设计技术协议
构成本合同的文件可视为是能互相说明的,如果合同文件存在歧义或不一 致,则根据如下优先次序来判断:
The documents consisting of this Contract may be deemed as demonstrating mutually; if there is any ambiguity or discordance in the contract document , the following priority shall be followed to judgment.
China and the State Administration of industry and Commerce
0 / 16
发包人:
Employer (Party A): 设计人:
Design Firm (Party B): 发包人委托设计人承担尼日利亚 BPP发电工程设计任务, 工程地点为尼日利
2、合同生效和收到上述有效资料后 45 天内设计人提供概念设计文件:
1)初步概念 GA图( PDF格式) 2)3D 渲染的图像(五个视图, PDF格式) 3)3D 动画解说(长达一分钟) 4)概述功能规格说明书 5)粗略订购成本,建立和组件预算细目
第 2 阶段:修改概念设计的内容
初步概念设计审查后 , 修改概念设计的内容提给 NAMC。O需要调整和修正内容需 经有关部门审定。
Article 4. Name, Scale, Phase, Investment and design Content for the Contract Item (fill in based on industry characteristics)
规模: 3 台 MS9001E 燃气轮发电机组 +3 台余热锅炉 +3 台 60Mw汽轮发电机组联 合循环发电系统
3.1 合同书 3.1 The Contract 3.2 发包人要求及委托书 3.2 Requirement of the employer and Letter of Authority 第四条 本合同项目的名称、规模、阶段及设计内容(根据行业待点填写) :
2 / 16
名称:尼日利亚 BPP发电工程
Scale:3x126MW MS9001E gas turbine generating unit + 3x60MW HRSG + 3x60MW turbo-generation unit combined cycle power system
阶段:概念设计、初步设计及施工图设计
Phase: concept design, preliminary design and detailed design
6 / 16
earthquake data, MS9001E gas turbine generating unit data and HRSG data.
Βιβλιοθήκη Baidu
2. After contract become effective and receive the availability data above in 45 days, the designer supply the concept design.
亚 , 经双方协商一致,签订本合同,共同执行。
Client (Party A) entrusts Xi ’an Datang Electric Power Design Research Institute Najing to undertake the design for Nigeria BPP Generation Engineering ,Project Location is Nigeria.This Contract is made by the two parties after their mutual agreement. 第一条 本合同签订依据
2、海水淡化处理系统和化学水处理系统
淡化海水经化学水处理系统处理后提供除盐水送至电厂余热锅炉和生活用水。
2, Sea water desalination system and chemical water treatment system
Desalination of seawater shall be treated by the chemical water treatment system for the HRSG and living water.
建设工程设计技术协议
Construction Project Design Technical Agreement
(专业建设工程技术协议)
( Profession Construction Project Technical Agreement )
工程名称:尼日利亚 BPP 发电工程
Project Name: Nigeria BPP Generation Engineering
第五条 发包人与设计人相互提交的有关资料、文件及时间:
Article 5. Relevant materials, documents and time submitted to the designer by the employer.
第 1 阶段:概念设计
1、 合同签订时,发包人即提供天然气元素分析资料、海水水质资料,电站当地 气象资料和当地震烈度资料;燃气轮发电机组及余热锅炉资料。
Article 1. This Contract is signed in accordance with: 1.1 《中华人民共和国合同法》 、《中华人民共和国建筑法》和《建设工程勘察 设计市场管理规定》 。 1.1《The Contract Law of the People’s Republic of China》《, The building regulations of the People’s Republic of China》and《 The developmental Law of the People’s Republic of China》. 1.2 国家及地方有关建设工程勘察设计管理法规和规章。
1 / 16
第二条 设计依据 Article 2. Design Basis 2.1 发包人给设计人的委托书 2.1 The Trust Deed of the tender accepted provided to the designer by the employer. 2.2 发包人提交的基础资料 2.2 Fundamental materials submitted by the employer. 设计人采用的主要技术标准是:中华人民共和国设计规范、规定和规程 . The major technical standards adopted by the designer are: Laws and regulations of the People’s Republic of China. 第三条 合同文件的优先次序 Article 3. Priority of Contract Document
4 / 16
7, Building structural parts
Building structural, piping support; Help Haiyi company complete the base of structure design.
The design include the whole area of the power station in this project, fire control, heating ventilation, lighting, communication. The designer supply the all of the equipment list, material list, installation diagram, construction drawing an so on.
3、海水循环冷却水系统
3 / 16
3, Seawater Circulation cooling water system 4、天然气燃料输送系统: 天然气燃料经输送系统至 MS9001E燃气轮机入口。 4, Gas fuel conveying system Gas fuel shall be transported by Gas fuel conveying system to the entrance of MS9001E gas turbine. 5、电气系统 电气主接线系统及 330Kv 升压站系统,出线开关柜出线端以内的全部电气部分, 接入系统由甲方负责。 5, Electrical system Design Content : The main electrical system and Booster station, Electrical part within the outlet side of outlet switch cabinet. Responsibilities of Client : switch in system 6、控制系统 上述范围内的所有 DCS控制系统。 6. Control system DCS Control system above the range. 7、建筑结构部分 厂房建筑结构;管网支架; 设计包含本项目电厂内整个厂区的有关设计 , 包括消防、采暖通风、照明及厂内 通讯等,设计人提供所有的设备清册、材料清册、安装图、施工图等。
第 3 阶段:完成驳船及驳船电厂的基本设计
成果:
5 / 16
规范 2)GA图 3)救生设备计划 4)消防控制计划 5)结构防火保护计划 6)安排的导航灯 7)容量规划 8)中端船舶部分 9)简介甲板计划 10)外壳制造 11)典型的横剖面 12)横向和纵向舱壁 13)前最终结构 14)尾部结构 15)装载坡道或其他安排 16)燃油系统图 17)舱底水系统图 18)压舱系统图 19)淡水系统图 20)电气系统单线图 21)电力负荷平衡 22)微调和稳定性 23)空塔空间计算 24)吨位计算
工程地点:尼日利亚
Project Location: Nigeria
合同编号:
Contract No.:
发包人:
Employer (Party A):
承包单位:
Design Firm (Party B):
签订日期:
Signed on: 5
中华人民共和国建设部 国家工商行政管理局
监制
Supervise and Manufactured by Ministry of Construction of People’s Republic of
第 4 阶段:招标船厂合作协调的补充基础 +安装
Stage 1:The concept design
1. When the contract signed, the employer must supply the analysis data of natural gas, water quality data of sea water, local weather data of power plant, local
1.2 Laws and regulations of the related state and local construction survey and design management. 1.3 建设工程批准文件。
1.3 Documents of Approval for Construction
设计内容 : design content
1、热力系统:
电站内主蒸汽系统、 主给水系统、 抽、排汽系统、 补给水系统及工业冷却水系统。
1, Thermodynamic system
Main steam system, Main FW system, Extraction steam, Dump steam system, Make-up water system, Industry cooling water system.