物流专业英语7
warehouse [ 贮入仓库
destine
[
efficiently [ ,有效地
deliver
[
emphasis [
facilitate [ 使便利
handle
[
易于操纵
2021/3/17
] n.仓库,货栈;vt.
]
vt.注定,预定
]
adv.有效率地
]
vt.递送
]
n.强调,重点
] vt.使容易,
Shipments Cross-docking value-added processing Custom work
Packaging, subassembly,kitting, labeling
Providing color and style tp products
2021/3/17
Unit Ⅶ
Distribution centers
DCs collect data in real time (might deliver less than the batch size. The transfer batch may not, and many times should not, be equal to the process batch-OPT rule).
DCs focus on maximising the profit impact of fulfilling customer (external customer) delivery requirement.
Unit Ⅶ
The role of warehouses in the future
➢Some experts in this field predict the demise of warehouses because inventory stocking will no longer be needed.
An example
2021/3/17
Unit Ⅶ
The processing procedure in this distribution center
Receiving area
Inbound goods
VAS preparation
Recirculation Loop
VAS Processing
[
]
]
]
n.刺激 v.鞭
]
vt.
]
n.分装 ] n.成套工具,用具包,
Unit Ⅶ
Main difference between a DC and a
warehouse
Warehouses
Distribution centers
Warehouses (W) handle most products in four cycle, e.g., receive, store, ship, and pick.
Ws store all products (slow or fast moving).
Ws focus on minimising the operating costs to meet shipping requirements.
2021/3/17
DCs hold predominantly high demand items.
biweekly
[
双周的 2021/3/17 n.半月刊
]
n.边;轮缘;
n.
]
n.香
]
]
adj.
Unit Ⅶ
Performance
[
履行,执行;成绩
Payload
[
n.有效载荷
Downstream
[
游地 adj.下游的
Availability
[
可用性;有效性;实用性
Hygiene
[
ห้องสมุดไป่ตู้
n.卫生;卫生学
staging
[
分段运输
merge
[
没,融合
pallet
[
;棘爪;货盘
debris
[
片,残骸
retrieve
[
得到 n.找回
pneumatic [ 气动的;风力的
lane 2021/3/17
[
]
v.转
]
n.
]
v.合并,并入;结合;吞
]
n.扁平工具
]
n. 碎
]
v.重新
] adj.装满空气的;
]
n.狭窄的通道
]
vt.处理,操作 vi.搬运,
Unit Ⅶ
in batches 地
real time
predominant [ 主要的,有影响的
maximise
[
最大值,最佳化
impact
[
发生影响
external
[
观的 n.外部
dem2021i/s3/e17
[
adv. 分批地,成批
实时 ] adj.卓越的,
] vt.使最大,取
➢About ABC Catering Services Ltd. ➢The Current Work Flow
2021/3/17
Unit Ⅶ
New Words
procurement
[
n. 获得,取得
rim 篮框
[
]
Seoul 首尔
[
]
champagne
[
槟酒;香槟色
replenishment
[
n.补给;补充
2021/3/17
DCs perform a great deal of value-added activities, e.g., final assembly (applying the postponement strategy).
Unit Ⅶ
Warehouses
Ws collect data in batches (generally) (receive and ship goods in batches).
Unit Seven Distribution Center
PART I Distribution Center PART II The ABC Catering Services
Ltd. PART III An Integrated System Of DC
2021/3/17
Unit Ⅶ
New Words
Trash Takeaway
PTL section
2021/3/17
Shipping area
Outbound goods
Distribution centers (DC) handle most products in two cycle, e.g., receive and ship.
Ws perform a minimum of value-added activities (receive-store-ship generally in original forms).
Diagnosis
[
n.诊断
Recommendation [ n202.1推/3/1荐7 ,介绍(信),
]
n.
]
] adv.下
] n.
]
]
]
Unit Ⅶ
PART III An Integrated System Of DC
➢Distribution center design ➢An example-----The Sports Authority's
Regional Distribution Center - An Overview ➢The processing procedure in this distribution center ➢equipments
2021/3/17
Unit Ⅶ
New Words
dynamic [ 学的;动态的
evolving
] n.影响,效果 vt. 对……
]
adj.外部的,客
]
n.死亡,让位 vt.让
Unit Ⅶ
synchronize
[
v.同步
integrated
[
adj.综合的,完整的
spur
[
策,刺激
modify
[
更改,修改
consonlidation
[
n.巩固,合并
sub assembly
kit2021/3/17
Unit Ⅶ
Distribution center design
➢Designing and equipping distribution centers is a complex process.
➢Distribution center design is a dynamic process.
2021/3/17
installation [ 安装,装置;就职
integrate
[
整体,使一体化;
overview
[
;总的看法
inbound
[
的 n.入站 2021/3/17
] adj.动力的;动力
adj.进化的;展开的
]
n.
]
vt.使成
vi.结合
]
n.一般观察
] adj.内地的;归航
Unit Ⅶ
divert
[
移;转向
➢Examples of the changing role of warehouses can be seen in consolidations of