当前位置:文档之家› 合同内清单项

合同内清单项

Fra Baidu bibliotek
set set
14 14
14 14
261.4 145.2
3,659.04 2,032.80
m2 m2 m2
见附页 4.4*4.25 8.5*7.75
424 18.7 66
22.4 35.0 19.8
9,514.56 654.50 1,306.80
E4 Brick work 砌砖 1 Fill the existing window with brick wall 20cm 现有窗户用20cm 砖墙封堵 F Restroom area 卫生间区域 1 Mend the existing window by Smart board 6mm supported by steel barFR-GL 0.27mm 现有窗户修补 m2 见附件 40 34.3 1,372.80 m2 见工程量单 138.56 34.3 4,755.38
第 1 页,共 4 页
No. 2 Brick wall 10 cm 砖墙 3
Work description 工作内容
unit 单位 m2 m2 set set m2
计算式 见工程量单 2.36*1.44*2 1.9*1.44 1 1 3.71*2.6+0.75*1.9 2.45*3.71+1.9*1.8 3.71+2.6+1.81+0.75 +1.9+3.35+2.45+3.7 1 +4.25+1.9+1.81+1.8 *3.1 2.36*1.44*2 1.9*1.44 7 1 5 5 5 2 2 2 2 2 2
quantity 数量 60 9.75 1 1 29.8
unite price 单价USD 23.8 19.8 1,848.0 1,254.0 19.8
Total 合价USD 1,425.60 193.05 1,848.00 1,254.00 590.04
level up the restroom floor 20cm higher for water system 卫生间地板抬高20cm
8 Coto floor tile 30cmx60cm 地砖 9 Floor drain(made in Thailand) 地面排水 Sink supporter made by metal frame 40mmx80mm, 1.5mm thick. 15mm of 10 laminated MFC bord and natural mable conter top 10mm 用40mmx80mm 金属框做的水槽支架、15mm 厚MFC板、10mm 厚大理石台面 11 Toilet cotto (two-piece toilet) code:C-1708-WH 马桶 12 Paper holder cotto stainless steell, code:884 不锈钢抽纸盒 14 Hygienic spray CT-93h-WH 卫生喷雾 15 Tissues box 纸巾盒 18 Sink drain(push pop up drain 落水管 19 Soap dispenser香皂盒 20 Accessories fo sink drainage 落水管配件 21 Mirror 1mx2.4m 镜子 23 MFC door(0.7mx2.1m)10mm laminated formica with lock and door fram 有锁和门框的薄板层压门
m2 piece piece set piece piece piece piece piece piece piece set
29.8 7 1 5 5 5 2 2 2 2 2 2
50.0 19.8 697.0 280.0 35.0 25.0 50.0 20.0 35.0 33.0 92.4 343.2
附件1、Bill of Quantity工程量清单(合同清单项内金额)
Project name:Royal Palace Sales Office of PPCC The owner: MCCO (Cambodia) Co., Ltd. Contractor: No. A Design设计 1 Interior design 内装设计 B Electricity & Water System 水电系统 B1 Electrecity system 供电系统 1 Electrecity cable 4x50 key stone(LSZH Flame retardant Cable) 电缆 2 Excavation 0.2x0.5x70m 电缆沟开挖 3 Metal distribution box 金属分线盒 4 Shocket TSL插座 B2 water system 供水系统 2 Excavation 0.3x0.5x81m 水沟开挖 3 Accessory and glue for PVS pipe 配件及粘合剂 C Site preparation work 现场准备工作 1 Rubish clearing and site preparation work 垃圾清理和现场准备 D Desassemble 拆除工作 1 Remove the existing wooden ceiling 现有木质顶棚拆除 Remove existing window fram painting(include paint remover) 2 现有窗框拆除、刷油漆(包括去除旧油漆) 3 Remove existing remain of rest room tile 拆除现有厕所瓷砖 4 Remove the existing roling window system 拆除现有卷帘系统 5 Remove existing painting(not include window) 去除现有油漆(不含窗户) 6 Remove existinng sliding metal door 拆除现有滑移金属门 7 Remove the existing window(down part) 拆除现有窗户(下部) 8 Remove the existing painting of matal door(main entrance) 去除现有金属门油漆(大门口) m2 piece set piece m2 set set piece 8.5*7.75 14 1 28 见附页 1 14 1 66 14 1 28 850 1 14 1 5.3 52.8 52.8 15.8 1.6 46.2 13.2 158.4 348.48 739.20 52.80 443.52 1,346.40 46.20 184.80 158.40 set 1 1 330.0 330.00 m set 81 1 81 1 3.6 39.6 288.68 39.60 m m piece piece 130 58 1 32 130 58 1 32 23.8 3.3 105.6 4.0 3,088.80 191.40 105.60 126.72 set 1 1 3,200.0 3,200.00 Work description 工作内容 工程名称:金边城市中心皇宫售楼处改造装修工程 业主:中冶海外柬埔寨有限公司 承包方: unit 单位 计算式 quantity 数量 unite price 单价USD Total 合价USD
4 Water system pipe and accesseries 水管及配件 5 water system set up 供水系统安装 6 water proofing with silka product 防水
7 Coto wall tile 30cmx60cm 墙砖
m2
91
50.0
4,550.00
set
5
5
550.0
2,750.00
set set Set
4 1 4
4 1 4
332.0 490.0 408.0
1,328.00 490.00 1,632.00
set set m set m m piece piece piece set set m set m m piece
1.00 1.00 13.00 1.00 6.00 3.00 1.00 1.00 1.00 6.00 6.00 36.00 6.00 30.00 36.00 6.00
493.00 28.00 174.20 13.40 12.00 6.00 10.00 11.20 5.60 2,184.00 168.00 482.40 80.40 60.00 72.00 46.80
2 Tempered glass above the door门上方的钢化玻璃 Tempered glass 10mm thick patition wall(right side of the main entrance) 3 隔墙钢化玻璃(大门右侧) 4 Repaint the existing main door in glossy black 现有主门重新刷乌亮漆 E2 Window窗户 1 New window shuter(lower part)新百叶窗(下部) 2 Paint the window in white mat窗户刷白漆 E3 Ceiling and patition wall 顶棚和隔墙 1 2 3 Ceilling with lighting tank (gyproc bord 9mm thick and steel bar FR-GL 0.27mm)有照明箱的顶棚 Mend the emty wall by gyproc wall on the left side of main gate 大门左侧石膏墙修补 Steel suport for hanging ceiling (replace wooden suport) 顶棚悬吊钢支撑(代替木支撑)
E Reception Hall 接待大厅 E1 Door门 1 Tempered glass 10mm thick, 1m+1m and 2.1m high, clamp VVC 1200) 钢化玻璃 set m2 m2 set 1 1.68*2.38 2.29*3.5 1 1 4 8 1 1,254.0 105.6 105.6 528.0 1,254.00 422.40 844.80 528.00
1,490.00 138.60 696.96 1,400.00 175.00 125.00 100.00 40.00 70.00 66.00 184.80 686.40
Partitoin wall made by plywoo18mm(water registance) laminated 24 formica,Stanleststeell suport system SV 005 卫生间胶合板隔板(防水)塑料装饰板 G Office办公室 1 Door 0.8mx2.1m 门 2 Door 1.4mx2.1m 门 3 Glass window with aluminum frame (1.8*2.3m) 铝合金框玻璃窗 H Aircondition 空调 1 MS11D2-18CR 2HP Midea Instalation free 安装费 Copper pipe 铜管 Hanger 挂钩 Water pipe 水管 Electric wire 电线 Breaker 断路器 Trunking Box copper (pcs) 铜中继盒 Trunking box Eiore (pcs) 中继盒 2 MSAB2-12CR 1.5HP Midea Instalation free 安装费 Copper pipe 铜管 Hanger 挂钩 Water pipe 水管 Electric wire 电线 Breaker 断路器
1.00 1.00 13.00 1.00 6.00 3.00 1.00 1.00 1.00 6.00 6.00 36.00 6.00 30.00 36.00 6.00
493.0 28.0 13.4 13.4 2.0 2.0 10.0 11.2 5.6 364.0 28.0 13.4 13.4 2.0 2.0 7.8
相关主题