现代生产管理-需求式流程技术


K 10
PROCESS END
5 VA / EMPLOYEE
LINE DESIGN
Demand
FORECAST DEMAND FLOWRATE TAKT TIME
DESIGN REVIEW BETTER MANUFACTURABILITY /
Flow Technology
LINE BALANCE DFT DOCUMENTATION
TESTABILITY NVA ELIMINATION
QUALITY IMPROVEMENT PROCESS
TQC WORKSHEET SOE LINE LAYOUT TRAINING RECORDS
YIELD IMPROVEMENT
CUSTOMER SATISFACTION
MATERIAL HANDLING
Press start button to start the printing process.
(Tekan suis ‘Start’ untuk memulakan process seterunya.)
VERIFY Ensure the solder thickness hourly is according to spec by using the Z-Checker (Pastikan ketebalan solder paste setiap jam mengikut spec dengan menggunakan “ZChecker”.) Ensure there is no solder paste defects such as no solder paste, insufficient solder and misalignment. (Pastikan tiada kecacatan solder paste seperti tiada solder paste, kekurangan solder paste dan ’misalignment’.) After printing of every 5 panels, stencil has to be cleaned by brush and micro-wire paper. (Bersihkan stencil dengan berus dan ‘micro-wire paper’ selepas di ‘print’ 5 panel.)

• ▪ PPrrooductts/dSeefrevcictess tha次t a品re not required by consumers – The 8th Waste *2
产品/服务并不是客户所要求的 - 第8种浪费
*1 Toyota Manufacturing System 丰田制造体系
*2 The Machine That Changed The World 机器改变世界 by James P. Womack, Daniel T. Jones & Daniel Roos - IMVP, Massachusetts Institute of
用DFT我们将达
最小化无附加价值工作 减少生产周期 降低存货水平
减少空间需求 降低废料和返工 降低产品成本
Flex Factory
DFT Development Cycle
SCREEN PRINTING SMT (TOP) REFLOW
SMT (BOTTOM) TEST
ASSEMBLY No. PCBA
X
4.0
4.0
MOVE
M
L
PROCESS I.D. LINE #3
TQC INFORMATION
Verif y program code Verif y PCB alignment Verif y component placement Verif y machine settings Visual f or foreign materials
• In Traditional Manufacturing, focus is mainly on reduction of labor cost (mistakenly) 在传统的制造业里,将重点放在了减少劳动力成本 (是错误的)
• Material and finished goods inventory costs are often overlooked 物料和制成品库存成本往往被忽视
• At pre-determined Response Time 预先设定响应时间
• Achieve highest possible Inventory Turns 达到尽可能高的存货循环
• Eliminating Non Value Added activities (Waste) 消除无附加值活动(浪费)
SEQUENCE OF EVENTS
10 K
FEEDER LINE 10 K
10 K 10
GOALS / TARGETS 1 QUALITY PRODUCTS 2 ON-TIME-DELIVERY 3 INVENTORY TURNS 4 MANUFACTURING CYCLE TIME
PRODUCT SYNCHRONIZATION
8
Manufacturing the Traditional Way
Store 货仓
Plan Queue Work 计划 排期 工作
Buffer 缓冲区
Buffer 缓冲区
Plan Queue Work 计划 排期 工作
Buffer 缓冲区
Buffer 缓冲区
Stock 库存
Plan Queue Work 计划 排期 工作
Buffer 缓冲区
Buffer 缓冲区
Plan Queue Work 计划 排期 工作
Buffer 缓冲区
Buffer 缓冲区
Manufacturing The DFT Way
• DFT links Manufacturing Processes together DFT将所有制造过程联结在一起 • Materials are kept close to point of use (RIP) 物料的储存靠近使用点(RIP) • Reduces Work In Process Inventory or Buffers 减少在线存货量和缓冲区
Squeegee type : Metal Squeegee.
Printing speed : 30mm/s
Printing pressure : 4.5 TO 5.5kgF
Solder paste thickness : 6 –9 mils
WORK CONTENT
S/N P/NUMBER
DESCRIPTION
QTY
LOC
1 59574F
PCB
1
-
2 SOLDER PASTE
Kester, RMA222
REMARKS :
Load in the panel into machine in the direction shown.
(Masukkan panel kedalam mesin pada arah yang ditunjukkan.)
TRAINING GENERIC TRAINING PRODUCT/PROCESS TRAINING FLEXING
SUPPLIER PARTNERSHIP QUALITY DELIVERY KANBAN
KANBAN SIZE RIP KANBAN CARD DEMAND FENCE CUSTOMER RESPONSIVENESS LINEAR PLANNING
TQC
Check stencil set-up by the maintenance is correct.
(Pastikan stencil betul telah di sediakan oleh maintenanace.)
Check for the correct PCB Rev and solder paste used is as stated in work content.
Flex Factory
Demand Flow Technology 需求式流程技术
General Training material for Staff 职员培训资料
Demand Flow Technology
Flextronics has adopted Demand Flow Technology as the Manufacturing Strategy
供应商
机器 #1 机器 #2
机器单元
在线暂存料
存货区
MAN生UFA产CTU流RIN程G FLOW PROCESS
补充程序
在线暂存料
成品
What DFT will achieve ??
With DFT we will : 到: • Minimize non-value added work • Reduce product cycle time • Reduce the inventory levels • Reduce floor space requirements • Reduce scrap and rework • Reduce product cost
VA / NVA QUALITY CRITERIA TOTAL CYCLE TIME PROCESS EFFICIENCY
10
10
K 10
10
10Βιβλιοθήκη MANUFACTURING FLOW PROCESS
K
K
K
K
K
10 K
10 FEEDER LINE
IN-PROCESS KANBAN
K