OPEX调试简明指南Commissioning-manual 类型:技术文件编号:
FOD-FT/现场技术科2006-5-16 1/4 1、电梯第一次启动的准备工作:Preparation before first start:
序号NO. 步骤STEP
备注
REMARK
1 ●电梯供电已使用正式供电,电气系统的机房线路敷设完成,联结准确,带电的零
部件接地保护可靠。
Official power, The wire is connected in machine room exactly, the electriferous accessory of effective grounding.
2
●电梯机房实行管制,严防闲人进入。
进出机房的通道保持畅通
The machine room is controlled, idler is forbid. Keep channels expedite. 3
●电梯安全部件全部安装完毕,并调整到位
The safety part is installed absolutely and exactly.
4 ●电梯井道、底坑、机房楼板面上多余孔洞,凸出物件,都已处理。
Has handled with redundant holes and protruding in hoistway, pit and machine room floor
5 ●电梯层门全部安装完毕,机械锁扣锁合可靠。
自复装置和厅外开锁工作正常。
门
机的门刀最好不要安装。
Landing door is installed absolutely, machine hook is effective. Self-regulation device and door locking device work normally. Do not install door vane best.
6 ●轿厢内和轿顶禁止堆放过多过重的物品。
2、电动机参数自学习Motor parameter auto-turning
●自学习的操作及显示内容见图2-1
Auto-turning work and the show content refer to P2-1 user manua l of P3-14.
9
●自学习完成后,相关的电机参数将自动存入E2参数中
Finished the auto-turning, auto save the correlative motor parameter to E2.
10
●变频器参数H1-06由F改为9
Transducer parameter H1-06, change F for 9
11
●断电后,挂上钢丝绳,,确认轿顶检修正常;
Break off the power, hang up hoist ropes, inspection is normal on the car roof.
3、电梯安装检修运行Inspection running of the install
序号
NO. 步骤STEP
备注
Remark
1
●确认机房在检修状态下,确认井道内无异物,厅门全部安装到位,门框与门洞应无
间隙
4、电梯快车运行调试
5、称重调试weighing adjust
6、调试完毕后的检查the back-check after the debugging
附件Ⅱ(控制主板参数表)基本参数
运行参数
特殊参数
系统故障代码表system failure code
2. 井道自学习故障代码表hoistway learning failure code。