允许直接进行光纤连接。
Components lost or damaged during completion of task
完成任务期间出现组件丢失或损坏
Coiling of excess cable, fibre optic, tubes is not permitted. 不允许留多余的电缆、光纤、气管的线
螺钉头不得有损坏,而 且螺钉任何部分都不得 留有工具损坏的痕迹。 M – 180 Screw heads have to be undamaged and no parts of broken tooling should be on the screws. 锯切口必须平滑无毛刺。 M – 190 Saw-cuts must be burr-free. 用于展示时,型材台面应尽 可能处于最低位置。 For the presentation the M – 200 profile plate has to be in the lowest possible position. 装置的零部件和组件不得 超出型材台面。 如有例外,专家组将另行通 知。 Parts of devices and M – 210 components should not extend beyond the profile plate. Exceptions will be announced by the expert team.
must be secured using 2
cable holders.
线槽和接线终端之间的 导线不能交叉。
每个电缆槽只允许一个 E – 110 传感器/驱动器的连接
走线。
Conductors between cable
channel and terminals
beyond cable channel 外部绝缘层不得超出线槽
holders: < = 120 mm
唯一可以接受的束缚固 定线缆、电线、光纤线
缆、气管的方式就是使 用传导性线缆托架。 The only acceptable M – 45a method for binding Cable / Wire / Optical Cables / Tubes is to
workpieces must be
removed from the
M - 90
stations.
所有系统组件和模块 必须固定好。所有信号 终端也必须固定好。 All system components
and modules must be
secure.
All signal terminations
附件
第 44 届世界技能大赛广州市选拔赛机电一体化项目专业技术规范
机械部分 Mechanical
PP- Nr.
ok
M - 10
型材板上的电缆和气管必 须分开绑扎。 Cable and tubes must be
routed separately on the
profile plate.
当电缆、光纤电缆和气管
<= 5 mm
工作站的连接必须至少 使用 2 个连接件。 M – 120 Adjoining stations must be connected with at
least 2 connectors.
工作站之间的最大间 距需≤5mm M – 130 Maximum distance between
stations: <= 5 mm
都作用于同一个活动模
块时,允许绑扎在一起。
It is allowed to route M – 15
tubes, electrical and
optical cables together
when they go to a
moving module.
扎带切割后剩余长度需
≤1mm,以免伤人。
Remaining length of cut M – 20
not ok A
This also applies to cables under the profile plate.
I/O cabling between PLC and system will NOT be checked.
M - 40
线缆托架的间距为 ≤120mm。 Distance between cable
圈。
with cable holders. Short connections are possible. No coiling of the cables, if proper cut to length is possible.
台面上的光纤电缆可能 会与电源线绑到一起。 M – 170 On the plate optical cables may be tied to electrical cables.
所有电缆、气管和电线 都必须使用线缆托架 进行固定。
M – 160 Update
可以进行短连接。
如果可以将线缆切割 刀合适的长度,则不允 许留线圈。
All cables, tubes and
wires must be secured
Direct optical connections are allowed.
Uninsulated portion of end sleeve visible 不允许冷压端子未绝缘部分
外露
所有螺钉终端处接入的线 缆必须使用正确尺寸的绝 缘冷压端子。
可用的尺寸为, ,
E – 30
mm² 夹钳式连接除外(冷压 端子只用于螺钉) Insulated end sleeves of
the correct size for the
of bare conductors.
线、管需要剪到合适长
度,并且线、管圈不得伸
到线槽外。
如有例外,专家组将会另
行公布。
E – 90 Cable and tubes cut to
Update length, cable and tubes
loops should not extend
beyond cable channel.
may be made without the use of end sleeves.
Bare conductors must not extend beyond
terminal.
线槽中的电缆必须有至少
10mm 预留长度。
如果是同一个线槽里的短
接线,没必要预留
Electrical cables must
电气部分 Electrical
PP- Nr.
ok
no裸线。
E – 10 Bare conductors must not
be visible at end
sleeves.
将冷压端子插到终端模块 中。 E – 20 Insertion of end sleeves
into terminals
Removal of cable
outer–insulation in the
cable channel
E – 60
线槽必须全部合实,所 有槽齿必须盖严。 Cable channels must be
completely closed with
all teeth under the
cover.
要移除多余的线槽齿口
M - 100
must be secure.
不得丢失或损坏任何零 部件或组件(其中包括 电缆、线路等等) No parts or components
should be lost or damaged
(including cables, lines
and so on).
站与站之间的错位需小 于等于5 mm 。 M – 110 Station misalignment:
所有型材末端必须安装 盖子。 M – 140 All ends of profiles must
be fitted with caps.
固定任何一段线槽时都 应使用至少2个带垫圈的
螺丝。 M – 150 Use at least 2 screws
with washers to secure
any section of cable channel.
单根电线用绑扎带固定在线夹子上
单根电缆/电线/气管没有紧固在线 夹子上
M – 50 Update
use conducted cable
holders.
第一根扎带离阀岛气 管接头连接处的最短 距离为 60 mm +/- 5 mm。 Distance from the
shortest pneumatic
Unnecessary removal of channel teeth.
must not cross. Only one sensor /actuator connection per cable duct slot is allowed. 电线中不用的松线必须 绑到线上,并且长度必须 剪到和使用的那根长度 一样。 并且必须保留绝缘层,以 防发生触点闭合。 该要求适用于线槽内外 的所有线缆。 Loose ends of wire must be tied back to cable and must have the same length as used wires. E - 120 Insulation must be left to prevent any contact being made. This applies both inside and outside of the cable channel.