编号:_______________本资料为word版本,可以直接编辑和打印,感谢您的下载运输合同:设备搬迁合同甲方:___________________乙方:___________________日期:___________________这篇《运输合同范文:设备搬迁合同》是,希望对大家有所帮助。
以下信息仅供参考!!甲方名称:乙方名称:地址:地址:根据《中华人民共和国合同法》的规定,合同双方就乙方向甲方提供一次性中心机房设备搬迁服务事宜,经协商达成一致,确立本合同,以明确双方的责任、权利及义务,确保合同双方共同执行。
moving services agreementthis moving services agreement (the "agreement") is entered into as of theH 期day of 月份,XX, between 甲方名称with its principal placeof business at 甲方地址(hereinafter referred to as the a shipper " ) and 乙方名称with its principal place of business at 乙方地址(hereinafter referred to as the"carrier").recitalsthe shipper wishes to have its equipmentin the central terminal moved from the current address to 新地址and the carrier is in the business of moving services and assures the shipper that it has the facilities, personnel, and technical expertise necessary to carry out the single full-service move.in consideration of the mutual promises, covenants, and agreements contained herein, both the parties reach theagreement as follows, subject to the contract laws ofpeople / s republic of china. hence, the responsibilities, rights,and obligations of each party are specified with the view to ensuring that both parties will honorably put the agreement into execution.[免责条例]针对甲方需搬迁的设备,乙方只负责硕件设备搬迁不负责数据和软件安全。
对于搬迁的设备,乙方如果需对设备进行拆装,以后因拆装引起的保修问题由甲方负exemptions1. in performing the services stipulated in the agreement, the carrier shall be responsible for moving the shipper / s hardware only, but shall not in any way be held liable for the safety or intactness of the database and software also, the carrier shall uninstall and install the equipment (as defined below), but any problem arising thereof in connection with maintenace and repair of the equipment shall be handled by the shipper only.[服务费用]台式机1套rmb50元服务器1台rmb450 元机柜1台rmb450元小型机1台rmb450元磁盘阵列柜1台rmb450元ups 主机1 台台rmb350元ups电池1 块rmb30元监控器1 台rmb200元交换机1台rmb350元运输车辆1天rmb950元其它设备协商报价service feesitem quantity service fee per unitplatform machine one set rmb50server one set rmb450cabinet one rmb450small machine one set rmb450disc array cabinet one rmb450ups main frame one set rmb350ups battery one rmb30monitor one rmb200switch board one set rmb350vehicle transportation, including the driver, fuel, parkingcharge, andinsurance rmb950 per dayother equipment nato be negotiated and quoted甲乙双方在搬迁完三个工作日内:乙方根据《搬迁验机单》统计此次搬迁设备所产生的费用,将《费用清单》以书面形式交付甲方,甲方核实无误后签字确认,此《费用清单》原件甲乙双方各持一份。
注:因本合同所产生搬迁设备数虽无法在搬迁前确认及统计,所以具体费用以《费用清单》为准。
within three days after the services agreed on are pleted, the carrier is to add up the total cost of theservices on the basis of the delivery receipt duly signed by the shipper and then present the detailed bill in writing to the shipper. after verifying the bill,the shipper shall sign on it. after that, each partyshall be given one copy of the signed bill (see attachment b).note: since the workload involved withthe agreement cannot be precisely estimated before the move, the actual expenses shall depend on nothing other than the final detailed bill.[甲方搬迁前准备]1.做好所有数据备份,确保数据安全;2.选择一条以上运输线路图,提前五日提供给乙方;3.检测新机房温度,湿度,电源环境达到设备使用要求;4.提前办理好搬迁所需的出入门及相关手续,以便搬迁顺利;5.甲方提供一位协调人员与乙方协调人员配合工作;6.新机房设备摆放图,提前五天供给乙方;7.新工作环境和现在工作环境各提供一间作为设备周转用途的工作场地。
preparations on the part of the shipperthe shipper shall make the preparations set forth below:1. reproduce all the digital files in adequate numbers of copies to make certain that the database is in secure select more than one transportation route and provide it for the carrier at least five days prior to the inspect and measure the temperature, humidity, and power supply (with ground connection properly made) in the new terminal to ensurethat they are up to the secure all the entrance andexit permits and go through all the necessary procedures inadvance to facilitate the designate a coordinator to work with the counterpart appointed by the provide the map and the layout of the new terminal for the carrier at least five days prior to the allocate a temporary storage room suitable for the equipment in transit both at origin and at destination.[惠普(hp)服务器,机柜搬迁细则]一乙方搬迁前准备:1.熟知甲方提供的运输线路;2.安排好搬迁人员分工;3.准备所有搬迁所需工具,车辆及相关资料;4.经甲方同意提前三天到新机房熟悉甲方提供的设备摆放图;moving instructions on hp server & cabinet(a). the carrier shall make the following preparations beforehand”. be fully familiar with the transportation route or routes chosen by the divide the workload among its get ready the vehicles and relevant documents as well as all the tools needed, such as various types of screw-drivers, t8 , t9 , t10 , t15 ,t20 , t30 , t40, color-coded labels, cartons, pulleys, wrenches, and shock-absorbing the shipper / s approval, inspect the new terminal and get familiar with its layout three days prior to the move.二服务器,机柜拆卸1.甲方与乙方同时检测服务器状态和服务器配置,检测完后双方在验机单上签字; 2.由甲方关闭所有搬迁设备软件程序;3.由乙方工作人员断开电源;4.拆卸前每位乙方工作人员佩戴防静电手环;5.以甲方现在每个机柜为一套设备进行统一标识; 6.每台服务器对应的联线、硕盘、电源贴上对应标签;7.断开服务器所有联线;8.将服务器拆离机柜,如果拆离硕盘应做好标识;9.对服务器进行包装,对拆离的硕盘做减震包装;10.搬运上车。