当前位置:文档之家› 印度尼西亚煤炭购销合同模板

印度尼西亚煤炭购销合同模板

CONTRACT FOR THE SALE AND PURCHASE OF INDONESIAN COAL

印度尼西亚煤炭购销合同

Contract No:

合同编号:

The Seller (卖方):

Address 地址:

Tel 电话 :

Mobile/手机 :

Fax 传真 :

Ctc 联系人 :

Email :

Registered Address 煤矿地址:

The Buyer (买方):

Address 地址:

Tel 电话:

Fax 传真:

Ctc 联系人:

Email:

This Contract made on the date , 2011 that Seller agrees to sell and the Buyer agrees to purchase the following Goods on the terms and conditions below:

本合同由买方和卖方签订于2011年月日。在合同项下,双方同意依照下列条款买卖下述物资。

1.Goods and Origin 物资名称及原产地

Steam Coal, Origin from Indonesia

动力煤,原产地为印度尼西亚

2.Quantity and Shipment Period 数量及装船日期

2.1 Total Contract quantity 2450000 Metric Tons;

Contract period lasts Thirteen Months (starting from

date of the first shipment). Shipment schedule in

details is as below:

合同总数量为 245万吨,合同期限是合同签署后的13个

月(以执行第一船煤时开始计算),详细如下:

◆From 1st month signed date of this Contract: 50,000

MT +/- 10%

自合同签署后的第1个月50,000吨/月(溢短装

+/-10%)

◆From 2nd to 6th month 100,000 MT/Month +/- 10%

自合同签署后的第2-13个月,每月供应200,000

吨/(溢短装+/-10%)

2.2 First month of this Contract coal supply refers trail

period, used to examine Seller’s delivery ability and quality that matched Contract terms and Buyer’s end-users needs (Power Plant in this case). After trail period finish, Contract will be continued only if Buyer has no dissent.

合同签署后的第一个月为试用期,用来检验卖方的供货

能力和供货质量是否符合合同中的规定并满足买方的最

终用户(电厂)的需求。试用期结束后如买方无任何异

议,合同将接着执行。

2.3 The Seller needs to provide necessary documents to

the Buyer to prove the Mine Producer can give a stable,

quality supply before Contract signed.

合同签署前,卖方必须向买方提供煤炭生产商生产能力、

足够供货能力、煤炭品质的证明文件。

3.Type of Carrier 船型

Handymax Bulk Carrier with gear and grab 轻便型散装

货船(带抓斗)

The draft of the vessel fully packed is no more than

10.50meters.

4.Specifications on ISO Standard 规格(按照ISO标准)4.1 The seller guarantees that the product to be supplied in compliance with

confirmation to the specifications of this contract. The description of all

percentage units in this Contract is referred to the percentage by weight.

卖方保证按照合同规定的指标提供产品。此合同所有重量百分点单位皆以重量

百分比描述。

4.2 Specification规格

Notes: Here Rejection means If the coal’s test result at the Load Port is within the range of Rejection, the Buyer has right to reject the coal and the cost incurred including discharging cost, reloading cost, demurrage and freight back to Indonesia should be borne by the Seller.

备注:拒收是指上述物资假如在卸货港检验报告中的规格在拒收范围内,买方有权对物资拒绝同意并拒绝付款,同时因此产生的卸货费、重装费、滞期费和返程至印度尼西亚的船费将有卖方来承担。

5.Discharging Port 卸货港

The Seller obligates to transport coal at the discharging berths to complete delivery. The Discharging Port is , China. The Buyer can ask the Seller to change the destination port Within 20 days before the carrier leaves Loading Port; the Seller should inform ship-owner immediately.