当前位置:文档之家› 2017年建设工程施工合同中英文翻译件范本

2017年建设工程施工合同中英文翻译件范本

工程编号:__________________

Project No.:

合同编号:__________________

Contract No.:

建设工程施工合同

Construction Contract for Construction Projects

(GF-2013-0201)

工程名称:

Name of project:

工程地点:

Location of project:

发包人:

Client:

承包人:

Contractor:

住房和城乡建设部

制定

国家工商行政管理总局

Made by

Ministry of Housing Urban-Rural Development

State Administration for Industry & Commerce of the P. R.C

目录

Table of Contents

第一部分合同协议书……………………………………………………......................…...错误!未定义书签。

Part I Contract Agreement ………………………………………......................…...错误!未定义书签。

一、工程概况 (17)

I. Project Overview (17)

二、合同工期 (18)

II. Project Duration under Contract (18)

三、质量标准 (18)

III. Quality Standard (18)

四、签约合同价与合同价格形式 (18)

IV. Contract Price and Form of Contract Price (18)

五、项目经理 ..........…..........…..........…..........…..........…..........…..........…..........…错误!未定义书签。

V. Project Manager (19)

六、合同文件构成...................................................................................... . (19)

VI. Composition of Contract Prices (19)

七、承诺 (20)

VII. Undertakings (20)

八、词语含义 (20)

VIII. Meanings of Terms (20)

九、签订时间..........…..........…..........…...................................... 2错误!未定义书签。

IX. Time of Signing (21)

十、签订地点 (21)

X. Place of Signing (21)

十一、补充协议............. .. (21)

XI. Supplementary Agreement (21)

十二、合同生效............................................................................................ . (21)

简易工程施工合同范本版

建设工程施工合同 发包方(以下称甲方): 承包方(以下称乙方):山东同兴建设有限公司 根据《中华人民共和国合同法》和《中华人民共和国建筑法》及其它有关法律、行政法规,为明确双方在施工过程中的权利、义务,经双方协商自愿签订本合同。 第一条工程项目 一、工程名称:大自然生物食品科技1#、2#车间 二、工程地点:大自然生物集团有限公司院内 三、工程内容: 四、承包形式: 第二条工程期限 一、合同工期总日历天数天 开工日期:2017年7月10日 竣工日期:2017年8月31日 二、如遇下列情况,经甲方现场代表签证后,工期可相应顺延 1、在施工中如因停电、停水8小时以上或连续间歇性停水、停电3天以上(每次连续4小时以上),影响正常施工;停水停电2天以上; 2、因台风暴雨飓风等不可抗力的因素; 3、因人力不可抗拒的其他因素而延误工期。 三、因乙方原因造成施工延迟的,不得请求顺延工期。 第三条工程价款、结算及付款方式 双方同意按下述第方式支付本合同价款,甲方付款前,乙方应提供正式发票。 第四条建筑材料、设备的供应和采购 一、工程材料、设备由乙方采购。

二、乙方采购的材料、设备,必须附有产品合格证和试验报告才能用于工程,甲方认为乙方提供的材料需要复验的,乙方应按要求提供复验报告。经复验符合质量要求的,方可用于工程;复验不符合质量要求的,应退货处理,其复验费和退货损失由乙方承担。 第五条施工与设计变更 一、甲方签字认定交付的设计图纸、说明和有关技术资料,作为施工的有效依据,乙方不得擅自修改。 二、甲方因使用功能提出的变更内容,为不影响施工进度,乙方应先行实施,并及时做好现场签证。 三、设计变更增减数应以甲方代表签证单为依据,工程采用包干价,对增减部份的工程款由甲乙双方协商确认。 第六条工程质量管理及验收 一、工程具备隐蔽条件,乙方先进行自检,并在隐蔽验收前48小时以书面形式通知甲方验收。验收合格,甲方现场代表在验收记录上签字后,承包人可进行隐蔽和继续施工。验收不合格,乙方予以整改后再交由甲方重新验收。 二、工程具备竣工验收条件,乙方按国家工程竣工验收有关规定,向甲方提供完整竣工资料及竣工验收报告(含竣工图、隐蔽工程签证和现场签证单及保修书等)。验收合格的,双方进行交接,验收不合格的,乙方应及时返工,费用由乙方自行承担,返工导致工期延误的,乙方应承担相应的违约责任。 三、工程质量应符合国家及行业规定的建筑工程质量检验评定的“合格”标准。 第七条安全施工 乙方应遵守工程建设安全生产有关管理规定,严格按安全标准组织施工,采取必要的安全防护措施,消除事故隐患。由于乙方安全措施不力造成事故的责任和因此发生的费用,由乙方承担。

建设工程施工合同协议二

建设工程施工合同协议二 发包人(全称):__________________ 承包人(全称):__________________ 根据《民法典》、《中华人民共和国建筑法》及有关法律规定,遵循平等、自愿、公平和诚实信用的原则,双方就工程施工及有关事项协商一致,共同达成如下协议: 一、工程概况 1.工程名称:___________________________。 2.工程地点:___________________________。 3.工程立项批准文号:__________________。 4.资金来源:___________________________。 5.工程内容:___________________________。 群体工程应附《承包人承揽工程项目一览表》(附件1)。 6.工程承包范围: _____________________________________________。

二、合同工期 计划开工日期:_________年_________月_________日。 计划竣工日期:_________年_________月_________日。 工期总日历天数:_________天。工期总日历天数与根据前述计划开竣工日期计算的工期天数不一致的,以工期总日历天数为准。 三、质量标准 工程质量符合___________________________标准。 四、签约合同价与合同价格形式 1.签约合同价为: 人民币(大写__________________) (¥_________元); 其中: (1)安全文明施工费: 人民币(大写__________________) (¥_________元); (2)材料和工程设备暂估价金额: 人民币(大写__________________) (¥_________元); (3)专业工程暂估价金额:

工程项目管理

工程建设项目管理流程 项目建议书立项可行性研究报告环评设计工作阶段(初步设计、技术设计、施工图设计)建 设准备阶段(三通一平、施工招标)施工安装阶段生产准备阶段(招收和培训生产人员、组 织准备、技术准备、物资准备)竣工验收阶段后评价阶段 1、项目建议书阶段 项目建议书是业主单位向国家提出的要求建设某一项目的建议文件,是对工程项目建设的轮 廓设想。项目建议书的主要作用是推荐一个拟建项目,论述其建设的必要性、建设条件的可 行性和获利的可能性,供国家选择并确定是否进行下一步工作。 项目建议书的内容视项目的不同而有繁有简,但一般应包括以下几方面的内容: (1)项目提出的必要性和依据。 (2)产品方案、拟建规模和建设地点的初步设想。 (3)资源情况、建设条件、协作关系等的初步分析。 (4)投资估算和资金筹措设想。 (5)项目的进度安排。 (6)经济效益和社会效益的估计。 项目建议书按要求编制完成后,应根据建设规模和限额划分分别报送有关部门审批。按现行 规定,大中型及限额以上项目的项目建议书首先应报送行业归口主管部门,同时抄送发展委。行业归口主管部门根据国家中长期规划要求,从资金来源、建设布局、资金合理利用、经济 合理性、技术政策等方面进行初审。行业归口主管部门初审通过后报发展委,由发展委从建 设总规模、生产力总布局、资源优化配置及资金供应可能、外部协作条件等方面进行综合平衡,还要委托具有相应资质的工程咨询单位评估后审批。凡行业归口主管部门初审未通过的 项目,发展委不予批准;凡属小型或限额以下项目的项目建议书,按项目隶属关系由部门或 地方发改委审批。 项目建议书经批准后,可以进行详细的可行性研究工作,但并不表明项目非上不可,项目建 议书不是项目的最终决策。 2、可行性研究阶段 项目建议书一经批准,即可着手开展项目可行性研究工作。可行研究是对工程项目在技术上 是否可行和经济上是否合理进行科学的分析和论证。 (1)可行性研究的工作内容。可行性研究应完成以下工作内容: 1)进行市场研究,以解决项目建设的必要性问题; 2)进行工艺技术方案的研究,以解决项目建设的技术可能性问题; 3)进行财务和经济分析,以解决项目建设的合理性问题。凡经可行性研究未通过的项目, 不得进行下一步工作。 (2)可行性研究的报告的内容。可行研究工作完成后,需要编写出反映其全部工作成果的“可行性研究报告”。就其内容来看,各类项目的可行性研究报告内容不尽相同,但一般应包 括以下基本内容: 1)项目提出的背景、投资的必要性和研究工作依据; 2)需求预测及拟建规模、产品方案和发展方向的技术经济比较和分析;

中英文对照版合同翻译样本

1.Sales Agreement The agreement, (is) made in Beijing this eighth day of August 1993 by ABC Trading Co., Ltd., a Chinese Corporation having its registered office at Beijing, the People’ Repubic of China (hereinafter called “Seller”) and International Tradi ng Co., Ltd., a New York Corporation having its registered office at New York, N.Y., U.S.A. (hereinafter called “Buyer”). 2.WITNESSETH WHEREAS, Seller is engaged in dealing of (product) and desires to sell (product)to Buyer, and WHEREAS, Buyer desires to purchase(product) from Sellers, Now, THEREFORE, it is agreed as follows: 3.Export Contract This Contract is entered into this 5th day of August 1993 between ABC and Trading Co., Ltd. (hereinafter called “Seller”) who agrees to sell, and XYZ Trading Co., Ltd. (hereinafter called “Buyer”) who agrees to buy the following goods on the following terms and condition. 4.Non-Governmental Trading Agreement No. __This Agreement was made on the_day of_19_, BETWEEN _ (hereinafter referred to as the Seller) as the one Side and _ (hereinafter referred to as the Buyer) as the one other Side. WHEREAS, the Seller has agreed to sell and the buyer has agreed to buy _ (hereinafter referred to as the Goods ) the quantity, specification, and price of which are provided in Schedule A. IT IS HEREBY AGREED AS FOLLOWS: 5.Contract For Joint-Operation Enterprise __ COMPANY LTD., a company duly organized under the Law of __ and having its registered office at (hereinafter called “Party A”) AND __ COMPANY LTD., a company duly organized under the Law of __ and having its registere d office at (hereinafter called “Party B”) Party A and Party B (hereinafter referred to as the “Parties”) agree to jointly form a Co-operation Venture Company (hereinafter referred to as the “CVC”) in accordance with “the Laws of the People’s Republic of C hina on Joint Ventures Using Chinese and Foreign Investment” and the “Regulations for the Implementation of the Laws of the People’s Republic of China on Joint Ventures Using Chinese and Foreign Investment” and other applicable laws and regulations. 6.MODEL CONTRACT Contract No. Date: Seller: Signed at: Address: Cable Address: Buyer: Address: Cable Address: The Seller and the Buyer have agreed to conclude the following transactions according to the terms and conditions stipulated below: http://biz.doczj.com/doc/e816774142.html, of Commodity: 2.Specifications: 3.Quantity: 4.Unit Price: 5.Total Price: U.S.$: 6.Packing: 7.Time of Shipment: days after receipt of L/C. 8.Loading Port & Destination Port: From via to . 9.Insurance:

工程管理专业英语翻译(第二版)徐勇戈

U2-S1什么是项目管理? 建筑项目管理不仅需要对设计和实施过程有所理解,而且需要现代管理知识。建设项目有一组明确的目标和约束,比如竣工日期。尽管相关的技术、组织机构或流程会有所不同,但建设项目同其他一些如航天、医药和能源等准等领域的项目在管理上仍然有共同之处。 一般来说,项目管理和以项目任务为导向的企业宏观管理不同,待项目任务的完成后,项目组织通常也会随之终止。(美国)项目管理学会对项目管理学科有如下定义:项目管理是一门指导和协调人力物力资源的艺术,在项目整个生命周期,应用现代管理技术完成预定的规模、成本、时间、质量和参与满意度目标。 与此形成对照,一般的工商企业管理更广泛地着眼于业务的更加连贯性和连续性。然而,由于这两者之间有足够的相似和差异,使得现代管理技术开发宏观管理可以用于项目管理。 项目管理框架的基本要素可以用图2-1表示。其中,应用宏观管理知识和熟悉项目相关知识领域是不可或缺的。辅助性学科如计算机科学和决策科学也会发挥重要作用。实际上,现代管理实践与各专业知识领域已经吸收应用了各种不同的技术和工具,而这些技术和工具曾一度仅仅被视作属于辅助学科领域。例如,计算机信息系统和决策支持系统是目前常见的宏观管理工具。同样,许多像线性规划和网络分析这样的运算研究工具,现在广泛应用在许多知识和应用领域。因此,图2- 1反映了项目管理框架演变的唯一来源。 具体来说,建设项目管理包含一组目标,该目标可能通过实施一系列服从资源约束的运作来实现。在规模、成本、时间和质量的既定目标与人力、物力和财力资源限制之间存在着潜在冲突。这些冲突应该在项目开始时通过必要的权衡和建立新备选方案来解决。另外,施工项目管理的功能通常包括以下: 1. 项目目标和计划说明书中包括规模、预算安排、进度安排、设置性能需求和项目参与者的界定。 2. 根据规定的进度和规划,通过对劳动力、材料和设备的采购使资源的有效利用最大化。 3. 在项目全过程中,通过对计划、设计、估算、合同和施工的适当协调控制来实施项目各项运作。 4. 设立有效的沟通机制来解决不同参与方之间的冲突。 项目管理学会聚焦九个不同独特领域,这些领域需要项目经理所具有的知识和关注度: 1. 项目宏观管理,确保项目要素有效协调。 2. 项目范围管理,确保所需的所有工作(并且只有所需的工作)。 3. 项目时间管理,提供有效的项目进度。 4. 项目成本管理,确定所需资源和维持预算控制。 5. 项目质量管理,确保满足功能需求。 6 . 项目人力资源管理,有效地开发和聘用项目人员。 7 . 项目沟通管理,确保有效的内部和外部通信。 8. 项目风险管理,分析和规避潜在风险。 9. 项目采购管理,从外部获得必要资源。

建设工程施工合同协议条款完整版

建设工程施工合同协议条 款完整版 In the case of disputes between the two parties, the legitimate rights and interests of the partners should be protected. In the process of performing the contract, disputes should be submitted to arbitration. This paper is the main basis for restoring the cooperation scene. 【适用合作签约/约束责任/违约追究/维护权益等场景】 甲方:________________________ 乙方:________________________ 签订时间:________________________ 签订地点:________________________

建设工程施工合同协议条款完整版 下载说明:本协议资料适合用于需解决双方争议的场景下,维护合作方各自的合法权益,并在履行合同的过程中,双方当事人一旦发生争议,将争议提交仲裁或者诉讼,本文书即成为复原合作场景的主要依据。可直接应用日常文档制作,也可以根据实际需要对其进行修改。 建设工程施工合同协议条款 甲方: 乙方: 按照《中华人民共和国经济合同法》和《建筑安装工程承包合同条例》的原则,结合本工程具体情况,双方达成如下协议。 第1条工程概况。 1.1工程名称: 工程地点: 工程内容:

承包范围: 1.2开工日期: 竣工日期: 总日历日期: 1.3质量等级: 1.4合同价款: 第2条合同文件及解释顺序。 第3条合同文件使用的语言文字、标准和适用法律。 3.1合同语言: 3.2适用法律法规: 3.3适用标准、规范: 第4条图纸。 4.1图纸提供日期

中英文对照翻译工程施工管理

5.1 现场布置 5.1 Site Layout 5.1.1项目组织机构图 5.1.1 Project Organization Chart 5.1.2组织机构说明

5.1.2 Introduction of Organization 根据本工程的特点,本着“精干、高效”的原则组建南苏丹Magwi-Lobone公路项目部,项目经理为项目的第一责任人。 In accordance with features of the project and under the principle of “high capability and efficiency”, establish the Southern Sudan Magwi-Lobone Highway Project Department, and the project manager is the primary person in charge of the project. 项目部下设: The Project department comprises: ◆决策层:项目经理、项目副经理、总工程师; ◆Decision-making level: Project Manager, Deputy Project Manager, General Project Engineer; ◆管理层:施工部、技术部、合同部、财务部、QHSE部、机物部、行政部; ◆Management level: Construction Dept., Technology Dept., Contract Dept., Financial Dept., QHSE Dept., Mechanical Materials Dept., Administration Dept.; ◆工区作业层:根据本工程特点,按照工区管理作业队及班组的形式。设置4个工区,即土方一工区、土方二工区、路面工区、综合工区。 ◆Work area operation level: in accordance with features of the project and as per work area’s form to manage operation teams and groups, set up 4 work areas, namely Earthwork area I, Earthwork area II, Road pavement area, Complex processing area. 5.1.3主要管理层的主要工作内容及职责 5.1.3 Main Work Content and Duties of Main Management Level 施工部:负责施工现场的调度及生产组织等。负责测量队的归口管理及协调工作。

中英文对照版合同翻译样本

1.Sales Agreement The agreement, (is) made in Beijing this eighth day of August 1993 by ABC Trading Co., Ltd., a Chinese Corporation having its registered office at Beijing, the People’ Repubic of China (hereinafter called “Seller”) and International Trading Co., Ltd., a New York Corporation having its registered office at New York, N.Y., U.S.A. (hereinafter called “Buyer”). 2.WITNESSETH WHEREAS, Seller is engaged in dealing of (product) and desires to sell (product)to Buyer, and WHEREAS, Buyer desires to purchase(product) from Sellers, Now, THEREFORE, it is agreed as follows: 3.Export Contract th This Contract is entered into this 5 day of August 1993 between ABC and Trading Co., Ltd. (hereinafter called “Seller”) who agrees to sell, and XYZ Trading Co., Ltd. (hereinafter called “Buyer”) who agrees to buy the following goods on the following terms and condition. 4.Non-Governmental Trading Agreement No. __ This Agreement was made on the_day of_ 19_, BETWEEN _(hereinafter referred to as the Seller) as the one Side and _ (hereinafter referred to as the Buyer) as the one other Side. WHEREAS, the

工程管理专业外文翻译--项目成本控制剖析(可编辑修改word版)

项目成本控制 1施工企业成本控制原则 施工企业的成本控制是以施工项目成本控制为中心,施工项目成本控制原则是企业成本管理的基础和核心,施工企业项目经理部在对项目施工过程进行成本控制时,必须遵循以下基本原则。 1.1成本最低化原则。施工项目成本控制的根本目的,在于通过成本管理的各种手段,促进不断降低施工项目成本,以达到可能实现最低的目标成本的要求。在实行成本最低化原则时,应注意降低成本的可能性和合理的成本最低化。一方面挖掘各种降低成本的能力,使可能性变为现实;另一方面要从实际出发,制定通过主观努力可能达到合理的最低成本水平。 1.2全面成本控制原则。全面成本管理是全企业、全员和全过程的管理,亦称“三全”管理。项目成本的全员控制有一个系统的实质性内容,包括各部门、各单位的责任网络和班组经济核算等等,应防止成本控制人人有责,人人不管。项目成本的全过程控制要求成本控制工作要随着项目施工进展的各个阶段连续进行,既不能疏漏,又不能时紧时松,应使施工项目成本自始至终置于有效的控制之下。 1.3动态控制原则。施工项目是一次性的,成本控制应强调项目的中间控制,即动 态控制。因为施工准备阶段的成本控制只是根据施工组织设计的具体内容确定成本目标、编制成本计划、制订成本控制的方案,为今后的成本控制作好准备。而竣工阶段的成本控制,由于成本盈亏已基本定局,即使发生了偏差,也已来不及纠正。 1.4目标管理原则。目标管理的内容包括:目标的设定和分解,目标的责任到位和执行,检查目标的执行结果,评价目标和修正目标,形成目标管理的计划、实施、检查、处理循环,即 PDCA 循环。 1.5责、权、利相结的原则。在项目施工过程中,项目经理部各部门、各班组在肩负成本控制责任的同时,享有成本控制的权力,同时项目经理要对各部门、各班组在成本控制中的业绩进行定期的检查和考评,实行有奖有罚。只有真正做好责、权、利相结合的成本控制,才能收到预期的效果。

建设工程施工合同(简单版)

编号:_______________ 本资料为word版本,可以直接编辑和打印,感谢您的下载 建设工程施工合同(简单版) 甲方:___________________ 乙方:___________________ 日期:___________________

建设工程施工合同甲方发包方法定代表人乙方承包方法定代表人根据《中华人民共和国合同法》和《中华人民共和国建筑法》及其它有关法律、行政法规,为明确双方在施工过程中的权利、义务,经双方协商自愿签订本合同。 第一条工程项目11工程名称。 12工程地点。 13工程内容。 14承包形式。 第二条工程期限21合同工期总日历天数天开工日期年月日。 竣工日期年月日。 22如遇下列情况,经甲方现场代表签证后,工期可相应顺延1在施工中如因停电、停水8小时以上或连续间歇性停水、停电3以上每次连续4小时以上,影响正常施工;停水停电2天以上;2因台风暴雨飓风等不可抗力的因素;3因人力不可抗拒的其他因素而延误工期。 23因乙方原因造成施工延迟的,不得请求顺延工期。 第三条工程价款、结算及付款方式甲方付款前,乙方应提供发票。 本合同实行固定总价,经甲乙双方核定按本工程合同包干价为人民币大写¥元。 任何政策性因素和市场因素均不调整包干价。 31本合同签订后日内,甲方支付人民币元工程款;32工程竣工经甲方验收合格后,甲方支付人民币元工程款;33余款人民币元作为质量保证金,待保修期满后十五个工作日内无息支付。 第四条建筑材料、设备的供应和采购41工程材料、设备由乙方采购。 42乙方采购的材料、设备,必须附有产品合格证和试验报告才能用于工程,甲方认为乙方提供的材料需要复验的,乙方应按要求提供复验报告。 经复验符合质量要求的,方可用于工程;复验不符合质量要求的,应退货处理,其复验费和退货损失由乙方承担。

《建设工程施工合同(示范文本)》范本

(GF—2017—0201) 建设工程施工合同 (示范文本) 住房城乡建设部 制定 国家工商行政管理总局

说明 为了指导建设工程施工合同当事人的签约行为,维护合同当事人的合法权益,依据《中华人民共和国合同法》、《中华人民共和国建筑法》、《中华人民共和国招标投标法》以及相关法律法规,住房城乡建设部、国家工商行政管理总局对《建设工程施工合同(示范文本)》(GF-2013-0201)进行了修订,制定了《建设工程施工合同(示范文本)》(GF-2017-0201)(以下简称《示范文本》)。为了便于合同当事人使用《示范文本》,现就有关问题说明如下: 一、《示范文本》的组成 《示范文本》由合同协议书、通用合同条款和专用合同条款三部分组成。 (一)合同协议书 《示范文本》合同协议书共计13条,主要包括:工程概况、合同工期、质量标准、签约合同价和合同价格形式、项目经理、合同文件构成、承诺以及合同生效条件等重要内容,集中约定了合同当事人基本的合同权利义务。 (二)通用合同条款 通用合同条款是合同当事人根据《中华人民共和国建筑法》、《中华人民共和国合同法》等法律法规的规定,就工程建设的实施及相关事项,对合同当事人的权利义务作出的原则性约定。 通用合同条款共计20条,具体条款分别为:一般约定、发包人、承包人、监理人、工程质量、安全文明施工与环境保护、工期和进

度、材料与设备、试验与检验、变更、价格调整、合同价格、计量与支付、验收和工程试车、竣工结算、缺陷责任与保修、违约、不可抗力、保险、索赔和争议解决。前述条款安排既考虑了现行法律法规对工程建设的有关要求,也考虑了建设工程施工管理的特殊需要。 (三)专用合同条款 专用合同条款是对通用合同条款原则性约定的细化、完善、补充、修改或另行约定的条款。合同当事人可以根据不同建设工程的特点及具体情况,通过双方的谈判、协商对相应的专用合同条款进行修改补充。在使用专用合同条款时,应注意以下事项: 1.专用合同条款的编号应与相应的通用合同条款的编号一致; 2.合同当事人可以通过对专用合同条款的修改,满足具体建设工程的特殊要求,避免直接修改通用合同条款; 3.在专用合同条款中有横道线的地方,合同当事人可针对相应的通用合同条款进行细化、完善、补充、修改或另行约定;如无细化、完善、补充、修改或另行约定,则填写“无”或划“/”。 二、《示范文本》的性质和适用范围 《示范文本》为非强制性使用文本。《示范文本》适用于房屋建筑工程、土木工程、线路管道和设备安装工程、装修工程等建设工程的施工承发包活动,合同当事人可结合建设工程具体情况,根据《示范文本》订立合同,并按照法律法规规定和合同约定承担相应的法律责任及合同权利义务。

建设工程施工合同协议书

建设工程施工专业分包合同 项目名称: 签订日期:2012年10月25日签订地点:

建设工程施工专业分包合同 工程承包人(以下简称甲方): 工程分包人(以下简称乙方): 依照《中华人民共和国合同法》、《中华人民共和国建筑法》及相关法律法规,遵循平等、自愿、公平和诚实信用的原则,甲乙双方就工程专业分包事项,经协商一致,订立本合同。 1、工程专业分包内容 工程名称: 工程地点: 分包范围:。 工程内容:。 2、分包工作期限 2.1开始工作日期: 2012 年 11 月 10 日,结束工作日期: 2013 年 1 月 9 日,总日历工作天数为: 60 天。 2.2工期如需顺延,必须经甲方同意,并以书面形式确定。 3、质量标准 工程质量:按承包合同(指甲方与业主、建设单位签订的施工总承包合同或其他承包合同)关于质量的约定、国家现行规范和标准执行,质量标准为:合格。 4、合同价款 4.1本工程合同总价暂定为人民币:元,(大写:元)。最终总价以经甲方签认的乙方实际完成的合格工作量乘以清单固定综合单价为准。

4.2本工程的设备购置一览表(详见附表一),均为一次包死,不予调整。 4.3本合同设备单价包括了为实施本合同内容所发生的人员及机械设备进出场费、设备装卸费、燃油等以及完成施工图明示或暗示工程量涉及的所有责任、义务、风险、费用(税费除外)。 5、甲方的权利、义务 5.1组建与工程相适应的项目管理机构,组织实施施工管理的各项工作。 5.2向乙方进行技术交底和安全技术交底并提供相关技术资料。 5.3提供施工现场附近的电源、水源接点。电力、管线接至施工现场所发生的费用和水电费由乙方承担。 5.4负责对工程质量、工期、安全生产、文明施工、技术测量、隐蔽工程检查、物资采购、现场计量、作业进度等进行全面管理、控制、监督、检查和验收。 5.5审核乙方提交的结算资料,按本合同约定,办理结算手续,向乙方支付工程款。 5.6制定确保工程质量、环境保护、职业健康安全的措施。 5.7当乙方不能按时按质按量完成合同约定工作内容,甲方有权单方决定调减乙方的工作量,或直接解除本合同,并有权追究乙方的相关责任。 5.8负责与发包方(业主)、监理、设计单位及有关部门进行联系。 5.9施工过程中,最终末次结算付款前,乙方未及时清算为履行本合同而与他人发生的租费、购货款等各种付款义务的,甲方有权暂不支付剩余款项,且不承担相关责任。 5.10经乙方向甲方书面授权,代扣代发乙方在本项目应支付的农民工工资。发现乙方农民工因工资引发上访事件的,有权采取相应的解决措施,所发生的费用及造成的损失由乙方承担;如由此给甲方造成不利影响,视为乙方严重违约,甲方有权解除合同并追究乙方的违约责任。

项目管理术语中英文对照

项目管理术语中英文对照 项目管理术语中英文对照 ACWP Actual Cost of Work Performed 已执行工作实际成本 AD Activity Description 工作描述 ADM Arrow Diagramming Method 箭线图示解法 AF Actual Finish Date 实际完成日期 AOA Activity-On-Arrow 双代号网络图 AON Activity-On-Node 单代号网络图 AS Actual Start Date 实际开始日期 BAC Budget At Completion 在完成时的预算 BCWP Budgeted Cost of work Performed 已执行工作预算成本BCWS Budgeted Cost of work Scheduled 计划完成工作预算成本CCB Change Control Board 变更控制委员会 CPFF Cost Plus Fixed Fee 成本加固定费用(合同) CPIF Cost Plus Incentive Fee 成本加奖励费用(合同) CPI Cost Performance Index 成本执行指数 CPM Critical Path Method 关键线路法 CV Cost Variance 成本偏差 DD Data Date 数据日期 DU Duration 持续时间,工期 EAC Estimate At Completion 在完成时的估算 EF Early Finish date 最早完成日期 ES Early Start date 最早开始日期 ETC Estimate (or Estimated) To Complete 到完成时的估算 EV Earned Value 挣值法 FF Free Float or Finish-to-Finish 自由时差,或完成到完成关系FFP Firm Fixed Price 完全固定总价合同 FPIF Fixed Price Incentive Fee 固定价加奖励费用 FS Finish-to-Start 完成到开始关系 GERT Graphical Evaluation and Review Technique 图示评审技术IFB Invitation For Bid 邀标 LF Late Finish Date 最晚完成日期 LOE Level of Effort 投入水平 LS Late Start date 最晚开始日期 MPM Modern Project Management 现代项目管理 OBS Organization(al) Breakdown Structure 组织分解结构 PC Percent Complete 完成百分比 PDM Precedence Diagramming Method 优先图示法 PERT Program Evaluation and Review Technique 计划评审技术

提单中英文对照(全)

提单中英文对照(全) 1] Reference number (提单号): 2] Name of vessel / Voyage number (船名/航次): 3] E T A (预计到港日): 4] Load Port (起运港): 5] Tranship Port (if any) (中转港): 6] Discharge Port (卸货港): 7] Term of this shipment.( CY/CY ) : 8] Proper shipping name under IMDG code (运输品名): 9] Proper chemical name ( If applicable ) (化学品名): 10]Quantity and type of inner and outer package(内外包装类型及数量): 11]Gross weight (KGS)(货物毛重): 12]Nett weight (KGS) (货物净重): 13]Number, size and type of container (箱型,箱数): 14]Class / UN number (危险品类别/国际编码): 15]Label, subsidiary risk label (危标): 16]Packing group (包装类别): 17]Flash point in unit deg.C ( If applicable )(闪点): 18]MPA group : 19]EMS ( Emergency schedule ) : 20]Marine pollutant ( Yes / No ) (海洋污染): 船公司SO文件的英文简单解释

建设工程施工合同协议条款(协议文本)

The agreement is applicable to Party A and Party B in order to clarify their rights and obligations and ensure that the legitimate rights and interests of both parties are not harmed. (协议范本) 甲方:___________________ 乙方:___________________ 日期:___________________ 建设工程施工合同协议条款(协 议文本)

建设工程施工合同协议条款(协议文本)说明:本协议书适用于甲乙双方为明确各自的权利和义务,经友好协商签署协议,保证权利双方合法权益不受损害。可用于实体印刷或电子存档(使用前请详细阅读条款)。 建设工程施工合同协议条款 甲方: 乙方: 按照《中华人民共和国经济合同法》和《建筑安装工程承包合同条例》的原则,结合本工程具体情况,双方达成如下协议。 第1条工程概况。 1.1工程名称: 工程地点: 工程内容: 承包范围: 1.2开工日期: 竣工日期: 总日历日期: 1.3质量等级:

1.4合同价款: 第2条合同文件及解释顺序。 第3条合同文件使用的语言文字、标准和适用法律。 3.1合同语言: 3.2适用法律法规: 3.3适用标准、规范: 第4条图纸。 4.1图纸提供日期 4.2图纸提供套数: 4.3图纸特殊保密要求和费用: 第5条甲方驻工地代表。 5.1甲方驻工地代表及委派人员名单: 5.2实行社会监理的总监理工程师姓名及其被授权范围(如果有):第6条乙方驻工地代表 第7条甲方工作。 7.1施工场地具备开工条件和完成时间的要求: 7.2水、电、电讯等施工管线进入施工场地的时间、地点和供应要求:

工程管理制度专业外文文献翻译(中英文)

工程管理制度专业外文文献翻译(中英文)

————————————————————————————————作者:————————————————————————————————日期: 2

xxxxxx 大学本科毕业设计外文翻译 Project Cost Control: the Way it Works 项目成本控制:它的工作方式 学院(系): xxxxxxxxxxxx 专业: xxxxxxxx 学生姓名: xxxxx 学号: xxxxxxxxxx 指导教师: xxxxxx 评阅教师: 完成日期: xxxx大学

项目成本控制:它的工作方式 在最近的一次咨询任务中,我们意识到对于整个项目成本控制体系是如何设置和应用的,仍有一些缺乏理解。所以我们决定描述它是如何工作的。理论上,项目成本控制不是很难跟随。 首先,建立一组参考基线。然后,随着工作的深入,监控工作,分析研究结果,预测最终结果并比较参考基准。如果最终的结果不令人满意,那么你要对正在进行的工作进行必要的调整,并在合适的时间间隔重复。如果最终的结果确实不符合基线计划,你可能不得不改变计划。更有可能的是,会 (或已经) 有范围变更来改变参考基线,这意味着每次出现这种情况你必须改变基线计划。 但在实践中,项目成本控制要困难得多,通过项目数量无法控制成本也证明了这一点。正如我们将看到的,它还需要大量的工作,我们不妨从一开始启用它。所以,要跟随项目成本控制在整个项目的生命周期。 同时,我们会利用这一机会来指出几个重要文件的适当的地方。其中包括商业案例,请求(资本)拨款(执行),工作包和工作分解结构,项目章程(或摘要),项目预算或成本计划、挣值和成本基线。所有这些有助于提高这个组织的有效地控制项目成本的能力。 业务用例和应用程序(执行)的资金 重要的是要注意,当负责的管理者对于项目应如何通过项目生命周期展开有很好的理解时,项目成本控制才是最有效的。这意味着他们在主要阶段的关键决策点之间行使职责。他们还必须识别项目风险管理的重要性,至少可以确定并计划阻止最明显的潜在风险事件。 在项目的概念阶段 ?每个项目始于确定的机会或需要的人。通常是有着重要性和影响力的人,如果项目继续,这个人往往成为项目的赞助。 ?确定潜在项目的适用性,大多数组织呼吁编制“商业案例”和“量级”成本,用来证明项目的价值,以便使其可以与其他所有的项目竞争。这项工作是在项目的概念阶段进行,并且作为组织管理整个项目管理的投资组合的一部分被完成。 ?准备商业案例的工作的成本通常包括企业管理开销,但是它可以作为最终项目的一个会计成本来结转。毫无疑问,因为这将为该组织提供一个税收优惠。问题是,那么你如何占有所有不结转的项目? ?如果业务有足够的价值,将批准继续发展和定义阶段。

标书中英文翻译样本及常用词汇

标书中英文翻译样本及常用词汇 1. 投标书Tender 1.1 投标人应完整地填写招标文件中提供的商务投标书、技术投标书、投标一览表和投标报价表(包括投标报价汇总表和分项报价表)。价格表(表中项目除价格数字外都要填写)及报价说明三份(一正二副)和投标人银行保函应分别单独密封,随投标文件一同递交。 Among the tender documents, tenderers shall fill out completely the Business Tender, Technical Tender, Tender List and Tender Quotation. The Quotation (all items in the Quotation shall be filled out except for the prices) and three copies (one Original and two Duplicates) of the Instructions to Quotations as well as the letter of guarantee from the bank of tenderers must be sealed separately, and be submitted together with the tender documents. 1.2 在投标文件澄清后提交的附件6价格表部分正、副本应用信封单独密封,封面上注明项目名称、招标编号、投标人名址、“正本”“副本”字样及“分项价格”和“保密”字样。同时提供单独密封的价格表电子版本一份(WORD格式)。The Attachment 6 to be submitted after the tender documents have been clarified the Original and Duplicate copies of the Quotation must be sealed separately in different envelops, on which the item names, tender codes, tenderer addresses, words of ‘Original’, ‘Duplicate’ and ‘Item Price’ and ‘Confidential’ must be written. An e-version of the Quotation (in WORD format) that is separately sealed must be furnished at the same time. 2. 投标报价Tender Offers 2.1 投标人应在投标报价汇总表和投标分项报价表上标明本合同拟提供货物的单价(如适用)和总价。 On the tender offer summary sheet and the item tender offer sheets, tenderers shall indicate clearly the unit price (if applicable) and the total price of the goods planned to be provided according to the Contract. 2.2 投标分项报价表上的价格应按下列方式分开填写: Prices on the item tender offer sheet shall be filled out in the following manner: 2.2.1从中华人民共和国提供的货物:Goods provided from the People’s Republic of China:

相关主题