上海中考英语考纲单词、词组默写中文+词性英文中文+词性英文能够;有能力的 adj. 得到;实现v. 能力;才能n. 穿过;横过 prep. 关于prep. 扮演 v. 大约;到处;四处adv. 行动 n. 在……上面prep. 积极的;主动的 adj. 在国外adv. 活动 n. 接受;认可v. 男演员 n.令人惊讶的 adj. 女演员 n. 车祸,事故;意外的事 n. 加上 v. 精确地 adv. 活着的 adj. 加;增加 n. adj.1、(修饰单数名词)全; 地址 n. 总;整2、(修饰复数名词)全部;所有的采用,采纳;收养v. 全部 adv. 有利条件;优势;优点n. 全部;全体人员 pron. 广告 n. 全部;全体人员 n. 劝告;忠告 n. 允许,准许 v. 担负得起……的费用;抽几乎,差不多 adv. 得出(时间) prep.害怕;担心 adj. 单独地 adv. 非洲 n. 沿着;顺着 prep. 在……之后,在……后面向前;和……一起;一同 adv. prep.在后;后来 adv. 已经 adv. 在……之后 conj. 也 adv. 下午 n. 虽然;尽管conj. 再一次;再;又 adv. 总共;全部地 adv. 反对 prep. 总是;永远 adv. 时代;年龄 n. 上午有……之年岁的 adj. 令人惊讶的 adj. 代理人 n. 雄心;野心 n. 以前 adv. 美国,美洲 n. 同意;应允 v. 美国的;美洲的adj. 在前 adv. 美国人 n. 目的 n. 在(三者或三者以上)之间;系……中之一; 瞄准 v.与……在一起 prep. 空气;大气 n.空调 n 数量; 总数 n. 航线 n. 引起乐趣的,娱人的 adj. 机场 n.警报 n.be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts,select low thermal conductivity materials as far as possible, ensurethat these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly中文+词性英文中文+词性英文古代的 adj. 到达;达到 v. 和 conj. 艺术n. 生气地;愤怒的adv. 文章 n. 生气的;愤怒的adj. 艺术家;画家 n. 动物 n. 当……时;像……(一样);如同;因为;由于再一;另一;别的adj.另一个 pron. conj.回答;答复;答案;回(信) 同样地 adv. n.回答;答复;回(信)v. 当……时;作为;当作prep. (用于疑问句,否定句,条件句)一些;什么;任亚洲 n. 何的;任一的 adj. 问;请求;要求 v. (无论)哪一个;(无论)助手,助理 n. 哪些 pron. 在……(表示地点、时间、对象、方向等) 任何人 pron. 大西洋 n. 什么事(物);任何事(物) 进攻;攻击v. pron. 出席,参加 v. 任何地方 adv.道歉 v. 吸引 v. 出现 v. 吸引;吸引力;吸引物 n. 苹果 n. 有吸引力的 adj. 四月 n. 八月 n. 面积;地区 n. 姑;姨;婶母;舅母 n. 争论;争吵 v. 澳大利亚 n. 手臂 n. 澳大利亚的 adj. 军队;陆军 n. 澳大利亚人 n. 在……周围;环绕著者;作家 n. prep.&adv. 自动的 adj. 安排;布置 v. 秋天;秋季 n.可用的;可得到的 adj.平均;平均数 n.powder paint fully dry after. Protective coverings for electric equipment insudiameter pipes after heat preservation plasteringconstruction of valves, turbine, checking smooth surface, high temperature -the expansion space and insulation thickness. Large diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account-ot overheat. Smallthermal insulation for piping support and hanger design, reduced heatdissipation of the hangers, ensure that the wall does n temperature special-proof measure. 6.2 thermal design optimization for high-insulation material in windproof, waterproof, moisturethan 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal be limited to no morey management optimization of construction process and develop a reasonable duration, regional transfer of strictlyhnologmal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation tecttention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low therpay a igned with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installationtechnology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes deshods, ful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction metnsulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautisite machining. Before valves, flange i-ing order, ensure when installing corners neat, uniformappearance, reduce the amount of onlation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publish2初三英语考纲词汇默写中文+词性英文中文+词性英文平均的 adj. 熊 n. 授予 v. 美丽的 adj. 奖,奖品 n. 优美地 adv. 离开,远离 adv. 因为 conj. 可怕的 adj. 变得;成为v. 婴儿 n. 床 n. 向后;回原处 adv. 卧室 n. 背;背后;后部 n. 啤酒 n. 糟糕;可惜;坏的;严重在……前面;在……以前的 adj. prep.书包;提包;袋子 n. 以前adv. 平衡 n. 在……之前 conj. 球 n. 请求 v. 气球n. 开始;着手 v. 香蕉n. 开始;开端 n. 银行 n. 在……后面 prep. 酒吧 n. 在后面;向后 adv. 基地;基础 n. 人;生物 n. 篮子 n. 相信;认为 v. 篮球 n. 钟;铃n. 球拍 n. 属;附属 v. 洗澡 n. 在……下面 prep. 战争;战役 n. 带子 n. 是;成为 v. 在……旁;靠边 prep. 海滩 n. 除了 prep. 敲打;打败;(心)跳动 v. (good 和well的最高级形式)最好的 adj.(well的最高级形式)最好地dv.lectric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model uction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for ediameter pipes after heat preservation plastering constr-space and insulation thickness. Large diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion-t the wall doesnot overheat. Smallthatemperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure -proof measure. 6.2 thermal design optimization for high-e use of thermal insulation material in windproof, waterproof, moistured makbe limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently anictlystr insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of select low thermalconductivity materials as far as possible, ensure that these parts donot overheat. 6.3 quality defects of parts,ing installation payattention to the piping, oil station is a low point. Refueling must be controlled when casting material pening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing duroor oonstruction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, dtidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and c sulation cover unified,site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, in-ications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of onspecif3中文+词性英文中文+词性英文最好的(人或物) n. 煮 v. (good和well的比较级骨头 n. 形式)较好的 adj.在(两者)之间 prep. 书;本子 n. 自行车 n. 预订(票,座位)等 v. 大的 adj. 令人厌烦的 v. 超片,纸币;账单 n. (动词bear的过去分词)出生箱子,垃圾箱 n. (向别人)借;借用 v. 鸟 n. 两者(都);两人(都);双方 pron.生日 n. 两……(都);两个……(都) adj.饼干 n. 两个都 adv. 一点;一些 n. 瓶 n. 咬 v. 底部 n. 黑色 n. 碗 n.黑色的 adj. 箱;盒 n. 黑板 n. 男孩 n. 毯子 n. 勇敢的 adj. 瞎的 adj. 面包n. 盲人 n. 打破;打断 v. 一排房屋;街区(四条街休息 n. 道的区域);大块 n.吹;刮风;吹气v. 早饭 n. 蓝色 n. 呼吸 n. 蓝色的 adj. 桥 n. 板;木板 n.简短的,简洁adj. 登,上(飞机,船等) v. 明亮的;聪明的 adj. 划船(游玩) v. 明亮地 adv. 身体;躯体 n. 带来,拿来 v.powder paint fully dry after. Protective coverings for electric equipment insudiameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature -the expansion space and insulation thickness. Largediameter piping, thermal instrument layout and positioning of supportand hanger design take fully into account-ot overheat. Smallthermal insulation for piping support and hanger design, reduced heatdissipation of the hangers, ensure that the wall does n temperature special-proof measure. 6.2 thermal design optimization for high-insulation material in windproof, waterproof, moisturethan 2 days of work, material deposited in special insulated containers, materialhandling to gently and make use of thermal be limited to no morey management optimization of construction process and develop a reasonable duration, regional transfer of strictlyhnologmal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation tecttention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low therpay a igned with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installationtechnology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes deshods, ful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction metnsulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautisite machining. Before valves, flange i-ing order, ensure when installing corners neat, uniform appearance, reduce the amount of onlation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publish4初三英语考纲词汇默写中文+词性英文中文+词性英文不列颠(即英国) n. 再见 int. 英国人 n. 卷心菜 n. 英国的 adj. 蛋糕;饼;糕 n. 广播;节目 n. 计算器 n. 兄弟 n. 称呼;取名;呼唤;打电话给…v.棕色;褐色 n. 叫;喊;(一次)电话,通话 n. 棕色的;褐色的 adj. 照相机 n.刷子 n. 野营 n. 刷;擦 v. 能,会;可能 v. aux. 建造;建筑 v. 加拿大 n. 建筑物;大楼 n. 加拿大的adj. 外滩 n. 加拿大人 n. 燃烧 v. 取消 v. 公共汽车 n. 蜡烛 n. 商业;生意 n. 帽子 n. 商人 n. 首都 n. 女商人 n. 船长 n. 忙 adj.小汽车 n. 但是 conj. 卡片 n. 黄油 n. 小心;关心;照管 n.& v. 蝴蝶 n. 小心的;仔细的 adj. 按钮;纽扣 n. 小心地;仔细地 adv. 购买 v. 胡萝卜 n. 靠近;在……旁边;(指时运送;搬运;携带 v. 间)不迟于;(用于被动语态)被 prep.uction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for ediameter pipes after heat preservation plastering constr-space and insulation thickness. Large diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion-t the wall does not overheat. Smallthatemperature special thermal insulationfor piping support and hanger design, reduced heat dissipation of the hangers, ensure -proof measure. 6.2 thermal design optimization forhigh-e use of thermal insulation material in windproof, waterproof, moistured makbe limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently anictlystr insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of parts,ing installation pay attention to the piping, oil station is a low point. Refueling must becontrolled when casting material pening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing duroor oonstruction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, dtidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and c sulation cover unified,site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, in-ications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of onspeciflectric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model 5中文+词性英文中文+词性英文动画片;漫画 n. 化学物质 n. 箱,盒;案件n. 化学 n. 猫 n. 国际象棋 n. 接住;捉住;赶上(车辆); 胸 n. 患(病);弄清楚;领会;小鸡;鸡肉 n. 理解 v. 首领,头目 n. 原因 n. 主要的,首要的;首席的adj.使产生,引起 v. 孩子;儿童 n. 庆祝 v. 中国 n. 分(美国货币单位) n. 中国人;汉语 n. 中心;中央 n. 中国的 adj. 世纪,百年 n. 巧克力 n. 一定的,有把握的 adj. 选择 n. 一定;无疑;是的,当然; 选择 v. 好 adv. 圣诞节 n. 椅子n. 教堂 n. 机遇 n. 香烟 n. 改变;更改;兑零钱 v. 电影院;电影 n. 易变的,可变的 adj. 圆,圈 n. (电视)频道 n. 市民 n. 特征,特性;性格;人物,城市n. 角色 n. 拍手 v.& n. 主管,掌管 n. 班级;(一节)课;等级 n. 慈善 n. 同学 n. 便宜的,廉价的 adj. 教室 n. 检查 n.& v. 干净的;清洁的 adj. 欢呼;喝彩 n.& v. 打扫;弄干净;擦干净 v. 奶酪 n. 清晰的;明亮的;清楚的adj.化学的 adj. 清楚;清扫(天气)放晴v.清晰地;明亮地;清楚地adv.lation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishpowder paint fully dry after. Protective coverings for electric equipment insudiameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature -the expansion space and insulation thickness. Large diameter piping, thermal instrument layout and positioning of support and hanger design takefully into account-ot overheat. Smallthermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does n temperature special-proof measure. 6.2 thermal design optimization for high-insulation material in windproof, waterproof, moisturethan 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal be limited to no morey management optimization of construction process and develop a reasonable duration, regional transfer of strictlyhnologmal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation tecttention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low therpay a igned withinsulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installationtechnology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes deshods, ful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction metnsulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy andbeautisite machining. Before valves, flange i-ing order, ensure when installing corners neat, uniform appearance, reduce the amount of on6 初三英语考纲词汇默写中文+词性英文中文+词性英文职员;办事员 n. 抱怨;投诉 v. 聪明的 adj. 完整的,完全的adj. 气候 n. 完成,结束 v. 爬 v. 计算机 n. 医务室 n. 音乐会 n. 时钟 n. 结论;结束,结局 n. 关;闭 v. (汽车、电车上的)售票近的 adj. 员;(火车上的)列车员 n. 近;靠近 adv. 会议;讨论会 n. 衣服 n. 确信的;有信心的,自信的 adj. 云 n.多云的;阴天的 adj. 使混淆 v. 海岸 n. 祝贺 n. 外衣;上衣 n. 连接;把……连接起来咖啡 n. 组成;构成 v. 硬币 n. 竞赛 n. 冷的;寒冷的 n. 洲;大陆 n. 寒冷;着凉;感冒 n. 继续 v. 收集;采集 v. 控制 v.& n. 收集 n. 便利的;方便的adj. 学院 n. 会话;谈话 n. 颜色 n. 厨师;炊事员 n. 涂色 v. 烹调;煮;烧 v. 来;来到 v. 凉的;凉爽的;酷 adj. 舒服的 adj. 冷却 v. 普通的 adj. 抄本;副本;一本(份,册) n. 交流,交际 v.公司 n. 抄写;复制;模仿 v. 比较 v. 角;拐角 n. 竞赛 n. 正确的 adj.ications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of onspeciflectric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model uction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after.Protective coverings for ediameter pipes after heat preservation plastering constr-space and insulation thickness. Large diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion-t the wall does not overheat. Smallthatemperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure -proof measure. 6.2 thermal design optimization for high-e use of thermal insulation material in windproof, waterproof, moistured makbe limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently anictlystr insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of parts,ing installation pay attention to the piping, oilstation is a low point. Refueling must be controlled when casting material pening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing duroor oonstruction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, dtidy and beautiful.When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and c sulation cover unified,site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, in-7中文+词性英文中文+词性英文改正;纠正 v. 破坏 v. 值(多少钱);花费 v. 跳舞 v.& n. 棉花 n. 危险 n. 咳嗽 v.& n. 危险的 adj. 数 v. 黑暗;黑色;深色n. 国家;农村;乡下 n. 黑暗的;黑色的;深色的adj.(一)对,(一)双,(一) 日期 n. 副 n. 女儿 n. 过程;课程 n. (一)天;(一)日;白堂(表)兄,弟;堂(表) 天 n.姐,妹 n. 死的;无生命的 adj. 覆盖;遮盖;掩盖 v. 分配,分给;给予;经营;对付 v.覆盖物;封面 n. 亲爱的 adj. 母牛 n. 呵,哎呀(表示伤心,交际,惊奇等) int. 发狂的,疯狂的 adj. 死亡 n. 创造;创作 v. 争论,辩论,讨论 n. 十字,叉 n. 十二月 n. 穿越 v. 决定;下决心 v. 拥挤的;满座的adj. 决定 n. 喊叫;哭 v.& n. 装饰 v. 文化 n. 深 adj. 杯子;杯 n. 学位,度n. 习惯;风俗 n. 耽搁,延误 n.& v. 顾客 n. 美味的,可口的 adj. 切;割;剪;砍;削 v. 投递,传送 v. 骑车 v. 牙科医生 n. 日报 n. 百货商店 n.启程;离开;出发 n.依靠,依赖 v.lation boards designed with pressure plate, when ordering accordingto the installation diagram, model specifications publishpowder paint fully dry after. Protective coverings for electric equipmentinsudiameter pipes after heat preservation plastering construction ofvalves, turbine, checking smooth surface, high temperature -the expansion space and insulation thickness. Large diameter piping, thermal instrument layout and positioning of support and hanger design takefully into account-ot overheat. Smallthermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does n temperature special-proof measure. 6.2 thermal design optimization for high-insulation material in windproof, waterproof, moisturethan 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal be limited to no morey management optimization of construction process and develop a reasonable duration, regional transfer of strictlyhnologmal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation tecttention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low therpay a igned with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installationtechnology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes deshods, ful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction metnsulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy andbeautisite machining. Before valves, flange i-ing order, ensure when installing corners neat, uniform appearance, reduce the amount of on8初三英语考纲词汇默写中文+词性英文中文+词性英文描述 v. 不喜欢 v. 沙漠 n. 陈列,展览;显示 n.& v. 值得 v. 距离 n. 设计 v. 分,划分;除 v. 书桌;写字台 n. 干;做(事) v. 破坏 n. 放在主语前构成疑问;与not连用构成否定句 v. 侦探的 adj.aux. 侦探 n.发展;开发,培养 v. 医生 n. 发展 n. 狗 n. 对话 n. (美国、加拿大等国的货日记 n. 币单位)元 n. 辞典;词典 n. 门;通道 n. 死 v. 向下 adv. 食物;食谱 n. 沿着(街道、河流)而下prep. 区别 n.不同的;差异的往楼下;在楼下 adv. adj.困难的;艰难的画,绘制;拉,拖 v. adj.困难 n. 梦想;梦 n. 挖(洞,沟等);掘服装,女装,童装 n. v.餐厅 n. 穿衣 v. 正餐 n. 喝;饮 v. 脏的 adj. 饮料;喝酒 n. 消失 v. 驾驶;驱赶 v. 发现,看出 v. 驾驶员,司机 n. 讨论 v. 滴 n. 讨论 n. 扔;掉 v. 盘;碟;(盘装)菜干的;干燥的 adj. 肴不诚实 adj. 鸭 n.乏味的 adj.speciflectric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model uction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for ediameter pipes after heat preservation plastering constr-space and insulation thickness. Large diameter piping, thermal instrument layout and positioning ofsupport and hanger design take fully into account the expansion-t the wall does not overheat. Smallthatemperature special thermal insulationfor piping support and hanger design, reduced heat dissipation of the hangers, ensure -proof measure. 6.2 thermal design optimization forhigh-e use of thermal insulation material in windproof, waterproof, moistured makbe limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently anictlystr insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of parts,ing installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material pening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing duroor oonstruction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, dtidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and c sulation cover unified,site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, in-ications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on9中文+词性英文中文+词性英文馄饨;汤团 n. 电 n. 在……的期间 prep. 电子的 adj. 责任 n. 初级的;基本的 adj. 每人;每个;每件 adj. 大象 n. 每人;每个;每件 pron. 其他的;别的 adj. 渴望的adj. 空的 adj. 耳朵 n. 鼓励;怂恿 v.早的 adj. 末尾;终点;末端 n. 地球 n. 结束 v. 容易地 adv. 敌人 n. 东,东方 n. 活力;能量 n. 东方的 adj. 引擎,发动机 n. 容易的;不费力的 adj. 工程师 n. 吃 v. 英格兰 n. 经济;节约 n. 英国;英国人;英语 n. 教育 n. 英国的;英语的 adj. 教育的 adj. 欣赏;享有;喜欢 v. 效果 n. 使人愉快的,使人欢乐的效率高的;有能力的adj.足够的充分的 adj. adj. 蛋;卵 n. 足够地;充分地 adv. (两者中)任何一方足够;充分 n. (的);两者之一的 adj. 进入;参加 v.(两者中)任何一方入口 n. (的);两者之一的 adj. 信封 n. (两者中的)任何一方;两者之一 pron. 环境 n.(用于否定句或否定等于 v. 短语)也(不) adv. 逃跑;逃亡 v. 年龄较大的;年长的特别地 adv. adj.住宅区 n. 电的 adj.ing order, ensure when installing corners neat, uniform appearance, reduce the amount of onlation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishpowder paint fully dry after. Protective coverings for electric equipment insudiameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature -the expansion space and insulation thickness. Largediameter piping, thermal instrument layout and positioning of supportand hanger design take fully into account-ot overheat. Smallthermal insulation for piping support and hanger design, reduced heatdissipation of the hangers, ensure that the wall does n temperature special-proof measure. 6.2 thermal design optimization for high-insulation material in windproof, waterproof, moisturethan 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal be limited to no morey management optimization of construction process and develop a reasonable duration, regional transfer of strictlyhnologmal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation tecttention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low therpay a igned with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installationtechnology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes deshods, ful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction metnsulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautisite machining. Before valves, flange i-10初三英语考纲词汇默写中文+词性英文中文+词性英文欧洲 n. 昂贵的 adj. (节日的)前夜,前夕经验;经历 n. n.甚至;连(……都);实验 n. 更 adv.傍晚;晚上 n. 解释;说明 v. 比赛项目;事件 n. 探究,探索;勘察 v. 曾经;在任何时候 adv. 伸,伸出 v. 每一;每个的 adj. 眼睛 n. 每人;人人 pron. 寓言 n. 每日的;日常的 adj. 脸,面孔 n. 每件事;事事 pron. 事实;实际 n. 到处adv. 工厂 n. 确切地,精确地;(表失败;不及格 v. 示赞同的回答)确实如此 adv.考试;测试;检查 n. 公平的;合理的 adj. 检查;细查;对……进落下;下降;倒下;跌行考试 v. 倒 v.例子;榜样 n. 熟悉的 adj. 极好的 adj. 家庭 n. 除……以外 prep. 著名的adj. 交换;交流 v. 扇子 n. 兴奋的 adj. 远的 adj. 使人兴奋的 adj. 远地 adv. 原谅;宽恕 v. 农场;农庄 n. 接口;辩解 n. 农民,农夫 n. 锻炼;做操;练习,快的,迅速的 adj. 习题 n.展览;展览会 n. 快地;迅速地 adv. 期待 v. 肥胖的 adj.脂肪 n. 花费;费用 n.speciflectric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model uction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for ediameter pipes after heat preservation plastering constr-space and insulation thickness.Large diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion-t the wall does not overheat. Smallthatemperature special thermal insulationfor piping support and hanger design, reduced heat dissipation of the hangers, ensure -proof measure. 6.2 thermal design optimization forhigh-e use of thermal insulation material in windproof, waterproof, moistured makbe limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently anictlystr insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of parts,ing installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material pening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing duroor oonstruction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, dtidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and c sulation cover unified,site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, in-ications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on11中文+词性英文中文+词性英文父亲 n. 火;火炉;火灾 n. 恩惠 n. 消防队员 n. 最喜爱的 adj. 烟火 n. 传真 n. 第一的;最初的 adj. 恐惧 n. 第一;首先;最初 adv. 二月 n. 开始;开端 n. 喂养;饲养 v. 鱼;鱼肉 n. 感觉;摸;触 v. 捕鱼;钓鱼 v. 女性;雌性 n. 渔夫,捕鱼人 n. 围墙;栅栏 n. 适合;与……相配 v. 渡船 n. 健康的 adj. 节日 n. 安装;修理 v. 取 v. 旗 n. 发烧 n. 闪光;闪现;手电筒 n. 不多;少数 pron. 一套房间;公寓 n. 不多的;少数的 adj. 飞行 n. 田地;。