当前位置:文档之家› 装修合同样本英文版

装修合同样本英文版

(Contract No. 09041205)

Presentation

This contract is based on the "Contract Law" Construction of "construction management decoration" ,combining Shenzhen Decoration Association has developed the 2003 edition of the contract and I Division actual operation of the development.

(Contract No. 09041205)Decoration repair project turn-key contract

Contract by: (hereinafter referred to as Party A)

Name: xx Shenzhen branch office attached ID card or fill out a copy of identity card number

Is home Address:

Address:

Identity card number : _______________

Phone :___ _888xxxxx________________________________________ Contractor: Shenzhen Shuo Code Decoration Design Engineering Co., Ltd. (hereinafter referred to as Party B)

In accordance with the "Contract Law of People's Republic of China", "construction and installation works contract regulations" and relevant laws, regulations, combined with the actual situation of the project, the two sides of equality, voluntary, consensus based on the agreement reached as follows:

A project overview

1.1 Project title :

1.2 site :

1.3 Contractor : this contract annex "project budget"

1.4 Contract means: The two sides agreed to adopt the following resolution means kinds of contract

1 Before packet materials Part of the contracting-included 3 Before not-included

1.5 Period:

Start date: tentative on since _ years from the date (the actual calculation to B on the that the construction plan and budget for the book from start to the day after the period) 1.6 Completion date :_ __The total duration for the day (as a result

1.7 contract price (RMB capital): )

¥(A project budget book)

2、Working Party

2.1Party in the pre-___ days, Party B shall provide construction drawings have been identified sets of ___ (__ copies of notes or practice), and B-site transfer.

2.2 for the construction involved in a variety of applications, documents and other formalities required for the construction of Party B to provide water, electricity and coordinate with relevant departments to do a good job access, elevators, fire fighting equipment and protection.

2.3 to remove the impact of the construction of the barrier, only

(Contract No. 09041205)partially cleared of housing in the remaining furniture, furnishings and other protective measures.

2.4 assigned to _______ for the site on behalf of Party A, is responsible for project quality and progress of the supervision and inspection for acceptance, change, registration procedures and other matters.

2.5If they really need to remove the structural transformation of the original buildings or equipment pipelines, Party A is responsible to the appropriate departments for examination and approval procedures.

2.6 is responsible for protecting the surrounding buildings and renovation, equipment, pipelines, and other green spaces are not damaged, and bear the corresponding costs.

2.7 Coordination of the relevant departments to do a good job defending the scene, fire, waste disposal, etc., and bear the corresponding costs.

2.8 notify the neighborhood during the construction dust and noise generated by the possibility of living and working environment impact to understand the coordination of relations and assume responsibility. GM 2.9 gas, cable broadband networks to be working with the departments concerned with the construction of Party.

3、B work

3.1 By Party B is responsible for the design of the project, Party B provide the main part of the effect of plan design, floor plan, water and electricity reform plan, layout of smallpox, laying the ground work plans and other drawings. And organized practice that the construction drawings or site transfer. By the Party responsible for the design of the project, to participate in the construction of Party organizations, or the practice of drawing the scene described the handover.

3.2 assigned to ______ for the B-site representatives, responsible for the fulfillment of the contract, as required, organize construction work, quality and quantity on schedule to complete the construction tasks, from Party B is responsible for settlement of various matters.

3.3 Party A direct contracting of other projects, Party B is obliged to work with other construction to ensure the quality of the project and the successful completion of the project.

3.4 to comply with state or local governments and relevant departments of the construction site management, and properly protect the construction site around the buildings, pipelines and other equipment from damage, the construction site to do a good job defending and rubbish removal, etc., deal with construction due to bring cause inconvenience to the people and with the surrounding units (households) relationship.

3.5 Construction of the relevant departments without the consent or approval of Party A are not free to Removal of the transformation

the original building structure and pipeline equipment. Party without the consent of the original B Removal of the transformation unauthorized building structures or equipment pipeline, which took place caused by loss or incident (including fines), by Party B is responsible for and bear the loss.

3.6 Party B in the course of construction should be kept under safe custody at the scene Party stacked furniture, furnishings, as well as finished works, works are not completed prior to the transfer of Party

(Contract No. 09041205)

A is responsible for all on-site facilities and work product protection.

3.7 Party B is not in accordance with engineering specifications and environmental requirements of the environmental pollution caused by the decoration, Party B has the responsibility of governance.

3.8 Construction of the strict implementation of norms, safety practices, fire safety requirements, environmental protection requirements. In strict accordance with the drawings or construction practices that do

a good jo

b of quality control records.

3.9 to participate in the completion of acceptance.

4、Period

4.1 Party than the construction contract is completed ahead of schedule when conditions permit should be agreed with the consent of Party B and Party B shall pay to speed up the works because of the cost of the measures adopted.

4.2 Party A does not affect the project agreement to complete its work, the extended period.

4.3 Due to changes in project design or increase the volume, resulting in project delays, project postponed.

4.4 Party A failure to provide material or layer is not timely inspection section and the delay caused by suspension, extended period.

4.5 Party A responsible person at the scene is incorrect instructions, resulting in downtime or rework, extended period. And bear the corresponding costs.

4.6 Party A does not meet the project contract, progress payments, resulting in suspension or loss of working time, time limit extended.

4.7 due to the responsibility of Party B, resulting in suspension or loss of working time, time limit is not extended.

4.8 The causes of non-B power, water, gas and force to stop factors, led to downtime or loss of working time, time limit extended.

5、Project quality and acceptance

5.1 Assessment of the quality of the project is based on acceptance criteria:

(1) the construction drawings, the practice shows that design changes;

(2) "the quality of building decoration projects accepted norms" (GB50210-2007);

5.2 Project Acceptance Project: Infrastructure Improvement Project, water and electricity reconstruction project line (before the closure), water projects (before the laying of tiles),

Ceiling project (before paint), doors and windows projects (before paint), small wood projects (before painting);

5.3 as a result of Party A to provide the materials, equipment failure and affect the quality of quality of construction rework postponed, due to quality problems caused by construction B rework and rework costs by Party B of its commitment.

5.4 Party A case of direct cross-contract engineering operations, Party

B and Party A construction contract to a direct response to the quality of the project is responsible for their own, if quality problems occur, from the responsibility of the party.

5.5 After completion of the project, Party B shall notify Party

(Contract No. 09041205)acceptance, notify the Party since the days of receipt of acceptance of organizational acceptance, and acceptance process, the transfer procedures. If Party A agreed period of time in organizational acceptance can not be promptly notify Party B, and the other will be the date of acceptance. (Such as Party in the agreed period of time could not be organized inspection, and failed to put forward amendments to the report as final acceptance has been approved by the quality of the project as a qualified settlement procedures should be handled.

5.6 After completion of the project, without the acceptance of unauthorized use of Party A, Party A as a qualified acceptance.

5.7 Acceptance of qualified projects, the two sides to sign; deadline correction failed projects, a separate inspection

6、Price and settlement projects

6.1 The two sides agreed to adopt the contract price set by budget line item for a total amount of packets (

6.2 both by country and city competent authorities of the existing provisions, the contract takes effect, Party A press table B agreed to pay in four phases to the project, a one-time settlement of balance due.

6.3 After completion of the project, acceptance, Party B and the balance sheet to provide project information to the Party concerned. Party receiving the above information the test can be completed within three days, due no objections were made as agreed, and within three days in

6.5 Party A Party B to pay progress payments (including payment in advance, progress, clearing), to transfer or cash payment. The form of a cash payment to belong to the Finance Department B contributions; If there are special circumstances chosen not

(Contract No. 09041205)

to the Finance Department B contributions. buyer must be delivered to the amount of financial B representatives. B financial representatives should produce documentary evidence of B Company for the Finance receivables clients. B representatives to provide financial documents to be impressed with the company's financial B chapter.

6.6Party A Party B, without the written consent of the Ministry of Finance (or companies produce written proof to the Finance receivables client), and reference works for

a company staff caused by the loss of buyer pays.

6.7 B without the consent of the chosen not to pay for the B private construction projects increased personnel arrangements, Otherwise, the quality of all the issues covered by the buyer pays, B right to all projects without any quality of underwriting, cancellation of the project all quality warranty.

7、Liability for breach of contract

7.1 Party A or Party B did not agree the content of the terms of the agreement to fulfill its contractual obligations resulting in inability to perform, should bear the corresponding liability for breach of contract.

7.2 Party A causes as a result of lay-off half-way, Party A shall compensate Party B due to work stoppage, loss of working time losses caused by.

7.3 Party A construction site before delivery, Party A Party B should provide the proper protection equipment and in-situ piling up the furniture, furnishings and engineering products, such as the loss shall be the compensation price.

8、Warranty

8.1Maintenance responsibility of the project: B-included contracting leakproofness waterproof construction projects for the 2-year warranty, and other B-included construction contracting projects for the 1 year warranty.

8.2B range of warranty packages contracting construction projects is expected 8.3As a result of Party A to provide the quality of the materials, man-made damage and damage caused by force majeure is not within the scope of warranty.

9、Controversial

9.1 In carrying out the contract period, both the event of a dispute, without prejudice to the progress of the works under the premise, the two sides can be taken to consultation.

9.2 Consultative Association, not by acts of conciliation;

9.3 The parties do not want to through consultation, conciliation or mediation fails, the two sides choose to settle any of the following: □ to the Shenzhen Arbitration Committee for arbitration:

□ to the Shenzhen City (district) people's court.

10, lifting and termination of contract

(Contract No. 09041205)10.1, one of the following situations, you can cancel the contract:

(1) B by mutual agreement;

(2) due to force majeure resulting in inability to perform the contract;

(3) breach of contract resulted in a party can not fulfill the contract.

10.2 Party A balance due paid work, the key to the return of Party B to Party A at the scene, this contract shall cease.

11, Supplementary Provisions

11.1 The original contract the two sides of a split. Copies of copies, they were Party, they were B. Have the same legal force.

Annex 11.2

(1) construction drawings

(2) project budget book

Contract : Contractors :

Letting representatives : The contractor representatives :

Telephone : Telephone :

Fax : Fax :

B

装饰装修合同书(标准版)

Both parties jointly acknowledge and abide by their responsibilities and obligations and reach an agreed result. 甲方:___________________ 乙方:___________________ 时间:___________________ 装饰装修合同书

编号:FS-DY-20204 装饰装修合同书 发包方(甲方): 承包方(乙方): 合同编号: 北京市工商行政管理局监制 XX年三月修订 使用说明 1、本市行政区域内的家庭居室装饰装修工程适用此合同文本。此版合同文本适用期至新版合同文本发布时止。 2、工程承包方(乙方),应当具备工商行政管理部门核发的营业执照,和建设行政主管部门核发的建筑业企业资质证书。 3、甲、乙双方当事人直接签订此合同的,应当一式两份,合同双方各执一份;凡在本市各市场内签订此合同的,应当一式三份(甲、乙双方及市场主办单位各执一份)。

4、开工:双方通过设计方案、首期工程款到位、工程技术交底等前期工作完成后,材料、施工人员到达施工现场开始运作视为开工。 5、竣工:合同约定的工程内容(含室内空气质量检测)全部完成,经承包方、监理单位、发包方验收合格视为竣工。 6、验收合格:承包方、监理单位、发包方在《工程竣工验收单》上签字盖章或虽未办理验收手续但发包方已入住使用的,均视为验收合格。 7、工期顺延:是指非因乙方的责任导致工程进度受到影响后,工程期限予以相应延展。在工期顺延的情况下,乙方不承担违约责任。 粘贴印花税票处 北京市家庭居室装饰装修工程施工合同协议条款 发包方(以下简称甲方): 委托代理人(姓名):民族: 住所:身份证号: 联系电话:手机号: 承包方(以下简称乙方):

简单装修合同样本(精华版

房屋装修合同 发包方(简称甲方):_________________________ 承包方(简称乙方):_________________________ 甲乙双方经友好协商,甲方决定委托乙方进行装修,为保护双方的合法权益,结合本工程的具体情况,双方达成如下协议,共同遵守。 一、工程概况 1. 装饰施工地点: 2. 装饰施工内容:详见附件 3. 承包方式:包工包料。 4. 工期:自: ___ 年___月____日开工,至___年___月_ _日竣工,工期___天。逾期竣工的按照200元人民币每天赔偿。 二、工程价款及结算的约定 1.工程总价款:元,大写(人民币):。 2.工程款付款方式按下列方式支付: (1)第一次,对预算设计认可,签订合同之日,支付工程总造价30% 合计元 (2)第二次竣工验收当天支付工程总造价70% 合计_________元 (4)工程质量保修期1年。保修期从竣工验收签章之日起算。 三、关于材料供应与装修过程的约定 1、乙方供应的材料、设备,如不符合质量要求或规格有差异,应禁止使用。如乙方提供的材料、设备发生质量问题或规格差异,由此造成工程损失的,责任由乙方承担。 2、在施工过程中,甲方提出设计修改意见及增减工程项目时须提前与乙方联系,双方同意后,方能进行该项目的施工.由此影响竣工日期,甲、乙双方商定。 3、乙方在施工中应采取必要的安全防护和消防措施,保障作业人员及相邻居民的安全,防止管道堵塞、渗漏水、停电、物品毁坏等事故发生。如遇上述情况发生,属甲方责任,甲方负责和赔偿;属于乙方责任的,乙方负责修复和赔偿。 4、乙方参加甲方组织的施工图纸或做法说明的现场交底。按要求组织施工,保质保量、按期完成施工任务,解决由乙方负责的各项事宜,对其行为乙方应予认可。未经甲方同意和所在地房管或物业管理部门批准,不得随意拆改原有建筑承重结构及各种共用设备管线。 四、纠纷处理方式 双方如对合同执行发生争议,应通过友好协商解决,如协商无效的,可以提交人民法院诉讼。 五、合同经双方签字生效后,双方必须严格遵守。 六、本合同一式二份,甲、乙双方各执一份,具有同等法律效力。合同附件为本合

办公室装修合同范本(完整版)

合同编号:YT-FS-8912-61 办公室装修合同范本(完 整版) Clarify Each Clause Under The Cooperation Framework, And Formulate It According To The Agreement Reached By The Parties Through Consensus, Which Is Legally Binding On The Parties. 互惠互利共同繁荣 Mutual Benefit And Common Prosperity

办公室装修合同范本(完整版) 备注:该合同书文本主要阐明合作框架下每个条款,并根据当事人一致协商达成协议,同时也明确各方的权利和义务,对当事人具有法律约束力而制定。文档可根据实际情况进行修改和使用。 甲方:(以下简称甲方)装修单位 乙方:(以下简称乙方)某某公司 依照《中华人民共和国经济合同法》及国家建设部、省市建委对建筑装饰工程的有关规定,经双方协商签定合同如下: 一、工程概况及承包方式 1、工程名称: 2、工程地点: 3、工程承包方式:包工包料 4、工程概况:建筑面积平方米。 二、工程装修内容 综合楼室内棚面、墙面、地面、电气等装饰工程 三、工程造价 工程造价以施工图纸、甲方的使用要求及设计要

求为依据; 工程造价为:¥元。(以甲方认定的单价为准,工程量竣工后以审计为准) 四、工程期限 工程开工日期:20 年月日 工程竣工日期: 20年月日 五、质量要求 按国家建设部行业标准jgj73—91《建筑装饰工程施工验收规范》规定,及省、市建委、消防部门规定的标准执行,工程质量达到市优。工程竣工后如出现质量问题(竣工后甲方使用,人为造成的质量问题除外),属于乙方责任的,乙方无偿保修,保修期为一年,终身维修。办公室装修合同范本 六、付款方式 1、合同签定后,甲方即付给乙方工程款总造价的 2、工程进展一半时,甲方即付给乙方工程款总造价的 3、工程竣工验收合格后,甲方即付给乙方工程款

2020最新室内装修合同样本电子版

编号:HL202075850 2020最新室内装修合同样本电子版 The content of this contract is only a reference for both parties. You must read the listed terms carefully when using it. The content of the contract will be adjusted according to the actual situation of both parties and should not be directly applied. 甲方:_______________________ 乙方:_______________________ 签订日期:_____年____月_____日

最新室内装修合同 委托方(以下简称甲方): 承接方(以下简称乙方): 依照《中华人民共和国合同法》及其他有关法律、法规的规定,甲、乙双 方在平等、自愿、协商一致的基础上,就乙方承包甲方的居室室内装饰工程(以下简称工程)的有关事项,达成以下协议: 第一条:工程概况 1、工程地址: 2、户型(详见施工图)。 3、施工项目量:详见本合同附件《装饰工程预算书》。发生工程量变更的,以实际工程量为准。 4、工程承包方式,双方商定采取下列第种承包方式: (1)乙方包工包料; (2)乙方只包工(甲方提供全部材料); (3)乙方部分包料及全包工; 5、工程期限个工作日(以乙方工作人员工作日为标准)。开工日期: ________年____月____日,竣工日期:________年____月____日(注:工期顺

简单家庭装修合同样本(完整版)_1

合同编号:YT-FS-7337-42 简单家庭装修合同样本 (完整版) Clarify Each Clause Under The Cooperation Framework, And Formulate It According To The Agreement Reached By The Parties Through Consensus, Which Is Legally Binding On The Parties. 互惠互利共同繁荣 Mutual Benefit And Common Prosperity

简单家庭装修合同样本(完整版) 备注:该合同书文本主要阐明合作框架下每个条款,并根据当事人一致协商达成协议,同时也明确各方的权利和义务,对当事人具有法律约束力而制定。文档可根据实际情况进行修改和使用。 【篇一】 甲方:____ 乙方:____ 为装修房屋,经双方协商,订立本协议,以共同 恪守。 一、工程项目 1、三个房间(两卧室、一客厅,以下简称三个房 间)打地角线,包暖气及管线(客厅要对称),房顶四 周打石膏线,包三个房间的门、窗;客厅、卧室铺强 化木地板;清除所有房间原有涂料,客厅、卧室打腻 子,刷漆两次。 2、通阳台的门窗处打一吧台,上方根据甲方要求 (图纸)做一置物架;阳台东侧打一多用途柜(底下 放鞋、上面书柜)、西侧打一吊柜,包阳台、铺磁砖、

吊pvc板。 3、卫生间、洗脸间、厨房铺磁砖到顶,屋顶吊pvc 板;厨房地面铺磁砖,打一灶台。 4、房间电源线路根据甲方要求适当调整,客厅门后一多用途柜(底下放鞋,上面挂衣服)。 5、未尽细节的之处,由甲方提出方案,商量确定。 二、承包方式 甲方按乙方要求必须保证装修期间的所需材料(乙方需提前通知甲方),乙方负责施工。 三、质量标准 施工质量要符合安全要求,装修质量不得低于同一施工类型的装修标准,双方认可。 四、施工期限 ____年____月____日至____年____月____日,如不能按期完成,每天将处罚金____。 五、工程造价 材料由甲方提供,甲方只支付乙方装修人工费____人民币。

办公室装修合同范本

办公室装修合同 委托方(甲方):广州大为会计师事务所有限公司 承接方(乙方):广州市树丰机电设备安装有限公司 甲、乙双方经友好洽谈与协商,甲方决定委托乙方进行办公室装修。为保证工程顺利进行,根据国家有关法律规定,特签订本合同,以便共同遵守。 第一条:工程概况 1、工程地址:越秀区白云路22号嘉星广场A区2306室。 2、总计施工面积180平方米。 3、施工内容:详见本合同附件(一)《装潢施工内容单》与施工图。 4、委托方式:包工包料大包干工程。 5、开工日期:2015年5月10日,竣工日期2015年6月10日,工程总天数:30天。 第二条:工程价款 工程价款(金额大写) 肆万捌仟元整,详见本合同附件(一)《装潢工程材料预算表》。 第三条:质量要求 1、工程使用主要材料的品种、规格、名称,经双方认可。 2、工程验收标准,双方同意参照国家的相关规定执行。 3、施工中,甲方如有特殊施工项目或特殊质量要求,双方应确认,增加的费用,应另签订补充合同。 4、凡由甲方自行采购的材料、设备,产品质量由甲方自负;施工质量由乙方负责。 5、甲方如自聘工程监理,须在工程开工前通知乙方,以便于工作衔接。 第四条:材料供应 1、乙方须严格按照国家有关价格条例规定,对本合同中所用材料一律实行明码标价。甲方所提供的材料均应用于本合同规定的装潢工程,非经甲方同意,不得挪作她用。乙方如挪作她用,应按挪用材料的双倍价款补偿给甲方。

2、乙方提供的材料、设备如不符合质量要求,或规格有差异,应禁止使用。如已使用,对工程造成的损失均由乙方负责。 3、甲方负责采购供应的材料、设备,应该就是符合设计要求的合格产品,并应按时供应到现场。如延期到达,施工期顺延,并按延误工期处罚。按甲方提供的材料合计金额的10 %作为管理费支付给乙方。材料经乙方验收后,由乙方负责保管,由于保管不当而造成损失,由乙方负责赔偿。 第五条:付款方式 1、合同一经签订,甲方即应付100%工程材料款与施工工费的50 %;当工期进度过半(2015年5月25日),甲方即第二次付施工工费的40 %。剩余10 %尾款待甲方对工程竣工验收后结算。(注:施工工费包括人工费)。 甲方在应付款日期不付款就是违约行为,乙方有权停止施工。验收合格未结清工程价款时,不得交付使用。 第六条:工程工期 1、如果因乙方原因而延迟完工,每日按工费的1%作为违约金罚款支付给甲方,直至工费扣完为止。如果因甲方原因而延迟完工,每延迟一日,以装潢工程价款中人工费的1%作为误工费支付给乙方。 2、由甲方自行挑选的材料、设备,因质量不合格而影响工程质量与工期,其返工费由甲方承担,由于乙方施工原因造成质量事故,其返工费用由乙方承担,工期不变。 3、在施工中,因工程质量问题、双方意见不一而造成停工,均不按误工或延迟工期论处,双方应主动要求有关部门调解或仲裁部门协调、处理,尽快解决纠纷,以继续施工。 第七条:其她事项 1、甲方责任 1 )必须提供经物业管理部门认可的房屋平面图及水、电、气线路图,或由甲方提供房屋平面图及水、电、气线路图,并向乙方进行现场交底。 2 )二次装饰工程,应全部腾空或部分腾空房屋,清除影响施工的障碍物。对只能部分腾空的房屋中所滞留的家具、陈设物等,须采取必要的保护措施,均需与乙方办理手续与承担费用。 2、乙方责任 1 )指派一名工作人员为乙方工地代表,负责合同履行,并按合同要求组织施工,保质保量地

简单装修合同模板(标准版)

编号:GR-WR-59686 简单装修合同模板(标准 版) After negotiation and consultation, both parties jointly recognize and abide by their responsibilities and obligations, and elaborate the agreed commitment results within the specified time. 甲方:____________________ 乙方:____________________ 签订时间:____________________ 本文档下载后可任意修改

简单装修合同模板(标准版) 备注:本合同书适用于约定双方经过谈判、协商而共同承认、共同遵守的责任与义务,同时阐述确定的时间内达成约定的承诺结果。文档可直接下载或修改,使用时请详细阅读内容。 委托方(甲方): 承接方(乙方): 工程项目: 甲、乙双方经友好洽谈和协商,甲方决定委托乙方进行居室装潢。为保证工程顺利进行,根据国家有关法律规定,特签订本合同(包括本合同附件和所有补充合同),以便共同遵守。 第一条:工程概况 1.工程地址:___________ 2.居室规格:房型______层(式)______室______厅______厨______卫 1、______室,计______平方米; 2、______厅,计______平方米; 3、______厨房,计______平方米;

4、______卫生间,计______平方米; 5、______阳台,计______平方米; 6、_____过道,计______平方米; 7、其他(注明部位)______,计_____平方米。 总计:施工面积______平方米。 3.施工内容:详见本合同附件(一)《家庭装潢施工内容单》和施工图。 4.委托方式:______________ 5.工程开工日期:______年______月______日 6.工程竣工日期:______年______月______日 工程总天数:_____天 第二条:工程价款 工程价款(金额大写)_______元,详见本合同附件(二)《家庭装潢工程材料预算表》。 1、材料款_______元; 2、人工费_______元; 3、设计费_______元; 4、施工清运费_______元; 5、搬卸费_______元; 6、管理费_______元; 7、税金(3.41%)_____元;

家装合同样本(标准版)

编号:GR-WR-71470 家装合同样本(标准版) After negotiation and consultation, both parties jointly recognize and abide by their responsibilities and obligations, and elaborate the agreed commitment results within the specified time. 甲方:____________________ 乙方:____________________ 签订时间:____________________ 本文档下载后可任意修改

家装合同样本(标准版) 备注:本合同书适用于约定双方经过谈判、协商而共同承认、共同遵守的责任与义务,同时阐述确定的时间内达成约定的承诺结果。文档可直接下载或修改,使用时请详细阅读内容。 家装合同样本(一) 委托方(甲方):_____ 承接方(乙方):_____ 甲、乙双方经友好洽谈和协商,甲方决定委托乙方房屋进行地砖、墙砖铺设,订立本协议,以共同恪守。 一、工程地点:____区____街____单元____室 二、形式结构:____层式____室____厅____厨____卫 三、工程项目: 四个房间(两卧室、两客厅)地面铺设80*80瓷砖,打地角线,要求平整;一个厨房,一个卫生间墙面25*40铺瓷到顶,留出吊顶空间,边角打磨,地面铺30*30瓷砖,要求平整;两个阳台地面铺设30*30瓷砖,要求平整。 未尽细节的之处,由甲方提出方案,商量确定。 四、承包方式:甲方按乙方要求必须保证装修期间的所需材料(乙方需提前通知甲方),和施工期间的午餐供应,乙

简单装修合同样本二(官方版)

编号:QJ-HT-0291 简单装修合同样本二(官方 版) Both parties shall perform their obligations as agreed in the contract or in accordance with the law within the term of the contract. 甲方:_____________________ 乙方:_____________________ 日期:_____________________ --- 专业合同范本系列下载即可用---

简单装修合同样本二(官方版) 说明:该合同书适用于甲乙双方为明确各自的权利和义务,经友好协商双方同意签署合同,在合同期限内按照合同约定或者依照法律规定履行义务,可下载收藏或打印使用(使用时请先阅读条款是否适用)。 发包方(简称甲方):_________________________ 承包方(简称乙方):_________________________ 甲乙双方经友好协商,甲方决定委托乙方进行住房装修,为保护双方的合法权益,结合本工程的具体情况,双方达成如下协议,共同遵守。 一、工程概况 1.装饰施工地点: 2.住房结构:房型房厅套,施工面积平方米。 3.装饰施工内容:详见附件一《装饰施工内容表》。 4.承包方式:________(包工包料、清包工、部分承包)。 5.工期:自________年________月________日开工,至________年________月________日竣工,________工期________天。 二、工程价款及结算的约定

办公室装修合同模板

办公室装修合同模板 随着法律知识的普及,合同的用途越来越广泛,签订合同可以使我们的合法权益得到法律的保障。那么我们拟定合同的时候需要注意什么问题呢?下面是为大家收集的办公室装修合同模板,希望能够帮助到大家。 办公室装修合同模板1 甲方:(以下简称甲方) 乙方:(以下简称乙方) 依照《经济合同法》及国家建设部、省市建委对建筑装饰工程的有关规定,经双方协商签定合同如下: 一、工程概况及承包方式 1、工程名称: 2、工程地点: 3、工程承包方式:包工包料 4、工程概况:建筑面积平方米。 二、工程装修内容 综合楼室内棚面、墙面、地面、电气等装饰工程 三、工程造价 工程造价以施工图纸、甲方的使用要求及设计要求为依据; 工程造价为:¥元。(以甲方认定的单价为准,工程量竣工后以

审计为准) 四、工程期限 工程开工日期:年月日 工程竣工日期:年月日 五、质量要求 按国家建设部行业标准JGJ73—91《建筑装饰工程施工验收规范》规定,及省、市建委、消防部门规定的标准执行,工程质量达到市优。工程竣工后如出现质量问题(竣工后甲方使用,人为造成的质量问题除外),属于乙方责任的,乙方无偿保修,保修期为一年,终身维修。办公室装修合同范本 六、付款方式 1、合同签定后,甲方即付给乙方工程款总造价的 2、工程进展一半时,甲方即付给乙方工程款总造价的 3、工程竣工验收合格后,甲方即付给乙方工程款总造价的 4、乙方剩余工程款作为质保金内付清。 七、双方责任 1、甲方:负责提供整个工程的使用、设计要求;提供现场使用的水、电位置;提供材料运输通道、必要的材料堆放场地及原楼的设计图纸;对装修工程所涉及的配电系统、管道系统、给排水总阀位置应负责指明;施工场地要平整。 2、乙方:向甲方提供工程装饰施工设计图纸及工程报价。 八、其它事宜

包工包料装修合同范本简单版

委托方(甲方):________ 承接方(乙方):________ 住所地址:__________________________ :________________________ :______________________________ 住所地址:__________________________ :________________________ :______________________________ 工程项目:__________________________ 甲、乙双方经友好洽谈和协商,甲方决定委托乙方进行居室装潢(装修)。为保证工程顺利进行,根据国家有关法律规定,特签订本合同,以便共同遵守。 第一条:工程概况 1. 工程地址:________________________________________________ 2. 居室规格:____ 室____ 厅____ 厨____ 卫,施工建筑面积____平方米。 3. 委托方式:包工包料(除防盗门、灯具、地板材料费外) 4.工程价款(金额大写):________________元整,该工程价款包括合同第三条中所列明的工程材料款,装潢过程中的全部人工费、搬卸费、装潢垃圾清理费等。(备注:所有与装潢相关的人工费用和工程材料费用,均由乙方承担。如在施工工程中,乙方提出其他费用支付要求,甲方均有权拒绝支付。若乙方以此为由拖延施工,甲方有权终止合同并追究相关违约责任。) 5. 工程开工日期:_______年_______月_______日 6. 工程竣工日期:_______年_______月_______日工程总天数:______天 第二条:施工容 1.客厅:鞋柜一个、客厅推出、做石膏线、吊顶、做塑钢窗、安装四个插座和两个开关。 2.主卧:衣柜一个(带梭门)加吊柜、阳台衣柜一个(带梭门)加吊柜、床头柜两个、做石膏线、安装六个插座和两个开关。 3.次卧:衣柜一个(带梭门)加吊柜、主卧次卧之间做隔断立新墙、做塑钢飘窗、飘窗改成电脑桌加书柜一个、床头柜两个、做石膏线、安装四个插座和两个开关。 4.厨房:下水改造、贴墙砖、地砖、订做整体橱柜、推出无烟灶台、安装排风扇、安过石门、吊顶(铝扣板)、安装菜盆、混水阀、案

标准商铺装修合同范本(官方版)

编号:QJ-HT-0815 标准商铺装修合同范本(官 方版) Both parties shall perform their obligations as agreed in the contract or in accordance with the law within the term of the contract. 甲方:_____________________ 乙方:_____________________ 日期:_____________________ --- 专业合同范本系列下载即可用---

标准商铺装修合同范本(官方版) 说明:该合同书适用于甲乙双方为明确各自的权利和义务,经友好协商双方同意签署合同,在合同期限内按照合同约定或者依照法律规定履行义务,可下载收藏或打印使用(使用时请先阅读条款是否适用)。 发包人(甲方): 承包人(乙方): 依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方就本建设工程施工项协商一致,订立本合同,以资守信。 第一条工程概况 1、工程名称: 2、工程地点: 3、工程量:以合同预算表为准,发生工程量变更的以实际工程量为准。 4、承包方式按以下第项执行 (1)包工包料(2)包工不包料(3)包工;部分包料(4)包料;部分包工 第二条工期

1、开工日期:________年____月____日 2、竣工日期:________年____月____日 3、工程总用工时间:天(工期顺延的时间未计入) 第三条工程价款 本工程总造价为:(大写)(人民币) ¥:元 注:此价款为工程结算依据,最终要按实际发生的工程量计算 第四条工程质量 本工程质量按以下第执行 (1)国家标准(2)地方标准(3)行业通用标准(4)甲方特殊标准 第五条图纸 1、经双方协商一致决定,采用以下第项执行 (1)甲方委托乙方设计施工图纸,设计费用为(大写):元,图纸设计费用不包含在工程总价款内; (2)甲方自行提供施工图纸 2、图纸会审和设计交底时间:

简单装修合同样本(精华版)

房屋装修合同 发包方(简称甲方):____________________________ 承包方(简称乙方):____________________________ 甲乙双方经友好协商,甲方决定委托乙方进行装修,为保护双方的合法权益,结合本工程的具体情况,双方达成如下协议,共同遵守。 一、工程概况 1.装饰施工地点: ________________ 2.装饰施工内容: ________________ 3.承包方式:包工包料。 4.工期:自: ___ 年______ 月 ____ 日开工,至 _______ 年—月—日竣工,工期一天。 逾期竣工的按照租金均价__________ 元人民币每天赔偿。 二、工程价款及结算的约定 1.工程总价款:Y 万元,大写(人民币):万元详见本合同装修附件。 2.工程款付款方式按下列方式支付: (1,签订合同之日,支付工程合计元 (3)第三次竣工后30天内工程无质量问题,剩于10%甲方支付乙方合计_______ 元 (4)工程质量保修期1年。保修期从竣工验收签章之日起算。 三、关于材料供应与装修过程的约定 1、乙方供应的材料、设备,如不符合质量要求或规格有差异,应禁止使用。如乙方提供的材料、设备发生质量问题或规格差异,由此造成工程损失的,责任由乙方承担。 2、在施工过程中,甲方提出设计修改意见及增减工程项目时须提前与乙方联系,双方同意后, 方能进行该项目的施工. 由此影响竣工日期,甲、乙双方商定。 3、乙方参加甲方组织的施工图纸或做法说明的现场交底。按要求组织施工,保质保量、按期完成施工任务,解决由乙方负责的各项事宜,对其行为乙方应予认可。未经甲方同意和所在地房管或物业管理部门批准,不得随意拆改原有建筑承重结构及各种共用设备管线。 四、纠纷处理方式 双方如对合同执行发生争议,应通过友好协商解决,如协商无效的,可以提交人民法院诉讼。 五、合同经双方签字生效后,双方必须严格遵守。

办公室装修合同样本

办公室装修合同样本 发包人:甲方 承包人:乙方 依照《中华人民共和国合同法》、《中华人民共和国建筑法》及 其它有关法律、行政法规、遵循平等、自愿、公平和诚实信用的原则,双方就本建设工程施工事项协商一致,订立本合同。 第一条:工程概况 1、工程名称:办公室装饰 2、工程地点: 3、工程范围:室内装修(见预算清单) 4、工程承包方式:本工程采用半包工包料方式承担(参见附件 清单) 5、工程造价 ⑴工程预算总造价为Y 元,大写人民币:元整。 ⑵本工程总造价计算依据 A、以工程设计施工图纸及设计变更、现场签证为依据。 B、施工中甲、乙双方确认的施工障碍引起的变更或增加措施等 费用。 C、施工中甲乙要求新增加的项目费用。 第二条工程期限 1、经甲、乙双方确定:本工程合同工期为______________ 天(日历),具

体开发时间以甲乙双方签订的开工报告为准。 2、本工程计划开工日期为___________ 年_____ 月 ____ 日,计划竣工日 期为____ 年_月_日。 3、本工程在施工过程中,如遇下列情况,可顺延工期。 (1)由于不可抗力造成无法正常施工的; (2)由于甲方原因影响连续施工的(包括工程付款不到位)。 (3)由于设计变更或设计未确定的。 (4)由于未办妥相关物业或行政审批手续的。 (5)由于施工工地(非乙方原因)一月内停电停水停气造成停工累计超过8小时; (6)由于甲方原因不能及时配套或配套单位不能配合而影响施工的。 第三条工程施工准备与双方责任 1、甲方责任 (1)开工前甲方协调各方面的关系,办妥进场手续,甲方承担进场手续费用。 (2)组织好设计交底及图纸会审工作。 (3)委托为甲方代表,实行工程质量、进度监理,代表甲方处理工程日常事宜。 (4)开工前1天,甲方腾空装饰场地以便工程开工。 (5)做好甲方提供材料及设备的供应;落实建设资金,按期报付工程预付款,办理现场签证,竣工验收。 2、乙方责任 (1)提供完整的施工图纸及施工技术资料。

居室装修合同范本(标准版).docx

编号:_________________ 居室装修合同范本 甲方:________________________________________________ 乙方:________________________________________________ 签订日期:_________年______月______日

委托方(甲方):________ 承接方(乙方):________ 工程项目:________ 甲、乙双方经友好洽谈和协商,甲方决定委托乙方进行居室装潢。为保证工程顺利进行,根据国家有关法律规定,特签订本合同(包括本合同附件和所有补充合同),以便共同遵守。 第一条:工程概况 1、工程地址:___________________________________ 2、居室规格:房型______层(式)______室______厅______厨______卫 (1)______室,计______平方米; (2)______厅,计______平方米; (3)______厨房,计______平方米;

(4)______卫生间,计______平方米; (5)______阳台,计______平方米; (6)________过道,计______平方米; 3、其他(注明部位)____________,计________平方米。 总计:施工面积____________平方米。 4、施工内容:详见本合同附件(一)《家庭装潢施工内容单》和施工图。 5、委托方式:____________________________________________ 6、工程开工日期:________年____月____日 7、工程竣工日期:________年____月____日 工程总天数:________天 第二条:工程价款

个人装修合同范本简洁版

个人装修合同范本简洁版 委托方(甲方):_________承接方(乙方):_________ 甲、乙双方经友好洽谈和协商,甲方决定委托乙方房屋进行地砖、墙砖铺设,订立本协议,以共同恪守。 一、工程地点:____区____街____单元____室 二、形式结构:____层式____室____厅____厨____卫 三、工程项目: 1、四个房间(两卧室、两客厅)地面铺设80*80瓷砖,打地角线,要求平整;一个厨房,一个卫生间墙面25*40铺瓷到顶,留出 吊顶空间,边角打磨,地面铺30*30瓷砖,要求平整;两个阳台地 面铺设30*30瓷砖,要求平整。 2、未尽细节的之处,由甲方提出方案,商量确定。 四、承包方式:甲方按乙方要求必须保证装修期间的所需材料(乙方需提前通知甲方),和施工期间的午餐供应,乙方负责施工。 五、质量标准:施工质量要符合安全要求,装修质量不得低于同一施工类型的装修标准,双方认可。工程竣工验收合格后,3个月 内因乙方施工出现质量问题,乙方负责无偿返工维修。 六、工程造价:材料由甲方提供,甲方支付乙方装修人工费 _________元人民币。 七、付款方式:为确保工程质量,暂扣500元押金,____年____月____日至____年____月____日内无任何问题,将全额返还乙方。 工程完工后,经甲方验收,如符合以上施工项目和设计要求,三天 内付清乙方人工费, 八、本协议一式两份,甲乙方各执一份,具有相同效应。本协议自双方签字之日起生效。

甲方:_________乙方:_________ 签字(盖章):_________签字(盖章):_________ 联系电话:_________联系电话:_________ ____年____月____日 委托方(甲方):_________ 承接方(乙方):_________ 工程项目:_________ 甲、乙双方经友好洽谈和协商,甲方决定委托乙方进行居室装潢。为保证工程顺利进行,根据国家有关法律规定,特签订本合同,以 便共同遵守。 第一条:工程概况 1.工程地址:___________________________________ 2.居室规格:房型______层(式)______室______厅______厨 ______卫,总计施工面积____________平方米。 3.施工内容:详见本合同附件(一)《家庭装潢施工内容单》和施工图。 4.委托方式:____________________________________________ 5.工程开工日期:______年______月______日 6.工程竣工日期:______年______月______日 工程总天数:________天 第二条:工程价款 工程价款(金额大写)___________________元,详见本合同附 件(二)《家庭装潢工程材料预算表》。 1、材料款__________元; 2、人工费__________元;

家庭装修合同样本(标准版)

编号:_________________ 家庭装修合同样本 甲方:________________________________________________ 乙方:________________________________________________ 签订日期:_________年______月______日

委托方(甲方):______________ 承接方(乙方):______________ 工程项目:____________________ 甲、乙双方经友好洽谈和协商,甲方决定委托乙方进行居室装潢。为保证工程顺利进行,根据国家有关法律规定,特签订本合同(包括本合同附件和所有补充合同),以便共同遵守。 第一条工程概况 1.工程地址:___________________________________ 2.居室规格:房型______层(式)______室______厅______厨______卫 ______室,计______平方米; ______厅,计______平方米;

______厨房,计______平方米; ______卫生间,计______平方米; ______阳台,计______平方米; ________过道,计______平方米; 其他(注明部位)____________,计________平方米。 总计:施工面积____________平方米。 3.施工内容:详见本合同附件(一)《家庭装潢施工内容单》和施工图。 4.委托方式:____________________________ 5.工程开工日期:______年______月______日 6.工程竣工日期:______年______月______日 工程总天数:________天

最新办公室装修合同样本

最新办公室装修合同样本 办公室装修细节之一 ,风格在明亮整洁,办公室是一个办公场所,所以在装修上一定要 强调严谨,精致,而且还要结合不同的行业特点,装修出一个企业 的特色,突出企业的精神。 办公室的装修细节之二 ,也应该注意消防方面的工作,如果办公室想要吊顶,一定要注意 室内的喷淋口,应把喷淋口与室内顶部的距离拉开一定的距离,所 以装修办公室一定要找专业的装修公司,才能放心。 办公室装修细节之三 ,所用到的装修色彩一定要合理,因为办公室是人们最用脑的场所,如果环境不好,就会影响办公人员的心情,以致达不到工作效率。 所以在办公室装修的前期一定做好准备,一个完整、统一而又美观 的办公环境,也能增加客户的信任感,也能让工作人员在心理和精 神上感觉满足。 合同样本 发包方(以下简称甲方):_____________

委托代理人(姓名):__________ 身份证号: ____________________ 联系电话:_______________ 承包方(以下简称乙方):__________ 单位地址:____________________ 委托代理人:__________ 联系电话:____________________ 施工队负责人:__________联系电话:___________________ 依据《中华人民共和国合同法》及其他有关法律、法规的规定,结合西安市家庭居室装饰装修的特点,甲、乙双方在平等、自愿、 协商一致的基础上,就乙方承包甲方的家庭居室装饰装修工程(以下 简称工程)的有关事宜,达成如下协议: 第一条工程概况 1.1工程地点:______________________________ 1.2工程装饰装修面积:______________________ 1.3工程户型:____________________ 1.4工程承包,采取下次第_____种方式: (1)乙方包工、包全部材料 (2)乙方包工、包部分材料,甲方提供其余部分材料 1.6工程期限____日(以水电工作结束的第二天起计算) 开工日期:______年___月___日

个人房屋装修合同样本简单版

个人房屋装修合同样本简单版 房屋进行装修,需要和装修队签订好合同,确保装修的质量。下面是由为大家整理的“个人房屋装修合同样本范本”,仅供参考,欢迎大家阅读。 个人房屋装修合同样本简单版(一)甲方:_________________代表人:_________________ 乙方:_________________代表人:_________________ 依照《中华人民共和国合同法》及相关法律、法规的规定,结合住宅装饰工程施工的特点,遵循平等、自愿、公平和诚实信用的原则,双方经友好洽谈和协商,就双方的住宅装饰工程的有关事宜,达成如下协议: 一、工程概况 1、工程地点:_____________________。 2、工程内容及做法:详见双方确认的工程预算表、施工图和工程内容。 3、承包方式:双方商定采取下列_________种方式。 (1)包工包料; (2)包工、包部分材料; (3)包工不包料。 4、工程期限及保修期:工程期限_________天。自_________年_________月_________日起至_________年_________月_________日止。保修期:_________月。自工程竣工经甲方验收合格,双方签字之日起计算,并由乙方开具工程保修单。 5、合同价款及付款方式: 本合同总价为(大写):_________(小写)_________元,合同生效后,甲方按下的约定向乙方支付工程款: 开工前三天,支付(合同总价____%)________元; ________年____月____日支付(合同总价____%)________元; 双方验收合格,支付(合同总价____%)_________元。 工程验收合格后,乙方应向甲方提出工程结算单,并将有关资料送交甲方,由甲方在____天内审核完毕如无异议视为同意,并在签字同时结清工程余款,工程发票(合同总价)中所应缴纳的税金由甲方承担。 二、双方应尽的责任及义务 甲方: 1、开工前_________天,为乙方入场施工创造条件,腾空房间,清除影响施工的障碍物,对只能腾空的部分房屋而滞留的家具、陈设应归堆,遮盖,采取保护措施; 2、提供施工期间的水源、电源,并承担相应费用; 3、负责协调施工队和邻里之间的关系; 4、不得变动建筑主体或者承重结构,如确需折改原建筑结构、设备管线,负责到有关部门办理相应的审批手续; 5、协调有关部门做好现场保卫、消防、垃圾处理等工作,并承担相应费用; 6、对工程质量、施工进度进行检查和监督; 7、甲方家庭成员对工程的意见,均需经过甲方代表与乙方接触。 乙方: 1、根据施工图纸,提供施工方案和进度计划,交甲方备案认可; 2、施工中严格执行安全施工操作规范、防火规定、施工规范及质量标准,按期保质完成工程;

办公室装修合同样本

装修协议 发包人:(以下简称甲方) 承包人:(以下简称乙方) 依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其它有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方就本建设工程施工事项协商一致,订立本合同。 第一条:工程概况 1. 工程名称: 2. 工程地点: 3. 工程范围:室内装修(见预算清单) 4. 工程承包方式:本工程采用包工包料方式承包(参见附件清单) 5. 工程造价: (1)工程预算总造价为¥元, 大写人民币:元整。 (2)本工程总造价计算依据: A、以甲方提供工程设计施工图纸及设计变更、现场签证为依据。 B、施工中甲、乙双方确认的施工障碍引起的变更或增加措施等费用。 C、施工中甲方要求新增加的项目费用。 第二条:工程期限 1. 经甲、乙双方商定:本工程合同工期为天,具体开竣工时间以甲、乙双方签订的开工报告为准。 2. 本工程计划开工日期为年月日, 计划竣工日期为年月日。 3. 本工程在施工过程中,如遇下列情况,可顺延工期: (1)由于不可抗力造成无法正常施工的; (2)由于甲方原因影响连续施工的(包括工程付款不到位);

(3)由于设计变更或设计未确定的; (4)由于未办妥相关物业或行政审批手续的; (5)由于施工工地(非乙方原因)一月内停电停水停气造成停工累计超过8 小时; (6)由于甲方原因不能及时配套或配套单位不能配合而影响施工的。 第三条:工程施工准备与双方责任 1. 甲方责任: (1)开工前甲方协调各方面的关系,办妥进场手续,甲方承担进场手续费用。 (2)组织好设计交底及图纸会审工作。 (3)委托为甲方代表,实行工程质量、进度监理,代表甲方处理工程日常事宜。 (4)开工前 1 天,甲方腾空装修场地以便工程开工。 (5)做好甲方提供材料及设备的供应,落实建设资金,按期拨付工程预付款,办理现场签证,竣工验收。 2. 乙方责任: (1)开工前组织有关人员熟悉施工图纸和设计资料,编制施工图预算和施工 组织计划,制定施工总计划进度。 (2)做好施工准备工作,组织好人员及材料设备的进场、采购、供应和管理。 (3)严格按施工图与说明书施工,确保工程质量,按合同规定的时间如期完 工和交付,并承担双方约定的维修保养协议相关规定。人为损坏的修理由责任方负责,并承担费用。 (4)委托为乙方代表,代表乙方与甲方代表人员接洽。 第四条:工程价款及支付 1. 本工程合同预算以施工图及施工方案的工作量为依据编制。 2. 由物业收取的管理配合、装修押金等相关费用,由甲方支付。 3. 本工程合同总价为¥: (元整)。 4.支付采取按工程进度分段付款方式。 5. 分段付款的时间及相应金额为: (1)合同签订时付合同价30 %,计¥(元整);

相关主题