当前位置:文档之家› 建筑装饰工程施工合同英文版Contract-for-Decoration-Project

建筑装饰工程施工合同英文版Contract-for-Decoration-Project

Contract for Decoration Project

Party A (full name):

Party B (full name):

This Contract is concluded on the basis of the project details by and between the foresaid Party A and Party B in accordance with Contract Law of People’s Republic of China and Construction Engineering Contract Regulations.

1. Overview

1.1 Project name:

1.2 Project site:

1.3 Project content:

1.4 Means of contract:

1.5Construction Period is from date of commence of , to completion date of .

1.6 Quality standard:

1.7 Contract price:

2. Party A’s Responsibilities

2.1 Party A shall provide copy of confirmed construction drawings or instructions to Party B Days prior to the date of commence, clear up all or parts of the buildings, and remove barriers. Party A will take protective measures for the remaining furniture and furnishings. Party A also needs to provide water, electricity, gas and telecommunications, and indicate matters needing attention to Party B. Party A will be responsible for going through all the applications and approval procedures related to the project.

2.2 Party A assigns to be the representative. He will be responsible for the supervision and control over the project, and handle the acceptance, alteration, registration formalities.

2.3Party A entrusts with the construction supervision of this project. The supervision company appoints to be the general supervision engineer, clarifies his responsibilities in the supervision contract, and submits copy of the contract to Party B.

2.4 Party A shall be responsible for protecting the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged, and bear corresponding costs.

2.5 If it is really necessary to change the original building structure or pipelines, Party A shall be responsible for going through the corresponding approval procedures.

2.6Party A will coordinate with relevant departments to do on-site security, fire protection, waste disposal, etc., and bear the corresponding costs.

3. Party B’s Responsibilities

3.1Party B must be available to attend meetings organized by Party A and prepare construction plan and schedule.

3.2 Party B assigns as the site resident representative. He will be responsible for construction organization and completion of the project with good quality.

3.3Party B shall strictly implement the construction specifications, safety operation procedures, fire safety regulations, and environmental protection regulations. It must strictly execute construction abiding by construction drawings or practice instructions, and complete the quality inspection record. Party B must participate in the final completion acceptance, and prepare the project settlement.

3.4 Party B must abide by the provisions on the management of the construction sites by the national or local government and related departments, protect the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged. Party B also need to do a good job in such things as the construction site security and garbage disposal, and deal well with the issue of disturbing residents brought about by construction.

3.5 Without Party A's consent or approval of relevant departments, Party B shall not make any unauthorized changes to original building structure or pipelines.

3.6Party B shall be responsible for protecting all the facilities and finished projects before the project is handed over to Party A.

4. Construction Period

4.1When Party A needs to complete the project ahead of the time limit, it should obtain Party B's agreement and pay the cost for the measures that Party B takes to crash the schedule.

4.2 If the project progress is influenced by the delay of Party A's delivery date, the practically impacted cycle extends accordingly.

4.3If the project can not be started on time or shutdown halfway for no reason because of Party B's responsibility, the practically impacted cycle can not extend accordingly.

相关主题