工作危险分析 (JHA)

METHOD STATEMENT (MS) &JOB HAZARD ANALYSIS (JHA) 施工方案(MS)与工作危险性分析(JHA)INDEX 目录1 INTRODUCTION 引言2 DEFINITION OF THE RISK 风险定义3 GENERAL 概述4 ATTACHMENT 附件Attachment A 附件A - Job Hazard Analysis Checklist工作危险性检查表Attachment B 附件B - Job Hazard Assessment Work Sheet工作危险性评估工作表Attachment C 附件C – JHA & Method Statement – Process SummaryJHA & 施工方案–流程概要1 INTRODUCTION 引言The Method Statement (MS) &The Job Hazard Analysis (JHA) is the formal review and development procedure for the consideration of how work is to be accomplished and minimizing, eliminating and or controlling the risk during the operation and performance of the work. Included in this Site Safety Practice is an explanation for managers, discipline engineers, supervisors, foreman and also the workers in the basic step-by-step procedure conducting a JHA.施工方案(MS)与作业危险性分析(JHA)是为了考虑如何完成作业以及减少、消除和控制操作和工作执行期间的风险而进行的正式的检查和实施的程序。

本程序为所有的管理人员、专业工程师、主管、班组长以及工人说明如何进行工作危险性分析(JHA)的基本步骤。

The MS &The JHA Process is considered the most effective method and most commonly used when existing safety management controls are insufficient to guarantee a safe and efficient job.当现有的安全管理措施不足以保证安全的和有效的工作时,施工方案(MS)与工作危险性分析被认为是最有效的方法,也是最通用的方法。

2 DEFINITION OF RISK 风险定义Medium Risk–Where the hazards associated with the work have a known potential to cause a single disabling injury or damage in excess of RMB 50,000.中度风险–已知与一项作业有关的危险可能导致个别丧失行动能力或者损失超过RMB 50,000。

High Risk - Where the hazards associated with the work have a known potential to cause multiple disabling injuries, a fatality or damage in excess of RMB 200,000.高风险- 已知与一项作业有关的危险可能导致多人丧失行动能力、一人死亡或损失超过RMB 200,000。

3 GENERAL 概述The Method Statement is the means by which a contractor intends to perform the work and is to include the following:施工方案是指一个承包商将要执行的作业并且包括下述内容:Brief description of work activity.工作活动的简单描述Location of work / plan of work area.工作地点/工作区域计划Limitations of applicability of method statement or JHA.施工方案或作业危险分析(JHA)的适应性的限制Organisation and Responsibilities - Engineer in Charge, Safety Supervisor, Site Supervisor, Foremen, Tradesmen, General Workers.组织和责任–负责工程师, 安全监理, 现场主管, 工头, 技术工种, 普通工人Construction method - sequence of work, how the job is to be performed incorporating safety and quality, schedule施工方法–工作顺序, 工作如何开展的,综合安全,质量和进度。

Technical requirements & acceptance tolerances.技术要求和允许误差Pre-use inspection requirements for the equipment/tools/materials to be used.将使用的设备/工具/材料的预先使用检查要求Quality control proposal including relevant standards, control points and any special technical requirements.质量控制建议书,包括相关的标准,控制点和所有特殊技术要求HSE proposal including JHA, Material Safety Data Sheets for hazardous substances to be used and any other special HSE requirements安全建议书,包括作业危险分析(JHA), 即将使用的危险物质材料安全数据表和所有特殊安全要求Contractor must submit to DuPont Changshu FLPR Project a Method Statement and JHA for activities as stated in chapter 2.1, prior to work commencing. The Job Hazard Analysis (JHA) involves the detailed and systematic review of a given task, resulting in the identification and understanding of:承包商根据2.1节中描述的作业活动,在作业开始前要向杜邦常熟氟产品项目提交一份施工方案(MS)与作业危险分析(JHA)。

工作危险性分析包括对指定任务进行详细的和系统的检查,以便认识和理解下列各点:The sequence and events or activities to be followed.应遵循的作业次序和事项或活动。

The specific job hazards associated with each activity.与每项作业有关的具体的工作危险性。

The control measures required to eliminate and control the associated risks.消除和控制有关风险所需的控制措施。

A safe work procedure that can be followed by all personnel which includes the precautions needed to betaken whilst performing the work.所有人员应遵循的安全工作程序,包括执行工作期间需要采取的预防措施。

2.1 W hen to perform a JHA 何时进行工作危险性分析A Job Hazard Analysis must be performed by contractors and sub-contractors for all medium to high riskactivities or for new activities where the associated hazards may not be immediately evident.对于所有高风险的作业活动以及可能有即时危险的新的作业,承包商和分包商都必须进行一次工作危险性分析。

A specific JHA is a requirement where the task is known to have a significant hazard, where the task is complex,where there may be hidden hazards or where a high degree of coordination between workers is required. JHA‘s will be required for the following tasks as a minimum:某项作业任务存在重大隐患,或者任务非常复杂,或者可能存在潜在的事故隐患,或者需要众多的工人一起协调作业时,有必要进行工作危险性分析。

至少应该对下列作业任务进行工作危险性分析:Any new or non-routine task that has not been performed before on site that may be hazardous.工地没有实施过的新的或者非常规性的作业任务。

All permit work, confined space entry, hot work, lockout-tag out, electrical, radiation sources etc 所有需要许可证的作业、进入封闭空间、高温作业、上锁和标示、电气作业、射线探伤等 Deep excavations, pile driving, excavations near existing u/g lines or cables.在有地下电缆和地下管线附近进行深度开挖、打桩、开挖等工作。