AAR:Appearance Approval Report 外观批准报告A/D/V:Analysis/Development/Validation 分析/开发/验证A/D/V–DV:ADV Design Validation ADV设计验证A/D/V P&R:Analysis/Development/Validation Plan and Report.This form is used to summarize the plan and results for validation testing.Additional information can be found in the GP-11 procedure.分析/开发/验证计划和报告A/D/V–PV:ADV Product Validation ADV产品验证AIAG:AP:Advance Purchasing 先期采购APQP:Advanced Product Quality Planning 产品质量先期策划APQP Project Plan:A one-page summary of the SGM APQP process that describes the tasks and the timeframe in which they occur.APQP项目策划AQC:Attribute Quality Characteristic 属性质量特性Advanced Supplier Quality Engineer 先期供应商质量工程师BIW:Body in White. Usually the bare metal shell of the body including doors and deck lid prior to paint and trim.白车身BOM:Bill of Materials 材料清单BOP:Bill of Process 过程清单Brownfield Site:An expansion of an existing facility.扩建场地CMM:Coordinate Measuring Machine 三坐标测试仪Cpk:Capability Index for a stabile process 过程能力指数CTC:Component Timing Chart (DRE document)零部件时间表(DRE文件)CTS:Component Technical Specifications 零部件技术规范CVER:Concept Vehicle Engineering Release 概念车工程发布Design Complete 设计完成Defect outflow detection:A phrase used in the Supplier Quality Statement of Requirements that refers to in-process or subsequent inspection used to detect defects in parts.缺陷检测DFM/DFA:Design for Manufacturability / Design for Assembly 可制造性/可装配性设计DFMEA:Design Failure Modes and Effects Analysis.It is used to identify the potential failure modes of a part, associated with the design, and establish a priority system for design improvements.设计失效模式和后果分析DR:Documentation Required DR特性DRE:Design Release Engineer 设计释放工程师DV:Design Validation 设计验证E&APSP:Engineering & Advance Purchasing Sourcing Process.工程&先期采购定点程序EP:E-Procurement 电子采购流程Error Occurrence Prevention:A phrase used in the Supplier Quality Statement of Requirements that refers to poke yoke or error-proofing devices used to prevent errors in the manufacturing process from occurring.防错FTQ:First Time Quality 一次通过质量GA:General Assembly 总装GD&T:Geometric Dimensioning & Tolerancing 几何尺寸与公差SGM:ShanghaiGeneral Motors 上海通用汽车GMAP:General Motors Asian Pacific 通用汽车亚太GME:General Motors Europe 通用汽车欧洲GMNA:General Motors North American 通用汽车北美GP:General Procedure 通用程序GPDS:Global Product Description System 全球产品描述系统GPS:Global Purchasing System 全球采购系统GPSC:Global Purchasing & Supplier Chain 全球采购及供应链GR&R:Gage Repeatability and Reproducibility 检具重复性及再现性Greenfield Site:A new supplier facility that is built to support a program.GVDP:Global Vehicle Development Process全球整车开发流程IPTV:Incidents per Thousand Vehicles 每千辆车故障IVER:Integration Vehicle Engineering Release 集成车工程发布KCC:Key Control Characteristics.It is a process characteristic where variation can affect the final part and/or the performance of the part.关键控制特性KCDS:Key Characteristic Designation System 关键特性指示系统Kick-Off Meeting:The first APQP supplier program review.启动会议(第一次APQP供应商项目评审)KPC:LAAM:(General Motors) Latin American, Africa & Meddle East(通用汽车)拉丁美洲、非洲及中东MCR:Maximum Capacity Rate. It is the GM maximum capacity requirement.最大生产能力MOP:Make or Purchase 制造/采购MPC:Material Production Control 物料生产控制MPCE:Material Production Control Europe 欧洲物料生产控制MRD:Material Required Date; date material must be delivered in order to allow a build event to begin.物料需求日期MSA:Measurement Systems Analysis 测量系统分析MVBns:Manufacturing Validation Build non-saleable 非销售车制造验证MVBs:Manufacturing Validation Build saleable 销售车制造验证NBH:New Business Hold 停止新业务N.O.D.:Notice of Decision 决议通知Original Equipment Manufacturer 主机客户PAD:Production Assembly Documents 生产装配文件PC&L:Production Control & Logistics 生产控制&物流PDT:Product Development Team 产品开发小组PFMEA:Process Failure Modes and Effects Analysis.It is used to identify potential failure modes associated with the manufacturing and assembly process.过程失效模式和后果分析PPAP:Production Part Approval Process 生产件批准程序Ppk:Performance index for a stable process 过程能力指数PPM:1) Program Purchasing Manager, 2) Parts per Million (rejects and returns to suppliers)1)项目经理2)每百万件的产品缺陷数PPV:Product & Process Validation 产品及过程验证PQC:Product Quality Characteristic 产品质量特性Problem Reporting & Resolution 问题报告及解决PSA:Potential Supplier Assessment, a subset of the Quality System Assessment (QSA)潜在供应商评审PV:Product Validation 产品验证QSA:Quality System Assessment 质量体系评审QSB:Quality Systems Basics 质量体系基础QTC:Quoted Tool Capacity 工装报价能力RASIC:Responsible, Approve, Support, Inform, Consult 负责、批准、支持、通知、讨论RFQ:Request For Quotation 报价要求RPN:Risk Priority Number related to FMEA development 风险顺序数RPN Reduction Plan:An action plan that describes what is being done to reduce the risk priority number for items listed in the DFMEA or PFMEA.降低RPN值计划Supplier Development Engineer 供应商开发工程师SFMEA:System Failure Mode and Effects Analysis 系统失效模式分析SMT:System Management Team 系统管理小组SOA:Start of Acceleration 加速开始SORP:Start of Regular Production 正式生产SOR:Statement of Requirements 要求声明SPC:Statistical Process Control 统计过程控制SPO:(General Motors) Service and Parts Operations(通用汽车)零件与服务分部SQ:Supplier Quality 供应商质量SQE:Supplier Quality Engineer 供应商质量工程师SQIP:Supplier Quality Improvement Process 供应商质量改进过程SSF:Start of System Fill 系统填充开始SSTS:Sub-system Technical Specifications 子系统技术规范Sub-Assembly/ Sub-System:Subcontractor:SVE:Sub-System Validation Engineer 子系统验证工程师SVER:Structure Vehicle Engineering Release.结构车工程发布Team Feasibility Commitment:An AIAG APQP form that is provided with the Request for Quotation.It is the supplier’s concerns with the feasibility of manufacturing the part as specified.小组可行性承诺TKO:Tooling Kick-Off 模具启动会议UG:Unigraphics UG工程绘图造型系统VLE:Vehicle Line Executive 车辆平台负责人VTC:Validation Testing Complete 验证试验完成EWO:Engineering Work Order 工程工作指令11/ 11。