当前位置:文档之家› FIDIC设计采购施工(EPC)合同条件(银皮书英文版)

FIDIC设计采购施工(EPC)合同条件(银皮书英文版)

contents

1 General Provisions 1

1.1 Definitions 1

1.2 Interpretation 6

1.3 Communications 6

1.4 Law and Language 7

1.5 Priority of Documents 7

1.6 Contract Agreement 8

1.7 Assignment 8

1.8 Care and Supply of Documents 8

1.9 Confidentiality 8

1.10 Employer’s Use of Contractor’s Documents 9 1.11 Contractor’s Use of Employer’s Documents 9 1.12 Confidential Details 10

1.13 Compliance with Laws 10

1.14 Joint and Several Liability 10

2 The Employer 11

2.1 Right of Access to the Site 11

2.2 Permits, Licences or Approves 11

2.3 Employer’s personnel 12

2.4 Employer’s Financial Arrangements 12

2.5 Employer’s Claims 12

3 The Employer’s Administration 13

3.1 The Employer’s Represent ative 13

3.2 The Employer’s personnel 14

3.3 Delegated Persons 14

3.4 Instructions 15

3.5 Determinations 15

4 The Contractor 15

4.1 The Contractor’s General Obligations 15 4.2 Performance security 16

4.3 Contractor’s Represe ntative 17

4.4subContractors 18

4.5 Nominated Subcontractors 18

4.6 Co-operation 19

4.7 Setting out 19

4.8 Safety procedures 20

4.9 Quality Assurance 20

4.10 Site Data 20

4.11 Suffciency of the Contract Price 21

4.12 Unforeseeable Difficulties 21

4.13 Rights of way and Facilities 21

4.14 Avoidance of Interference 21

4.15 Access Route 22

4.16 Transport of Goods 22

4.17 Contractor’s Equipment 23

4.18 Protection of the Environment 23

4.19 Electricity, Water and Gas 23

4.20 Employer’s Equipment and Free-Issue Material 24 4.21 Progress Reports 24

4.22 Security of the Site 26

4.23 Contractor’s Operations on Site 26

4.24 Fossils 26

5 Design 27

5.1 General Design Obligations 27

5.2 Contractor’s Documents 28

5.3 Contractor’s Undertaking 29

5.4 Technical Standards and Regulations 29

5.5 Training 30

5.6 As-Built Documents 30

5.7 Operation and Maintenance Manuals 31

5.8 design Error 31

6 Staff and Labour 31

6.1 Engagement of Staff and Labour 31

6.2 Rates of Wages and Conditions of Labour 31 6.3 Persons in the Service of Employer 32

6.4 Labour Laws 32

6.5 Working Hours 32

6.6 Facilities for Staff and Labour 32

6.7 Health and Safety 32

6.8Contractor’s Superintendence 33

6.9Contractor’s Personnel 33

6.10 Records of contractor’s Personnel and Equipment 34

6.11 Disorderly Conduct 34

7 Plant, Materials and Workmanship 34

7.1 Manner of Execution 34

epc工程合同范本

epc工程合同范本 篇一:工程总承包EPC合同示范文本 工程总承包合同示范文本 目录 第一部分合同协议书2 第二部分通用条款4 第三部分专用条款 58 第一部分合同协议书 发包人(全称)承包人(全称)依照《中华人民共和国合同法》、《中华人民共和国建筑法》及相关法律、行政法规,遵循平等、自愿、公平和诚信原则,合同双方就_____ 项目工程总承包事宜经协商一致,订立本合同。 一、工程概况 工程名称:工程地点:工程承包范围:二、主要技术来源 三、主要日期 合同期限(绝对日期或相对日期): 施工期限(绝对日期或相对日期):(其中:竣工日期(绝对日期或相对日期):)四、工程质量标准 工程质量标准:五、合同价格和付款货币 合同价格为人民币(大写):元。 除根据合同约定的在工程实施过程中需进行增减的款

项外,合同价格不作调整。 六、本协议书中有关词语的含义与合同通用条款中赋予的定义与解释相同。七、合同生效 合同订立时间:年月日 合同订立地点:本合同在以下条件满足之后生效:_____________________ 发包人:承包人: (公章或合同专用章)(公章或合同专用章) 法定代表人或其授权代表:法定代表人或其授权代表:(签字)(签字)工商注册住所:工商注册住所:企业代码:企业代码:邮政编码:邮政编码:法定代表人:法定代表人:授权代表:授权代表:电话:电话:传真:电子邮箱:开户银行:账号:传真:电子邮箱:开户银行:账号: 第二部分通用条款 第1条一般规定 定义与解释 通用条款,指根据法律、行政法规的规定,合同当事人在履行工程总承包合同过程中所遵守的一般性条款,由本文件第1条至第20条组成。 专用条款,指根据工程总承包项目的实际,对通用条款进行补充、修改和完善,并同意共同遵守的条款。

FIDIC合同(银皮书中文版)

目录 1 一般规定 (1) 1.1定义 (1) 1.2解释 (4) 1.3通信交流 (5) 1.4法律和语言 (5) 1.5文件优先次序 (5) 1.6合同协议书 (5) 1.7权益转让 (6) 1.8文件的照管和提供 (6) 1.9保密性 (6) 1.10雇主使用承包商文件 (6) 1.11承包商使用雇主文件 (7) 1.12保密事项 (7) 1.13遵守法律 (7) 1.14共同的和各自的责任 (7) 2雇主. (8) 2.1现场进入权 (8) 2.2许可、执照或批准 (8) 2.3雇主人员 (9) 2.4雇主的资金安排 (9) 2.5雇主的索赔 (9) 3雇主的管理 (9) 3.1雇主代表 (9) 3.2其他雇主人员 (10) 3.3受托人员 (10) 3.4指示 (10) 3.5确定 (11) 4承包商 (11) 4.1承包商的一般义务 (11) 4.2履约担保 (11) 4.3承包商代表 (12) 4.4分包商 (13) 4.5指定的分包商 (13) 4.6合作 (13) 4.7放线 (14) 4.8安全程序 (14) 4.9质量保证 (14) 4.10现场数据 (14) 4.11合同价格 (15)

4.13道路通行权于设施 (15) 4.14避免干扰 (15) 4.15进场通路 (15) 4.16货物运输 (16) 4.17承包商设备 (16) 4.18环境保护 (16) 4.19电、水和燃气 (16) 4.20雇主设备和免费供应的材料 (17) 4.21进度报告 (17) 4.22现场保安 (18) 4.23承包商的现场作业 (18) 4.24化石 (19) 5设计 (19) 5.1设计义务一般要求 (19) 5.2承包商文件 (20) 5.3承包商的承诺 (20) 5.4技术标准和法规 (21) 5.5培训 (21) 5.6竣工文件 (21) 5.7操作和维修手册 (21) 5.8设计错误 (22) 6员工 (22) 6.1员工的雇用 (22) 6.2工资标准和劳动条件 (22) 6.3为雇主服务的人员 (22) 6.4劳动法 (22) 6.5工作时间 (22) 6.6为员工提供设施 (23) 6.7健康和安全 (23) 6.8承包商的监督 (23) 6.9承包商人员 (23) 6.10承包商人员和设备的记录 (24) 6.11无序行为 (24) 7生产设备、材料和工艺 (24) 7.1实施方法 (24) 7.2样品 (24) 7.3检验 (24) 7.4试验 (25) 7.5拒收 (26) 7.6修补工作 (26) 7.7生产设备和材料的所有权 (26)

建设项目工程总承包合同(EPC)示范文本

GF-2017-0216 建设项目工程总承包合同 住房和城乡建设部 制定 国家工商行政管理总局

第一部分合同协议书 发包人(全称) 承包人(全称) 依照《中华人民共和国合同法》、《中华人民共和国建筑法》、《中华人民共和国招标投标法》及相关法律、行政法规,遵循平等、自愿、公平和诚信原则,合同双方就大唐盛世商务公寓、白云山、龙珠塔、半岛酒店项目工程总承包事宜经协商一致,订立本合同。 一、工程概况 工程名称: 工程批准、核准或备案文号: 工程内容及规模: 工程所在省市详细地址: 工程承包范围: 二、工程主要生产技术(或建筑设计方案)来源 三、主要日期 设计开工日期(绝对日期或相对日期): 施工开工日期(绝对日期或相对日期): 工程竣工日期(绝对日期或相对日期):

四、工程质量标准 工程设计质量标准: 工程施工质量标准: 五、合同价格和付款货币 合同价格为人民币(大写):元(小写金额:元)。 详见合同价格清单分项表。除根据合同约定的在工程实施过程中需进行增减的款项外,合同价格不作调整。 六、定义与解释 本协议书中有关词语的含义与通用条款中赋予的定义与解释相同。 七、合同生效 本合同在以下条件全部满足之后生效: 发包人:承包人: (公章或合同专用章)(公章或合同专用章) 法定代表人或其授权代表:法定代表人或其授权代表:(签字)(签字) 工商注册住所:工商注册住所: 企业组织机构代码:企业组织机构代码:

邮政编码:邮政编码: 法定代表人:法定代表人:授权代表:授权代表: 电话:电话: 传真:传真: 电子邮箱:电子邮箱: 开户银行:开户银行: 账号:账号:合同订立时间:年月日 合同订立地点:

英文版外贸合同(中英文对照版)

外贸合同 Contract( sales confirmation) 合同编号(Contract No.): _______________ 签订日期(Date) :___________ 签订地点(Signed at) :___________ 买方:__________________________The Buyer:________________________ 地址:__________________________Address: _________________________电话(Tel):___________传真(Fax):__________ 电子邮箱(E-mail):______________________ 卖方:___________________________The Seller:_________________________地址:___________________________Address: __________________________电话(Tel):_________传真(Fax):___________ 电子邮箱(E-mail):______________________

买卖双方同意按照下列条款签订本合同: The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below: 1. 货物名称、规格和质量(Name, Specifications and Quality of Commodity): 2. 数量(Quantity): 允许____的溢短装(___% more or less allowed) 3. 单价(Unit Price): 4. 总值(Total Amount): 5. 交货条件(Terms of Delivery) FOB/CFR/CIF_______ 6. 原产地国与制造商(Country of Origin and Manufacturers): 7. 包装及标准(Packing): 货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。 The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as "Do not stack up side down", "Keep away from moisture", "Handle with care" shall be stenciled on the surface of each package with fadeless pigment. 8. 唛头(Shipping Marks): 9. 装运期限(Time of Shipment):

epc合同实用版

YF-ED-J3815 可按资料类型定义编号 epc合同实用版 An Agreement Between Civil Subjects To Establish, Change And Terminate Civil Legal Relations. Please Sign After Consensus, So As To Solve And Prevent Disputes And Realize Common Interests. (示范文稿) 二零XX年XX月XX日

epc合同实用版 提示:该合同文档适合使用于民事主体之间建立、变更和终止民事法律关系的协议。请经过一致协商再签订,从而达到解决和预防纠纷实现共同利益的效果。下载后可以对文件进行定制修改,请根据实际需要调整使用。 epc合同(一) 发包人(全称): 承包人(全称): 发包人为实施***(项目名称),已接受承 包人对该项目勘察设计施工总承包投标。依照 《中华人民共和国招标投标法》、《中华人民 共和国合同法》、《中华人民共和国建筑法》 及其他有关法律、行政法规,遵循平等、自 愿、公平和诚实信用的原则,双方共同达成并 订立如下协议。 1、工程概况

工程名称: 建设规模: 工程地点: 立项批文: 资金来源: 2、工程承包范围 本工程的设计(含勘察)、施工直至竣工验收合格及整体移交、工程保修期内的缺陷修复和保修工作。 3、合同工期 计划开始工作时间: 工期控制:日历天,其中设计(含勘察)周期日历天,施工工期日历天。实际开始工作时间按照监理人开始工作通知中载明的开始工作时间为准。

4、质量标准 设计质量标准: 施工质量标准: 5、签约合同价 设计(含勘察):按照国家发展计划委员会、建设部制订的《工程勘察设计收费标准》(20xx年修订本)之规定设计收费标准下浮%计算,计费额为经XX政府投资项目评审中心评审后的预算控制价。暂定设计(含勘察)费人民币元(大写:元整)。 施工:以经评审的预算控制价下浮%作为计价基础。暂定施工签约合同价人民币元(大写:元整),最终工程结算价款以国家审计机关审定金额为准。 6、承包人项目经理

国际贸易合同中英文对照版

编号:_______________ 本资料为word版本,可以直接编辑和打 印,感谢您的下载 国际贸易合同中英文对照版 甲方:___________________ 乙方:___________________ 日期:___________________

英文进口合同范本-- 合同编号(Contract No.): 签订日期(Date) : ________________

m 甘售 inr (signed a ° ________ __ The Buyer _________________________________________

Address- C >5H (T E _) -—— ________ f 火客a (E —ma=H ___________________________

卖方: The Seller: 地址: Address: 电话(Tel):_ 传真(Fax): 电子邮箱(E-mail):

买卖双方同意按照下列条款签订本合同: The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below: 1. 货物名称、规格和质量( Name, Specifications and Quality of Commodity ): 2. 数量(Quantity ): 允许的溢短装( % more or less allowed ) 3. 单价(Unit Price ): 4. 总值(Total Amount ):

2×220mw火电厂epc总承包合同(中英文对照)

某国外工程EPC合同2 APPENDIX 2 CONTRACT DATA SHEET 附件2 合同数据表 Name of Contract: EPC Contract on XX2×220MW Thermal Power Plant 合同名称: XX2×220MW火电厂EPC总承包合同 Clause Ref.参考条款Data 数据 GC1 Owner业主 Contractor 总承包商 Conciliator(s)仲裁者 Name : GC1 Time completion Plant for : 电厂竣工时间 -Unit No.1: 36 (thirty six) months from effective date of Contract. 1号机组:从合同生效之日起36个月; -Unit No.2 and the whole Plant: 42 (forty two) months from effective date of Contract. 2号机组及整个电厂:从合同生效之日起42个月; GC4 Contacts for Notice Purposes: 联系: YY Headquarters:

GC5 The Governing Law适用法律: Governing Law shall be the Law of the Socialist Republic of Vietnam. The Contractor shall perform the Contract strictly in compliance with the Law of Vietnam. Claims referring to Settlement of the Disputes (if any) arising during the Contract’s performance shall be governed by the laws issued and in-use in the Socialist Republic of Vietnam. 合同适用的法律是某国社会主义共和国的法律。承包商应该严格遵 循某国法律执行合同。如果在合同执行工程中出现争执,由某国社 会主义共和国的现行法律来处置争执。 GC8.1 Contractor shall commence work on the XXCoal-fired Thermal Power Plant right after the Effective Date 承包商应该在合同生效之日起,开始执行XX燃煤火电厂总包合同。 The Contract shall enter into full force and become effective on the date when all of the following conditions have been fulfilled: 以下条件满足后,合同才能全面生效: 1)this Contract Agreement has been signed for and on behalf of YY and the Contractor; YY集团和承包商代表签署合同协议。 2)The Bidder has submitted to YY the Performance Security and Advance Payment Guarantee ; 投标商向YY集团支付履约保函和预付款保函。 3)The Bidder has received the Advance Payment from YY in accordance with relevant terms of the Contract. 投标商根据合同条款的规定,从YY集团收到预付款。 GC11.2 The price shall be fixed 合同总价固定 GC13.3 Amount of Performance Bond is 10% of Contract price 履约保函是合同总价格的10% GC25.2.2 Period during which the Guarantee Test should be conducted following commissionin g: first test before Reliability Run, second and third test between start Reliability Run and within 3 months after PAC. 性能实验在调试后进行:第一次在可靠性运行前进行,第二次和第 三次(如有)在可靠性运行开始至PAC后三个月期间。

fidic合同条件体系及应用讲解学习

FIDIC合同条件体系及应用 FIDIC合同条件体系及应用 一、FIDIC合同主要文件构成 FIDIC专业委员会编制了一系列规范性合同条件,构成了FIDIC合同条件体系,包括: (红皮书) FIDIC土木工程施工合同条件 Conditions of Contract for Work Of Civil Engineering Construction (新红皮书) FIDIC程施工合同条件(1999年新增) Condition of Contract for Construction 注:《施工合同条件》(新红皮书)的全称是:由业主设计的房屋和工程施工合同条件(Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer); (黄皮书) FIDIC电气与机械工程合同条件 Conditions of Contract for Electrical and Mechanical Works (新黄皮书) FIDIC永久设备和设计—建造合同条件(1999年新增) Conditions of Contract for Plant and Design—Build

注:《设备与设计-建造合同》(新黄皮书)的全称是:由承包商设计的电气和机械设备安装与民用和工程合同条件(Conditions of Contract for Plant and Designed-Build for Electrlcal and Mechanical Plant and Building and Engineering Works Designed by the Contractor)。 (橘皮书)FIDIC设计-建造与交钥匙工程合同条件 Conditions of Contract for Design— Build and Turnkey (银皮书)FIDIC设计采购施工(EPC)/交钥匙工程合同条件 Conditions of Contract for EPC Turnkey Projects (白皮书)FIDIC业主咨询工程师标准服务协议书条件(1998年第三版)Conditions of Contract for EPC/Turnkey Projects (绿皮书)合同的简短格式 Short Form of Contract 二、FIDIC主要合同文件的适用性 国际承包工程涉及到的FIDIC合同主要有四种: 常见的是土木工程施工方面的,正式名称为《土木工程施工合同条件》(Conditions of Contract for Works of Civil Engineering Construction),由于封皮是红色的,海外通常叫做“红皮书”; 还有黄色封皮的,是机电工程方面的,正式名称为《机电工程合同条件》(Conditions of Contract for Electrical and Mechanical Works),常叫“黄皮书”;

EPC项目合同管理要点

EPC项目合同管理要点 1、合同的审批 严格履行合同审批制度,特殊合同和涉外合同文本,应在总经办、商务部、财务部、工程技术部等部门进行必要的专业审查后,送合同管理部门审查核定,由主管总裁审批同意,方可签订。 合同管理部门审查的重点是:对方当事人的主体资格和缔约能力;合同条款内容的完备性、合法性;合同应履行的审查手续。董事长监察、检查对外签订的工程项目合同。“合同评审程序”另行规定。 2、合同的签订 合同由本公司法人代表签订,或由本公司法定代表人书面委托的本公司有关人员代理签订。签订合同应由签约人签字,注名日期,并加盖合同专用章或本公司公章。代理本公司法定代表人签订合同的,签约人应持本公司法定代表人签发并加盖本公司公章的《法定代表人授权委托书》,并在授权范围内签订合同。 3、合同的履行 合同签订后,应全面履行合同。在合同履行中,如出现不能或者不能完全履行时,应采取紧急措施,争取对方的同意和谅解,将损失减少到最低程度;若需要变更或解除合同的,应按法律规定的程序进行。工程项目合同的履约率应达到95%以上(合同执行中如有问题应征得对方同意和谅解)。履约率就是已完成合同的金额与应完成合同金额的比率。 4、合同文本及用章的规定 本公司对外签订的所有工程项目合同必须统一合同文本,严禁使用不符合要求的合同书。 合同专用章由合同管理部门统一编号、发放。使用单位须专人保管,并在合同管理部门办理备案手续。 5、合同归档 建立合同管理档案,对已签订的合同要逐份进行分类、编号、登记,并装订成册。 合同签定完毕,合同承办人要在三个工作日内及时将合同材料(如:合同文本及分合同文件、合同评审记录、审批文件、合同纠纷仲裁结果、合同变更等与合同有关的资料),交给合同管理员进行统一管理。 对已执行完毕的合同要注明“存档”标记,并注明日期,按本公司档案管

中英文对照版进口合同

Purchase Contract CONTRACT NO.: _ SIGNING DATE: SIGNING PLACE: 买方:卖方: Buyer: Seller: Tel: Tel: Fax: Fax: Mobile: Mobile: 买方同意购买,卖方同意出售下述商品,并按下列条款签订合同。 The contract is made by and between the Buyer and the Seller, whereby the Buyer agrees to buy and the Seller agrees to sell the under-mentioned commodity according to the terms and conditions stipulated below. 1.商品名称、规格、数量及价格: 2.生产国别和制造厂商: COUNTRY OF ORIGIN AND MANUFACTURE: 3.包装:适合长途海运/空运的防潮防破的标准包装,符合中国海关卫生检疫要求。 PACKING: All goods are to be packed in seaworthy export standard packages according to international standards. 4.唛头:买方选择 SHIPPINGMARK: Option by buyer 5.装运时间: TIME OF SHIPMENT: 6.装船港口:目的港口: PORT OF SHIPMENT: PORT OF DESTINATION: 7.付款条件: TERMS OF PAYMENT: 8.保险:装船时由卖方以买方为受益人按发票金额的110%投保险 INSURANCE: To be covered by the buyer for 110% of invoice value covering risks with the Buyer as beneficiary. 9.合同单据: (1)注明合同号,签字正本发票5份。

epc合同条件(中英文对照版)

CONTENTS 目录 1 General Provisions 一般规定 (5) 1.1 Definitions 定义 (5) 1.2 Interpretation 解释 (10) 1.3 Communications 通信交流 (11) 1.4 Law and Language 法律和语言 (12) 1.5 Priority of Document 文件优先次序 (12) 1.6 Contract Agreement 合同协议书 (13) 1.7 Assignment 权益转让 (13) 1.8 Care and Supply of Document 文件的照管和提供 (13) 1.9 Confidentiality 性 (14) 1.10 Employer’s Use of Contractor’s Documents雇主使用承包商文件 (14) 1.11 Contractor’s Use of Employer’s Documents承包商使用雇主文件 (15) 1.12 Confidential Details 事项 (15) 1.13 Compliance with Laws 遵守法律 (15) 1.14 Joint and Several Liability 共同的和各自的责任 (16) 2 The Employer 雇主 (16) 2.1 Right of Access to the Site 现场进入权 (16) 2.2 Permits, Licences or Approves 许可、执照或批准 (17) 2.3 Employer’s personnel雇主人员 (18) 2.4 Employer’s Financial Arrangements雇主的资金安排 (18) 2.5 Employer’s Claims雇主的索赔 (18) 3 The Employer’s Administration雇主的管理 (19) 3.1 The Employer’s Representative雇主代表 (19) 3.2 The Employer’s personnel其他雇主人员 (20) 3.3 Delegated Persons 受托人员 (20) 3.4 Instructions 指示 (21) 3.5 Determinations 确定 (21) 4 The Contractor 承包商 (22) 4.1 The Contractor’s General Obligations承包商的一般义务 (22) 4.2 Performance security 履约担保 (22) 4.3 Contractor’s Representative承包商代表 (24) 4.4 Subcontractors 分包商 (24) 4.5 Nominated Subcontractors 指定的分包商 (25) 4.6 Co-operation 合作 (25) 4.7 Setting out 放线 (26) 4.8 Safety procedures 安全程序 (26) 4.9 Quality Assurance 质量保证 (27) 4.10 Site Data 现场数据 (27) 4.11 Sufficiency of the Contract Price 合同价格 (28) 4.12 Unforeseeable Difficulties 不可预见的困难 (28) 4.13 Rights of way and Facilities 道路通行权于设施 (28) 4.14 Avoidance of Interference 避免干扰 (29) 4.15 Access Route 进场通路 (29)

FIDIC设计采购施工EPC合同条件银皮书中文版

. 目录 1 一般规定 (1) 1 ....................................................................... 1.1定义 3 ....................................................................... 1.2解释 3 ................................................................... 1.3通信交流 4 ................................................................. 1.4法律和语言 4 ............................................................... 1.5文件优先次序 4 ................................................................. 1.6合同协议书 4 ................................................................... 1.7权益转让 4 ........................................................... 1.8文件的照管和提供 4 ..................................................................... 1.9保密性 4........................................................ 雇主使用承包商文件1.10 5........................................................ 1.11承包商使用雇主文件5.................................................................. 1.12保密事项5.................................................................. 1.13遵守法律5........................................................ 1.14共同的和各自的责任 2雇主. (5) 5................................................................. 现场进入权 2.1 6........................................................... 许可、执照或批准 2.2 6................................................................... 雇主人员 2.3 6............................................................. 雇主的资金安排 2.4 6................................................................. 雇主的索赔 2.53雇主的管理 .. (7) 7 ................................................................... 3.1雇主代表 7 ............................................................... 3.2其他雇主人员 7 ................................................................... 3.3受托人员 7 ....................................................................... 3.4指示 8....................................................................... 确定3.5 4承包商 ............................................................ 8 8........................................................... 4.1承包商的一般义务 8................................................................... 履约担保 4.2 9................................................................. 承包商代表 4.3 9..................................................................... 分包商 4.4 9 ............................................................... 4.5指定的分包商 9 ....................................................................... 4.6合作 10...................................................................... 放线4.7 10.................................................................. 4.8安全程序

EPC总承包合同(最新版)

项目总承包合同示范文本 项目名称: 发包方: 承包方: 签订地点: 签订日期: 第一部分合同协议书 发包人(全称) 承包人(全称) 依照《中华人民共和国合同法》及相关法律、行政法规,遵循平等、自愿、公平和诚信原则,合同双方就_____ 项目总承包事宜经协商一致,订立本合同。 一、项目概况 项目名称: 项目地点: 承包范围: 二、主要技术来源 三、主要日期 合同期限(绝对日期或相对日期): 四、质量标准 质量标准: 五、合同价格和付款货币 合同价格为人民币(大写):元。 除根据合同约定的在项目实施过程中需进行增减的款项外,合同价格不作调整。 六、本协议书中有关词语的含义与合同通用条款中赋予的定义与解释相同。 七、合同生效 合同订立时间:年月日

合同订立地点: 本合同在以下条件满足之后生效: 发包人:承包人: (公章或合同专用章)(公章或合同专用章) 法定代表人或其授权代表:法定代表人或其授权代表: (签字)(签字) 工商注册住所:工商注册住所: 企业代码:企业代码: 邮政编码:邮政编码: 电话:电话: 传真:传真: 电子邮箱:电子邮箱: 开户银行:开户银行: 账号:账号: 第二部分通用条款 第1条一般规定 1.1 定义与解释 1.1.1 通用条款,指根据法律、行政法规的规定,合同当事人在履行项目总承包合同过程中所遵守的一般性条款,由本文件第1条至第20条组成。 1.1.2 专用条款,指根据项目总承包项目的实际,对通用条款进行补充、修改和完善,并同意共同遵守的条款。 1.1.3 项目总承包,指承包人受业主委托,按照合同约定对项目的设计、采购、施工(含竣工试验)、试运行等实行全过程或设计与其他阶段的项目承包。 1.1.4 发包人,指在合同协议书中约定的,被称为发包人的当事人,包括其合法继承人和经许可的受让人。 1.1.5 承包人,指在合同协议书中约定的,被发包人接受的具有项目总承包主体资格的当事人,包括其合法继承人。 1.1.6 分包人,指接受承包人根据合同约定对外分包的部分项目或服务的,

进口合同中英文对照

CONTRACT 合同号Contract 日期Date: 地点:Place: 卖方:The Seller: 地址:Address: TEL: FAX: 买方:The Buyer: 地址:Address: TEL: FAX: 本合同由买卖双方缔结,按照下述条款,卖方同意售出,买方同意购进以下商品: The Seller agrees to sell and the Buyer agrees to buy the under mentioned goods subject to terms and conditions set forth hereinafter as follows: 1.商品名称及规格NAME OF COMMODITY AND SPECIFICATION: 2.数量QUANTITY: 3.单价(包装费包括在内)UNIT PRICE (PACKING CHARGES INCLUDE): 4.总值: TOTAL VALUE: USD 5.包装(适于海洋运输)PACKING (SEAWORTHY):

6.生产国别及制造商COUNTRY OF ORIGIN & MANUFACTURE: 7.装运时间:TIME OF SHIPMENT: 8.装运口岸:PORT OF LOADING: 9.目的口岸:PORT OF DESTINATION: 10.装运唛头:SHIPPING MARKS 11.付款条件:Terms of Payment A. 买方于装运时间前天通过银行开出以卖方为受益人的不可撤销的信用证,卖方在装船启运后凭本合同条款12所列单据在开证银行已付货款。信用证有效期为装船后15天截止。 A. days prior to the time shipment, the Buyer shall open with the Bank of , an irrevocable Letter of Credit in favour of the Seller payable at the issuing Bank against presentation of the shipping documents as stipulated under Clause 12 of this Contract after departure of the carrying vessel. The said Letter of Credit shall remain in force till the 15th days after shipment. B. L/C AT SIGHT 见票即付信用证(或者根据实际情况改为TT) 12.装运单据Shipping Documents: DETAILED IN THE L/C 按信用证所列 13.延期交货及罚款:除不可抗拒原因外,如卖方不能如期交货,买方有权撤销或解除该订单,或经买方同意在卖方缴纳罚款的条件下延期交货。买方可同意给予卖方天优惠期。每迟延一天卖方需向买方支付订单总价款%的违约金。罚款自第天起计算。 Delayed Delivery and Penalty: Should the Sellers fail to effect delivery on time as stipulated in this Order owing to causes other than Force Majeure as provided for in Clause 11 of this Order, the Buyers shall have the right to cancel or terminate the order .The Sellers may, with the Buyers’consent, postpone delivery on payment of penalty to the Buyers. The Buyers may agree to grant the Sellers a grace period of days. Delay each day, the Seller need to pay % of the price (the compensation)to the Buyer. Penalty shall be calculated from the 16th day. 13、仲裁:凡因本合同引起的或与本合同有关的任何争议,均应提交中国国际经济贸易仲裁委员会天津国际经济金融仲裁中心,按照申请仲裁时该会现行有效的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。 Arbitration: Any dispute arising from or in connection with this CONTRACT shall be submitted to CIETAC Tianjin International Economic and Financial Arbitration Center for arbitration which shall be conducted in accordance with the Commission’s arbitration rules in effect at the time of applying for arbitration. The arbitral awards is final and binding upon all parties 。 14. 商检条款INSPECTION:

相关主题