当前位置:
文档之家› Netapp FAS2554安装配置手册
Netapp FAS2554安装配置手册
1
3
1
3
1
3
1
3
B Switched clustered
Microsoft Windows client
Runs the software to con gure your storage system
Download:
• System Setup Software: /NOW/public/system_setup/ • OnCommand System Manager: /NOW/cgi-bin/software/
Disconnect all supply power for complete isolation.
Disconnect all supply power for complete isolation.
Disconnect all supply power for complete isolation.
e0c-e0f —10 GbE Ethernet ports or 0c-0f — Fibre Channel ports (SFP dependent)
Remote/Node Management port (wrench icon)
Gigabit Ethernet ports (2)
Power supply LEDs
N
1
2
3
4
Disconnect all supply power for complete isolation.
2
3
4
2
N
4
2
N
TO DATA
TO MANAGEMENT
NETWORK SWITCH SUBNET
C Switchless clustered
Data ONTAP
1 5
N
1
2
3
4
Disconnect all supply power for complete isolation.
2 Cable controller for 7-Mode Data ONTAP (option A), switched clustered Data ONTAP (option B) or for switchless clustered Data ONTAP (option C)
1 Attach cable management arms.
Connect port e0e | 0e to port e0e | 0e and e0f | 0f to e0f | 0f.
5 Strap the cables to the cable
management arms.
A 7-Mode
1 5
N
1
2
3
4
Disconnect all supply power for complete isolation.
to
the management or subnet switch.
B4
ห้องสมุดไป่ตู้
10 GbE cables
For option B only Connect port e0e | 0e and port e0f | 0f to the cluster switch.
C4
10 GbE cables
For option C only
Installation and Setup Instructions
FAS2554 Systems
1 Prepare for installation
1234 5
In the box:
Con guration worksheet
Starter network, storage, and 10 GbE cables
2
10 GbE cables
Connect port e0c to the data switch.
NOTE: Port e0c is required; other ports are available if needed.
3
Network cables
Connect the wrench port
2 Install hardware
1234 5
Power LED Attention LED Shelf ID display
Bezel
FRONT VIEW OF SYSTEM
Console port (Setting: 9600 N-8-1)
PCM Attention LED
SAS ports (2) NVMEM LED
N
1
2
3
4
Disconnect all supply power for complete isolation.
2
4
3
N
4
2
4
2
N
TO DATA
TO MANAGEMENT
NETWORK SWITCH NETWORK SWITCH
Disconnect all supply power for complete isolation.
BACK VIEW OF SYSTEM
One or two controller modules
ACP port (locked wrench icon)
1 Install system
• Rack the system.
Rail kit: follow instructions in the rail kit. OR System cabinet: install in the system cabinet.
Power cables
Serial cable not needed for this con guration
You provide:
Screwdriver
Rack space - 4U
Additional network cables
For connecting your storage to your network switch and Microsoft® Windows® client
• Place the bezel over the front of the system.
CAUTION LIFTING HAZARD
110 lbs (49.9 kg)
To reduce the weight of the disk shelf, remove the power supplies and controllers before lifting.