资料。 6. 严格按照施工图纸、技术规范、操作规程、工艺流程进行施工,确保工程质量。 7. 负责自行施工范围内的建筑垃圾的清理,并负责运至发包单位的制定消纳地点。 8. 负责对已完工程的成品保护工作,按照国家的相关规定对工程质量负责。 9. 按照规范及无锡市档案馆要求及时填报桩基工程的各种相关技术资料,并将填报的各种资料(包括竣工所需要的资料)及时、完整的提供给总包,并对资料的正确性、完整性、真实性、可靠性负责。 七、工程质量 1. 分包单位就该项分包的工程质量向建设方承担直接责任。 2. 任何由于分包方的材料使用不当或材料不合格、或施工工艺、方法不符合要求、施工程序不当造成的质量问题、工程隐患,分包方应承担全部责任。 八、违约责任 1. 分包单位不配合总包管理,不服从总包方现场的领导造成的后果自行承担。 2. 造成总包单位现场设施:临时道路、场地、水电管线的损坏,分包方应按照损坏的实际损失如数进行赔偿。 3. 提供总包单位的技术资料字迹模糊不清、数量不够,总包方有权退回或拒绝收集。分包方确保桩基工程的验收合格。 九、其他 本协议一式六份,正副本各三份,建设、总包、分包方各执两份,每份具有同等法律效力,自三方签字盖章之日起生效。

场地平整工程施工合同协议书

甲方: 乙方: 依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方就花城湖停车场扩改建项目场地平整工程施工事宜协商一致,订立本协议,以共同遵守。 一、工程概况 1.1工程地点: 1.2工程内容: 停车场场地平整、停车场边线、分界线及主要停车线和交通标志的设置。 二、工程造价及工程付款方式: 2.1场地平整: 装载机:元/小时 挖掘机:元/小时 翻斗车:元/小时 平地机:元/小时 压路机:元/小时 2.2停车线和交通标志的设置: 设施设备由甲方采购,乙方负责安装施工。 人工工资:元/天 技工:元/天 普工:元/天 2.3工程付款方式: 工程预算总造价包括平整场地相关的工、料、机,管理费、利润、保险及地方税金费用。工程结

算时单价不变,以实际工程量为准 本协议签订,现场具备施工工作面后,乙方进场施工,甲方即支付万元给乙方作为预付款,之后每次结算按已经完成实际工作量的%支付,全部工程完工验收合格天内甲方一次性付清余款。 三、施工日期: 年月日开工至封冻,春节后复工,至 年月日之前完成。 四、技术质量要求 按设计图纸和现场甲方经理意见进行施工。 五、甲方责任 5.1负责与有关部门沟通好本项目的方案。 5.2负责组织工程量现场确认工作。 5.3货物的使用与保管在验收合格移交甲方后由甲方自行负责,但甲乙双方应做好相应的移交书面手续。 5.4负责按时支付工程款。(如未能按时付款,在宽限期内经催促仍未付款的,乙方有权拆除并回收所提供产品,不予退还预付款,且因此给乙方造成的其它经济损失由甲方负责赔偿。) 六、乙方责任 6.1乙方对甲方负责,按时保质保量完成本项目。 6.2本协议中,项目施工的安全防范所需的施工安全设施由乙方自行负责并对整个工程的施工安全负责。 6.3乙方应在本协议约定时间内完成所有施工,否则每延期一天应支付甲方已付工程款 的违约金。

工程项目代建借款合同范本标准版本

文件编号:RHD-QB-K7521 (合同范本系列) 甲方:XXXXXX 乙方:XXXXXX 签订日期:XXXXXX 工程项目代建借款合同范本标准版本

工程项目代建借款合同范本标准版 本 操作指导:该合同文件为经过平等协商和在真实、充分表达各自意愿的基础上,本着诚实守信、互惠互利的原则,根据有关法律法规的规定,达成如下条款,并由双方共同恪守。,其中条款可根据自己现实基础上调整,请仔细浏览后进行编辑与保存。 工程项目代建借款合同范本1 项目名称:__________ 项目委托人:_______________ 项目代建人:_______________ 项目使用人:_______________ 根据《中华人民共和国合同法》、《北京市政府投资建设项目代建制管理办法(试行)》,为保证市政府投资建设代建项目的顺利实施,充分发挥政府投资效益,严格控制投资概算,经委托人、代建人与使用人三方协商同意,签订本合同。

一、项目概况 项目名称:___________ 项目总投资:_________(万元)(以批准的投资概算为准) 建设地点:___________ 建设规模:___________ 建设内容:___________ 二、代建项目管理范围和内容:___________ 三、代建项目管理目标 投资控制金额:___________(万元)(以代建人投标报价为准) 工程质量标准:___________ 代建管理期限:___________个日历天 四、代建管理费 金额(大写):___________元人民币

¥:___________元 五、本合同由以下文件组成 1.三方认可的有关工程的变更、洽商等书面文件或协议修正文件 2.委托代建合同书 3.专用合同条款 4.通用合同条款 5.中标通知书 6.投标书及其附件 7.招标文件及其附件(或描述代建项目的技术性文件) 8.初步设计文件及其审查批复文件 9.标准、规范及有关技术文件 构成本合同的文件若存在歧义或不一致时,则按上述排列次序进行解释。

建筑工程施工合同范本(通用条款)

建筑工程施工合同范本 (通用条款) -CAL-FENGHAI-(2020YEAR-YICAI)_JINGBIAN

建筑工程施工合同范本(通用条款) 发布者:社区管理员阅读:1779 建设工程施工合同 建设工程施工合同条件 一、词语涵义及合同文件 第1条词语涵义。建设工程施工合同文本,由建设工程施工合同条件(以下 简称合同条件)和建设工程施工合同协议条款(以下简称协议条款)组成。其用词 用语除协议条款另有约定外,应具有本条所赋予的涵义: 1.发包方(简称甲方):协议条款约定的、具有发包主体资格和支付工程价 款能力的当事人。 2.甲方驻工地代表(简称甲方代表):甲方在协议条款中指定的代表人。 3.承包方(简称乙方):协议条款约定的、具有承包主体资格并被发包方接 受的当事人。 4.乙方驻工地代表(简称乙方代表):乙方在协议条款中指定的代表人。 5.社会监理:甲方委托具备法定资格的工程监理单位或人

员对工程进行的监 理。 6.总监理工程师:工程监理单位委派的监理总负责人。7.设计单位:甲方委托的具备相应资质等级的设计单位。8.工程造价管理部门:国务院各有关部门、各级建设行政主管部门或其授权 的工程造价管理部门。 9.工程质量监督部门:国务院各有关部门、各级建设行政主管部门或其授权 的工程质量监督机构。 10.工程:协议条款约定具体内容的永久工程。 11.合同价款:按有关规定或协议条款约定的各种取费标准计算的,用以支 付乙方按照合同要求完成工程内容的价款总额。 12.经济支出:在施工中已经发生,经甲方确认后以增加预算形式支付的合 同价款。 13.费用:甲方在合同价款之外,需要直接支付的开支和乙方应负担的开支 。 14.工期:协议条款约定的合同工期。 15.开工日期:协议条款约定的工程开工日期。 16.竣工日期:协议条款约定的工程竣工日期。

建筑工程分包合同范本

建筑工程施工分包合同 合同编号: 发包方(甲方):市第筑 承包方(乙方): 根据《中华人民国合同法》、《中华人民国建筑法》、《市建筑市场管理条例》及有关法律、法规,遵循平等、自愿、公平和诚实信用的原则,结合本工程实际,为明确双方的责任、权利和义务,经甲、乙双方协商一致,订立本合同。 第一条工程概况 1.1工程名称:。 1.2工程地点:。 1.3承包围及容:。 1.4甲方视需要,可对乙方承包围及容作出增减或调整,也可对乙方承包围的某一分项、某一产品、半成品材料等另行指定施工单位或供应商。乙方应无条件接受,也不因此作为对其余项目合同单价和总价作出调整的理由。 1.5承包方式:本工程采用“包工料机消耗、包工期、包质量、包安全、包文明施工、包环境保护、包甲方与业主的总承包合同中所涉及到的本分包合同容、包甲方对业主的承诺和业主对甲方所作的规定、约束等”的包干方式,全面负责本合同围的全部工作容,处理好政府主管部门和社区地方关系。 第二条合同工期 2.1 乙方接甲方进场通知后日做好施工现场准备工作。 2.2 合同工期:本工程于年月日开工, 至年月日竣工,共个日历天。 2.3 工期延误时,乙方须向甲方支付违约金,违约金为每延误一天,按本工程总价的计算,按天累计。 2.4如遇有下列情况之一,经甲方同意并报业主书面签字盖章认可后,可考虑工期延长: a.因不可抗力影响;(不可抗力的定义和围按总承包合同) b.重大的设计变更、修改而增加的工作量,使乙方工程进度 无法按原计划进行; c.非乙方原因的停电、停水造成停工时间连续12小时以上; d.因业主原因的工期调整; e.因业主原因无常施工。 第三条质量 3.1 本工程质量等级为。 3.2质量达不到要求时,乙方须向甲方支付违约金,违约金

场地平整施工合同范本

场地平整施工合同 发包方:(以下简称甲方) 承包方:(以下简称乙方)甲、乙双方根据《中华人民共和国合同法》、《中华人民共和国建筑法》及其他法律、法规,遵循平等、自愿、公平和诚实信用的原则,甲乙双方就本场平工程施工事项协商一致,订立本合同。 一、工程概况 1、工程名称: 2、工程地点: 3、工程范围及内容:用地范围内的土、石方挖、填、运输(场内转运)、碾压、爆破。附金堂测量队提供的用地红线图,由于该项目立项时使用的是我公司温江基地公司名称,图标中的工程名称为“”,实指该合同用地范围。 4、施工材料、燃油、机械及施工人员等均由乙方自理,并对其现场的安全负全责。 二、工程量核算与确认 1、场平设计标高: a、靠节能大道部分标高定为绝对高程447.50米(绝对高程是以金堂测量队提供数据为准,以下相同),面积为14402.6平方米,以下简称第一部分。 b、靠环保大道部分标高定为绝对高程448.8米,面积为57654.4平方米,以下简称第二部分。 2、工程量分别为: a、第一部分:场内挖方20792.7立方米(以下简称方)、场内填方38243.5方、边坡挖方2354.4方、边坡填方5148.9方。 b、第二部分:场内挖方183370.1方、场内填方146304.9方、边坡挖方14739.1方、边坡填方24021.7方。 两个部分总挖方为221256.3方,总填方为213719.0方。

以上工程量均由提供,联系电话。如乙方对上述工程量有异议应在合同签订前提出,合同签订后视为乙方认同上述工程量。合同签订后除场平设计标高发生改变,否则工程量均不调整。 三、工程工期 开工时间暂订为2012年11月28日,实际以甲方开工令为准。 工期为60天(自然天),如遇农历新年或大雨、大风等不可抗拒自然灾害,乙方应以书面的方式向甲方提出申请,工期可以顺延。否则迟一天按合同总价的 %处罚,提前一天按合同总价的 %奖励。 四、工程造价计算及付款方式 1、综合包干单价:元/立方米。 2、合同总价为:大写:。 3、付款时间为工程完工并通过甲方验收后三日内通过转账方式全额支付。 五、施工要求及验收标准 1、施工要求: a、乙方施工时应严格按照甲方所提供的设计标高、用地范围进行施工。 b、乙方采用机械挖、填方时应安排经验非富的且具备上岗资格的操作人员进行现场作业,现场应安排专人进行指挥,不得违章作业;当发现有荒坟或挖出地下埋藏物时应立即通知甲方,不得自行处理;临近管道、埋地电缆处作业时应事先取得管线图,并仔细研究后方能作业,如因私自作业挖断电缆或管道的应由乙方承担全部责任。 c、场平现场的施工管理由乙方主要负责,当发生农民闹事、阻碍施工时乙方应积极配合甲方协调和处理周边关系。造成停工情况达2日以上时,乙方可自行安排机械到其他场地作业,但必须在事情处理完成后1日内将原有机械重新安排进场。 d、场平时对边坡的要求为:挖方区按的坡度放坡,填方区按1:2的坡度放坡。 e、回填要求:填方区应分层回填、分层碾压,每层的回填高度为0.6米,压实系数应达到,此处的压实系数是根据《建筑地基基础设计规范》

借款施工合同通用版

合同编号:YTO-FS-PD843 借款施工合同通用版 In Order T o Protect Their Own Legal Rights, The Cooperative Parties Negotiate And Reach An Agreement, And Sign Into Documents, So As To Solve Disputes And Achieve The Effect Of Common Interests. 标准/ 权威/ 规范/ 实用 Authoritative And Practical Standards

借款施工合同通用版 使用提示:本合同文件可用于合作多方为了保障各自的合法权利,经共同商议并达成协议,签署成为文件资料,实现纠纷解决和达到共同利益效果。文件下载后可定制修改,请根据实际需要进行调整和使用。 甲方:_________ 乙方:_________ 甲乙双方就甲方在_________楼,委托乙方贷资施工、贷资事宜,双方经协商一致,达成贷资施工合同,合同如下: 第一条甲方兴建的综合楼,位于_________,建筑面积_________,建筑物_________层,总投资约_________元。 第二条乙方同意贷资施工,贷资额为人民币_________元,贷资期从开工之日起计时间为一年,贷资计算按年息_________计。 第三条计算时间从开工之日起,按乙方施工进度报表计算,累计核实。 第四条乙方贷资由乙方管理投入,按工程进度核实贷资额度达_________元时,甲方应及时支付工程款。 第五条偿还贷资额本金及利息,一年期必须偿还清,如过期有困难,按年息_________计算,但不能过期二个月,如过期二个月,甲方用建筑物裙楼一至二层抵押给乙

2013版《建设工程施工合同》通用条款详析

2013版《建设工程施工合同》通用条款详析 ————多视角解读(2013年9月17日浙江省建筑业协会2013版合同宣讲培训班授课内容节选) 主讲人:黄伟 【前言】嘉兴市建筑业经过短短数年的发展,其增加值目前已占地方生产总值的比重超过7%,一跃成为我市重要支柱产业之一。在鼓励建筑业企业做大做强的背景下,加强法制的要素保障作用,不可或缺;2013版《建设工程施工合同》的出台,适逢其时。本文以该施工合同通用条款本身、行业管理理念以及司法、仲裁的裁判思路等为视角,展开多方位解读;本文在推举该施工合同中倡导的理念和先进条款的同时,也对需完善之处,作了具体阐述。 ☆以2013版《建设工程施工合同》本身为视角 与1999版施工合同相比,2013版施工合同的特点主要体现在三个方面: 首先,增加了8项新的合同管理制度。 2013版施工合同借鉴国内外相关合同文本的成功经验,在通用条款中增加了双向担保制度、合理调价制度、缺陷责任期制度、工程系列保险制度、商定或确定制度、索赔期限制度、双倍赔偿制度、争议评审解决制度。具体为: (1)双方互为担保制度。 在通用条款2.5“资金来源证明及支付担保”中规定,除专用合同条款另有约定外,发包人应在收到承包人要求提供资金来源证明的书面通知后28天内,向承包人提供能够按照合同约定支付合同价款的相应资金来源证明;除专用合同条款另有约定外,发包人要求承包人提供履约担保的,发包人应当向承包人提供支付担保。 解读:上述合同条款对发包人和承包人的履约保证做出了互相对应的规定,也就是实现了发包人与承包人的互为担保,改变了原来承包人劣势状况,然而客观地说,并未彻底,主要体现在发包人仅提供“提供资金来源证明”,与承包人提供的“履约担保”,属完全不对等的履约保障,而承包人要求发包人提供对等担保,目前条件并不成熟,故对施工单位而言,该条款象征意义大于实际意义。其次,实际操作中,对发包人提供的银行保函,施工单位应注意其措词,尤其是索赔所附加的苛刻条件,避免陷入最后无法实际得到索赔的境地。 ●下面介绍的是一个对保函出具银行极为有利而对受益人不利的保函示范文本: 预付款退款保函 编号: 致受益人***公司: 鉴于***公司(下称"保函申请人")与你方签订了编

工程分包协议书范本

工程分包协议书范本 协议书是契约文书的一种。是当事人双方为了解决或预防纠纷,或确立某种法律关系,实现一定的共同利益、愿望,经过协商而达成一致后,签署的具有法律效力的记录性应用文。下面小编给大家带来安全文明施工协议书,供大家参考! 安全文明施工协议书范文一 依据《中华人民共和国安全生产法》、《中华人民共和国建筑法》和《建设工程安全生产管理条例》及《××市生产安全事故责任划分试行办法》的有关规定,切实加强施工现场安全生产、文明施工管理,避免和减少各类生产安全事故,自觉遵守国家、××市法律、法规及施工现场安全生产、文明施工管理规定,经协商签订“安全生产、文明施工管理协议书”。本《协议书》适用于建设单位直接发包施工、总承包单位配合或提供相关服务的具体情况。 本《协议书》的宗旨是:在建设单位的统一领导下,由施工总承包单位和分包单位共同负责,为建设单位服务,齐心协力完成建设单位交给的各项施工任务。确保工程全过程的安全生产和文明施工。 一、建设单位的权力和义务 l.审查分包单位的施工资质。营业执照及管理人员资质证书,不将施工项目发包给不具备施工资质或施工资质与承包内容不相符的分包单位或个人。 2.审查分包单位施工方案、生产安全事故应急救援预案及安全技术措施。并督促分包单位将上述文件送总承包单位备案。 3.协调分包单位与总承包单位之间发生的施工配合事项,并以书面形式告知总承包单位。 4.如发生生产安全事故,协助分包单位做好抢险、救人及现场保护等相关工作。 5.对分包单位的安全生产、文明施工中的问题,有权提出批评和建议。 二、总承包单位的权利、责任和义务 l.按时完成建设单位交办的各项施工配合工作。 2.配合建设单位做好对分包单位的安全监督与服务工作,对施工现场的安全生产、文明施工负总责。 3.分包单位使用总承包单位的机械、临电、脚手架等设备、设施,双方须办理交接手续,签订《施工现场临时用电管理协议》和《机电架设备、设施移交单》。 4.对分包单位提出的安全生产要求及相关工作提供帮助。 5.对分包单位发生的生产安全事故提供应急救援服务。 6.由于总承包单位或总承包与分包双方责任造成的生产安全事故,根据市政府有关部门的责任划分,承担相应的事故责任和经济责任。 三、分包单位的权利、责任和义务 l.贯彻落实国家及××市有关施工现场安全生产的法规和管理制度,建立健全安全生产责任制和安全生产管理制度,对分包施工区域的安全生产管理负全面责任。 2.服从建设单位、总承包单位的安全生产管理,有权拒绝违反安全生产法规的指令。 3.对由总承包单位交付使用的安全防护设施负有全部责任,并按有关标准设置安全标志。在进行有可能危害他人安全的施工作业前,须告之相关单位及人员。 4.对管辖范围的施工用电负有全部管理责任。b级配电箱以下部分必须符合有关安全用电标准,有权拒绝不符合安全标准的用电设备从所辖线路中拉接电源。 5.对自行携带和使用的机械设备负有安全管理和维护保养的责任,并符合××市有关安全标准。使用特种设备时,应在使用前向总承包单位备案。 6.为本单位作业人员提供合格的劳动保护用品,进行危险预知的教育。对特种作业人员进行安全管理,保证特种作业人员持证上岗,负责建立特种作业人员档案,并向总承包单位

相关主题