当前位置:文档之家› 博世的供货合同

博世的供货合同

STL-Agreement (#2004-STL-

1/8

Supplier Consignment Stock Agreement

供 应 商 库 存 协 议 书

Supplier:

供应商:

Buyer: Bosch (China) Heating System Co., Ltd.

采购方: 博世(中国)采暖系统有限公司

No. of Contract

合同编号: 2004-STL-

Date of Signature 2004

签约日期: 二零零

Place of Signature: Lecong, Shunde, Foshan

签约地点: 佛山市顺德区乐从镇

STL-Agreement (#2004-STL-

2/8 This supplementary agreement is signed by the Supplier (hereinafter called “SUPPLIER”)

and the Buyer (hereinafter called “BOSCH”) based on the main Purchase Contract ( )

with friendly consultation, under the principle of fair cooperation, mutual benefit for both

parties.

供应商(以下简称“供应商”)和采购商(以下简称“博世”)在双方签订的主采购合同( )基础之上,经友好协商,本着平等合作、互惠互利的原则签订本补充协议书。

1. Consignment Stock Model – Automatic Production

库存运转模式 – 自动生产

Definition of Goods or Product: The “Goods” or “Product” under this Agreement refer to

all types of products ordered by “BOSCH” from the SUPPLIER. The detailed products

information shall refer to the main Purchase Contract and “Purchase Order” from

BOSCH.

“货物”或“产品”定义:本协议所称“货物”或“产品”,指由博世向供应商订购的各类产品,具体产品信息见双方主采购合同及博世下达之“采购单”。

The SUPPLIER should automatically and timely arrange the production of the

consignment stock and make the related material planning according to the “Demand

Forecast” (see the Annex 1) given by BOSCH 30 days in advance.

供应商根据博世提前三十天时间提供的《需求预测表》(参见附表一)自动及时地安排库存的生产和相关的备料计划。

Under this Agreement, the SUPPLIER shall bear all taxes and fees/costs relating to the

stock, such as storage fee, water and power fee, stock and property insurance premium

etc by itself.

本协议下供应商自行负责货物备库所需的税费/成本,如仓储费、水电费及货物和财产保险等费用。

2. Demand Forecast

《需求预测表》

The first week of each month, the list “Demand Forecast” will by updated by “Production

Planning Department” of BOSCH (hereinafter called “BOSCH/MFO”) and then given to

the SUPPLIER by fax.

每个月的第一周,博世生产计划部对《需求预测表》进行更新,并以传真的方式提供给供应商。

The list “Demand Forecast” shall include the demand forecast of at least three months,

for each month there is an upper limit and a lower limit. Among which, the first month is

fixed quantity, which should be taken by the SUPPLIER as the basis for production of

consignment stock. The second and third month is only forecast quantity and not binding,

which should be taken by the SUPPLIER only for the purpose of future material planning STL-Agreement (#2004-STL-

3/8 《需求预测表》应至少包含三个月的预测需求量,每个月的数量均有一个上限数量和一个下限数量。其中,第一个月的数量为固定数量,作为供应商库存生产的依据。第二、第三个月的数量为预测数量,不具约束力,仅为供应商制定日后备料计划预测用途。

The SUPPLIER must make sure that the upper and lower limits required by BOSCH can

be met accordingly. In principle, the consignment stock reaches the lower level, the

SUPPLIER should start to replenish the stock level. Adversely, when the consignment

stock exceeds the upper level, the SUPPLIER should reduce the stock level to a

reasonable level by adjusting their production plan.

供应商必须保证满足博世的上下限要求。原则上,当供应商的库存降至下限要求时,供应商应开始补库;反之,当供应商的库存超过上限要求时,供应商应通过调整生产计划,将库存水准降至合理的水准。

3. Delivery and Transportation

发货与运输

The delivery shall be arranged by the SUPPLIER according to the Fourth Shift “Purchase

Orders” issued by BOSCH/MFO 1 ~ 2 days in advance by fax. The related “Purchase

Orders” include the codes, type descriptions, quantities, required delivery date, unit

prices and amounts of the cargo etc. Such “Purchase Orders” only become effective after

signed by the duly representative of BOSCH. For any delay in goods delivery, the

SUPPLIER shall compensate economic losses if any caused to BOSCH’s production

thereof.

供应商根据博世生产计划部提前一至两天提供的四班“采购单”(传真件)安排发货。“采购单”的内容包括产品代码、产品型号、数量、要求交货日期、单价、金额等内容。该类“采购单”须经采购商的有效授权代表签署方为生效。如延期交货,应向博世承担因此影响博世生产而造成的经济损失。

The SUPPLIER is responsible to deliver the required goods to the warehouse (or

assembly line) of BOSCH at the required dates, this means, transportation expenses

from SUPPLIER’s warehouse to BOSCH’s warehouse shall be paid by the SUPPLIER.

供应商负责按照博世的具体要求,在指定的日期将货物运送至博世的仓库(或总装生产线上),亦即,供应商承担从其仓库至博世仓库(或总装生产线)之间的运费费用。

The goods delivered by the SUPPLIER to BOSCH must be the ones, which have been

released by “Quality Assurance Department” of BOSCH (hereinafter called

“BOSCH/QAS”) and also tally with the related Purchase Orders of BOSCH/MFO. The

paper showing the information about the related release by BOSCH and the copy of

“Purchase Order” should accompany with the delivery of SUPPLIER. The warehouse (or

assembly line) of BOSCH accepts the delivery by “Release Paper” and “Purchase Order”

involved.

供应商的交货必须是博世质检部已经放行了的产品,且与博世的采购单相吻合。“产品放行证明” (复印件)和“采购单” (复印件)应随货同行。博世的仓库(或总装生产线)凭“采购单”

相关主题