工艺设计说明

工艺设计说明PROJECT NAME TAR DISTILLATION REVAMPINGPROJECT连云港美盛沃利工程有限公司MAISONWORLEYPARSONS (LYG)ENGINEERING CO., LTD中华人民共和国 住房和城乡建设部 工程设计甲级证书 A132005352 工程设计乙级证书 A232005359项目号 PROJECT No.CC0914D1298 阶 段 PHASE 施工图 装置/工区名称 UNIT NAME 工艺生产装置 PROCESS UNIT页码 SHEET 2 / 6 文件号 DOC. No.CC0914D1298-00-AR-REQ-0001版次 REV.1工艺说明PROCESS DESCRIPTION1ISSUE FOR CONSTRUCTIONGao CQYin YG2010-04-15版 次REV. 说 明DESCRIPTION 设 计P RE’D 校 对CHK’D 审 核APP’D 审 定AUTH’D 日 期 DATE专业D I S C I P L I N E签字S I G N A T U R E日期D A T E本文件仅用于该项目。

未经连云港美盛沃利工程有限公司或业主的书面许可,不得披露或复制。

T H I S D O C U M E N T I S O N L Y U S E D F O R T H E C U S T O M E R P R O J E C T . A N Y D I S C L O S U R E O R C O P Y O F T H I S D O C U M E N T I S N O T P E R M I T T E D W I T H O U T T H E W R I T T E N A P P R O V A L O F M A I S O N W O R L E Y P A R S O N S (L I A N Y U N G A N G ) O R T H E C U S T O M E R O F T H E P R O J E C T .连云港美盛沃利工程有限公司MAISONWORLEYPARSONS (LYG) ENGINEERING CO., LTD中华人民共和国住房和城乡建设部工程设计甲级证书A132005352工程设计乙级证书A232005359项目号PROJECTNo.CC0914D1298 阶段PHASE施工图装置/工区名称UNIT NAME工艺生产装置PROCESS UNIT页码SHEET3 / 6文件号DOC. No.CC0914D1298-00-AR-REQ-0001 版次REV.1目录Table of Contents1.概述GENERAL (4)2.流程说明PROCESS DESCRIPTION (4)3.设计规范Code and Specification for Design (5)工艺说明PROCESS DESCRIPTION No.装置/工区名称UNIT NAME工艺生产装置PROCESS UNIT页码SHEET4 / 6文件号DOC. No.CC0914D1298-00-AR-REQ-0001 版次REV.11. 概述GENERAL1.1. 本项目工艺设计是在业主的输入文件及业主相关意见基础上开展的。

The process design is based on clie nt’s input document and client’s relevant comments.1.2. 设计中,严格遵守现行的国家政策、法规和有关环保、安全规范。

During the design, all applicable policies, rules and regulations relating to safety and environmental protection published by the government had been strictly followed.1.3. 项目业主Project Owner唐山考伯斯开滦炭素化工有限公司(简称TKK)Tangshan Koppers Kailuan Carbon Chemical Co. Ltd.(TKK)1.4. 项目名称Project Name焦油蒸馏工段生产线改造项目Tar Distillation Revamping Project1.5. 生产方案和处理能力Product Scheme and Capacity焦油蒸馏工段生产线改造项目是为30万吨/年焦油加工工程提高沥青QI指标,建于考伯斯开滦炭素化工有限公司厂内焦油蒸馏装置区内。

Tar Distillation Revamping Project is to improve pitch QI for 300,000t/a tar processing project. The project is located tar distillation site.年操作时间The annual operating time: 7920 hours2. 流程说明PROCESS DESCRIPTION本装置主要由焦油加热炉、沥青预处理塔、沥青处理塔、沥青塔循环泵及塔顶冷凝器组成。

This plant is consist of pitch column heater, pitch primary treatment vessel, pitch secondary treatment vessel, treatment vessel circulating pump, and overhead condenser.来自焦油塔底泵的拔顶焦油通过焦油进料泵P84111A/B加压送往进料预热器E84122B和E84122A的壳程,通过吸收处理的拔顶焦油的热量,然后被送往沥青塔加热炉F84103循环。

新鲜物料通过进入沥青塔加热炉循环泵进口管线与循环物料进行混合,通过沥青塔加热炉加热。

从加热炉循环物料溢流进入沥青处理塔T84105和T84106,沥青处理塔能保证停留时间在10~162min内。

每个塔在正常流量(29,813kg/h)时,停留时间保持在81min。

T84106塔底物料处理后的拔顶焦油经沥青塔循环泵P84115A/B,由T84106液位变送器控制进入杂酚油塔。

沥青处理塔塔顶产生的含有轻油的气体和不凝气进入塔顶冷凝器E84123冷却,液相进入凝液回收罐V84111,通过LT84133控制进入原中间罐组。

气体进入气液分离器V84112和V84114进行分离后作为沥青塔加热炉及原有加热炉的燃料,重新工艺说明PROCESS DESCRIPTION No.装置/工区名称UNIT NAME工艺生产装置PROCESS UNIT页码SHEET5 / 6文件号DOC. No.CC0914D1298-00-AR-REQ-0001 版次REV.1回收利用。

事故气体及安全阀泄放气体拟进入待建火炬系统。

Feed for the treatment process is topped tar drawn from the discharge of the Tar Column Reboiler Pumps. This material is delivered to Treatment Feed Pumps P84111A/B, which boost the pressure to that required for pitch yield improvement.The topped tar from bottom of tar column flows the shell sides of Treatment Feed Preheaters E84122B then E84122A, recovering heat from the treated topped tar leaving the treatment process. The topped tar feed then flows into the Pitch Column Heater F84103 circulating loop.Pitch Heater Circulating Pumps P84113A/B deliver a very high throughput of topped tar through the Pitch Column Heater F84103 and circulate this material from the discharge of the heater back through its suction. It is important to note the heater throughput does not change, regardless of the quantity of treatment process feed.Fresh feed mixed into the circulating flow at the circulating pump suction. This incoming feed tends to cool the circulating fluid, forcing additional heater firing.The treatment process feed overflows the Pitch Column Heater F84103 circulating loop and flows to the treatment vessel that can be adjusted for a variety of residence times from about 10 minutes through to 162 minutes. Each vessel provides sufficient capacity for 81 minutes residence time at the normal process feed rate (29,813kg/h).The treatment process product is treated topped tar which is from the Treatment Vessel Circulating Pumps P84115A/B discharge. It flows to the Creosote Column as feed under control of the level controller at Pitch Secondary Treatment Vessel T84106.The treatment vessels T84105 and T84106 produce an overhead stream consisting of light oil vapor and non-condensable gases. This stream flows to condenser E84123 where the gases are cooled and the vapors are cooled and condensed.The condensate flows to Condensate Receiver V84111 where the condensate is collected before being blown to storage under level control LT84133.The gases separate from the liquid in E84123 and are vented through separator V84112 to flowing to the F84103 and existing heater as fuel.Relief valve discharge and incident gas during production flow to flare system that will be built.3. 设计规范Code and Specification for Design➢《石油化工企业设计防火规范》GB50160-2008《Fire prevention code of petrochemical enterprise design》GB50160-2008➢《工业金属管道设计规范》GB50316-2000(2008年版)工艺说明PROCESS DESCRIPTION No.装置/工区名称UNIT NAME工艺生产装置PROCESS UNIT页码SHEET6 / 6文件号DOC. No.CC0914D1298-00-AR-REQ-0001 版次REV.1《Design code for industrial metallic piping》GB50316-2000(2008 Revision)➢《石油化工企业燃料气系统和可燃气体排放系统设计规范》SH3009-2001《Specifications for design of fuel gas system and combustible gas emissionsystem in petrochemical enterprises》SH3009-2001➢《石油化工企业可燃气体和有毒气体检测报警设计规范》SH3063-1999《Specifications for design of combustible gas and toxic gas detection andalarm for petrochemical industry》SH3009-2001➢《石油化工静电接地设计规范》SH3097-2000《Code for the design of static electricity grounding for petrochemicalindustry》SH3097-2000➢《石油化工企业职业安全卫生设计规范》SH3047-1993《Design specification for occupational safety and health in petrochemical industry》SH3047-1993➢《化工工艺设计施工图内容和深度统一规定》HG20519-1992《Specification on content and procedure of detail design file for chemical plant》HG20519-1992。