给水工程毕业设计城建学院2008届专业:给水排水班级:水082班目录摘要 (3)Abstract (3)第1章:毕业设计任务书 (5)序言 (5)1.1基本资料 (6)第2章:城市用水量与管网计算 (11)2.1城市最高日用水量计算 (11)2.2城市最高日最大时水量计算 (13)2.3全市最高日用水量变化曲线 (14)2.4管网定线 (14)2.5管网水力计算 (16)第3章:取水和一泵站 (30)3.1岸边式取水构筑物设计 (31)第4章:水处理工艺 (39)4.1投药 (40)4.2混合 (42)4.3稳压配合井流量的计算 (42)4.4絮凝沉淀 (43)4.5过滤 (49)4.6清水池设计计算 (59)第5章:二泵站的设计 (62)第6章:净水厂工艺设计 (62)6.1平面设计 (62)6.2高程布置 (63)第7章:经济预算 (67)7.1计算数据 (74)7.2制水成本的计算 (75)第8章:设计总结 (81)第9章:参考文献 (83)ABSTRACTThis time design topic stays in the city water supply catchment engineering design for the east city in Peking City people's hospital.Should construct to belong to a comprehensive sex mansion, for win dangerous grade building.Concretely design item for:Indoor water supply engineering, indoor catchment engineering, indoor fire fight engineering(include the penstock system and spray to pour system automatically), indoor hot water engineering, total 5 parts.The living cold water water supply system the cent is high,low mark area.Low area 1-4 layers is taken care of a net by the city to supply water directly, the adoption descends to go to ascend to supply water a way to the type;High area 5-16 layers is pumped consociation water supply by the water tank,water, adopting north bound to descend to supply water a way to the type.The ground floor establishes the pond and water pump house.The roof establishes a high water tank, living the water tank and the fire fight water tank to establish for cent.The penstock system doesn't divide area, adopting the temporary high pressure water supply system that the water tank and water pump the consociation water supply.Each penstock box inside establish the fire fight pump bootstrap button, fire fight can start a water pump directly.The roof water tank contains fire fight the water quantity for 10 minutes.A fire continues time to be account with 2 hours.Adopt a wet type to spray a water to extinguish fire system automatically.Each four the layers is an areas, establish a the root sign a tube, total four the roots sign a tube.The water tank highly dissatisfied foot request of that system to water pressure, so establish to increase to press by the side of the water tank steady press an equipments.The wet type reports to the police the valve constitution is indoor in the underground, the water power alarm bell pack Be reporting to the police a valve neighborhood.A fire continues time to be account with an hour.The indoor hot water adoption concentrates the type hot water a supply a method, dividing high and low two areas, the low area 1-4 layersadoption descends to go to ascend to supply water a way to the type;High area 5-16 layer adoption descend to go to ascend to supply water a way to the type.Adopt dry tube circulation.Drain an adoption confluence system, divide the area and water supply system homology.Each one signs tubes all alone a door.Low area 1-4 layers is frowsty, high area 5-16 layer adoptions stretch a crest to ventilate, low areas are all frowsty.This design manual introduced the design,the calculation process of the system in detail.And elaborated several kinds to defend the 噪measure to provide a reference.Keywords:Water supply、catchment、hot water、penstock、spray to pour and divide area、the water pump、water tank、pond.序言给水系统是保证城市,工矿企业等用水的各项构筑物和输配水管网组成的系统。
给水系统由相互联系的一系列构筑物和输配管网组成,它的任务是从水源取水,按照用户对水质的要求进行处理,然后将水输送到用水区。
给水系统通常由取水构筑物,水处理构筑物,泵站,输水管网和调节构筑物组成。
根据老师的资料,再结合图纸,该城市的北方有一条自东向西的河流,城市的中心有一条铁路,根据自然情况将该城市分成两区。
结合图纸和老师的指导,我对城市进行管网设计,设计的内容包括取水和一泵站,水城厂的设计,其中水厂包括投药,混合,絮凝,沉淀,过滤,消毒的部分组成,具体的设计见图纸。
给水设计结束后,我们要对自己的设计进行技术评价,具体计算参看第八章。
通过设计使我们的专业知识加深了,实际动手设计的能力也有所提高,为以后的工作和学习奠定了扎实的基础。
在本次毕业设计中,得到了智修德老师的指导,在此深表感谢!第一章:基本资料1.1城市概述江西新余新玉城位于我国江南地区。
为了缓解城市用水的供需矛盾,确保城市居民的安全用水,该市给水工程的建设迫在眉睫。
该市位于一条自东向西的河流南侧,地面坡度适中。
城市中的铁路将城市分为两个区。
为保持空气新鲜,在城市的主要干道采用洒水车洒水。
本着服务市民和保证工厂用水的目标,必须设计出一套适合该市特色并考虑将来发展需要的给水工程。
要求净水厂出水水质满足我国《生活饮用水卫生标准》。
工业用水取自城市管网,水厂还应考虑消防要求。
面对该市的情况,给水工程势在必行,但是整个工程规模大,投资高,且整个工程规模大,投资高,且整个工程施工工期长,难度大,必须综合考虑,实行边施工边投产的政策。
在解决实际问题中多多思考,综合各方面的利益。
1.2设计题目江西新余新玉城给水工程初步设计。
1.3设计的原始资料1.3.1城市规划(1)江西新余新玉城总平面图,比例1:10000.(2)水厂及工厂位置平面图。
(3)城市人口分区:I区近期2万人,远期5万人,房屋层数7层,有上下水,有卫生设备;II区近期2万人,远期6万人,房屋层数7层,有上下水,有卫生设备,有沐浴。
1.3.2只用城市管网的工厂(1)A厂,生产用水为3600m3/d,重复利用率0%。
工厂总人数1200,分三班工作,其中热车间工作的工人占全部工人的1/3.每班下班后一小时淋浴时间。
淋浴情况(2)B厂,生产用水为1600 m3/d, 重复利用率0%。
工厂总人数1800,,分两班工作,其中热车间工作的工人占全部工人的50%。
每班下班后一小时淋浴时间。
淋浴情况1.3.3浇洒绿地(1)绿地面积:用水100 m3/次.区。
(2)火车站用水量:2400 m3/d。
(自备水源)1.3.4气象资料1.气温:城市年最高气温39°C,年最低气温-2°C;年平均气温17.7°C。