当前位置:文档之家› 芯片绑定介绍

芯片绑定介绍


pad
heat
lead
Formation of a second bond Base
pad
heat
lead
pad
lead
pad
lead
pad
lead
Tail length
pad
lead
pad
lead
pad
lead
Disconnection of the tail
pad
lead
Disconnection of the tail
pad
lead
Formation of a new free air ball
pad
lead
Material
Leadfram Capillary Gold Wire
Leadfram (I)
Leadfram ( II )
CAPILLARY (I)
Capillary Manufacturer
•Facilities •Voltage 110 VAC (optional 100/120/200/210/ •220/230/240 VAC
Eagle
MACHINE SPECIFICATIONS (III)
•Material Handling System •Indexing Speed 200 – 250 ms @ 0.5 “ pitch •Indexer Resolution 1um •Leadframe Position Accuracy + 2 mil •Applicable Leadframe W = 17 – 75 mm @ bonding area in Y = 65mm = 17 – 90 mm @ bonding area in Y = 54mm L = 280 mm [Maximum] T = 0.075 – 0.8 mm •Applicable Magazine W = 100 mm (Maximum) L = 140 – 300 mm H = 180 mm (Maximum) •Magazine Pitch 2.4 – 10 mm (0.09” – 0.39 “) •Device Changeover < 4 minutes •Package Changeover < 5 minutes •Number of Buffer Magazine 3 (max. 435 mm)
Eagle
MACHINE SPECIFICATIONS (II) •Vision System •Pattern Recognition Time 70 ms / point •Pattern Recognition Accuracy + 0.37 um •Lead Locator Detection 12 ms / lead (3 leads/frame) •Lead Locator Accuracy + 2.4 um •Post Bond Inspection First Bond, Second Bond Wire Tracing •Max. Die Level Different 400 – 500 um
pad
lead
Formation of a first bond
SEARCH SPEED1
SEARCH TOL 1
pad
lead
Formation of a first bond
IMPACT FORCE
SEARCH SPEED1
SEARCH TOL 1
pad
lead
Formation of a first bond Contact
pad
lead
Capillary rises to loop height position
RH
pad
lead
Formation of a loop
RD (Reverse Distance)
pad
lead
Formation of a loop
pad
lead
pad
lead
WIRE CLAMP „CLOSE‟
Bonding Process
The Wire Bond Temp
PREHEAT CU L/F200+/-10 BONDSITE 200+/-10
AL L/F210+/-10
BGA 150+/-10
230+/-10
160+/-10 160+/-10 160+/-10
TFBGA150+/-10 LBGA 150+/-10
Singulation Solder Plating TRIM/ Dejunk TRIM
SURFACE MOUNTPKG THROUGH
Dejunk TRIM Solder
Packing
HOLE PKG
Plating
FORMING
Wire Bond 原理
Ball Bond Wedge Bond ( 2nd Bond )
pad
lead
Search Speed 2 Search Tol 2
pad
lead
Search Speed 2 Search Tol 2
pad
lead
Formation of a second bond
pad
heat
lead
Formation of a second bond Contact
NOT INCLUDE DEDICATE LINE
Free air ball is captured in thd
Free air ball is captured in the chamfer
SEARCH HEIGHT
pad lead
Free air ball is captured in the chamfer
W/H ASSY
• changeover •· Fully programmable indexer & tracks •· Motorized window clamp with soft close feature •· Output indexer with leadframe jam protection feature
( 1st Bond )
Gold wire
pad
lead
B.PRINCIPLE
PRESSURE
VIBRATION
AL2O3
CONTAMINATION
GOLD BALL GLASS Al SiO2
MOISTURE
Si
銲接條件
HARD WELDING Pressure (Force) Amplify & Frequecy Welding Time (Bond Time) Welding Tempature (Heater)
WIRE BOND PROCESS INTRODUCTION
CONTENTS
ASSEMBLY FLOW OF PLASTIC IC Wire Bond 原理 M/C Introduction Wire Bond Process Material SPEC Calculator
Calculated Wire Length
pad
lead
Calculated Wire Length
pad
lead
SEARCH DELAY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
DEFECT
封裝簡介
晶片Die
金線 Gold Wire 導線架
Lead fram
封裝流程
Wafer Grinding
Wafer Saw
Die Bonding
toaster
Wire Bonding
Die Surface Coating
Molding
Laser Mark
BGA
Solder Ball Placement
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
TRAJECTORY
pad
lead
2nd Search Height
Search Speed 2 Search Tol 2
• Tool less conversion window clamps and top plate enables fast device
Eagle
MACHINE SPECIFICATIONS (I) •Bonding System •Bonding Method Thermosonic (TS) •BQM Mode Constant Current, Voltage, Power and Normal (Programmable) •Loop Type Normal, Low, Square & J •XY Resolution 0.2 um •Z Resolution (capillary travelling motion)2.5 um •Fine Pitch Capability 35 mm pitch @ 0.6 mil wire •No. of Bonding Wires up to 1000 •Program Storage 1000 programs on Hard Disk •Multimode Transducer System Programmable profile, control and vibration modes
相关主题