国际工程项目施工分包合同中英文

国际工程项目施工分包合同(中英文)

CONTRACT OF SUBPROJECT EXECUTION

本合同系中译英翻译:云军

Translated from Chinese to English by Mr. Chang Yunejune.

签署日期:

Date of Signature :

总包商:General Contractor

分包商:Subcontractor

电气机械承包公司(以下简称总包商),和工程施工公司(以下简称分包

商),于_____ 订立本分包合同。

鉴于总包商已同利比亚国大型电气项目管理局(以下简称业主),就电气机械承包工程项目

的设计,运输和施工签订了合同;

鉴于分包商愿按该合同实施土建和安装工程而报了价;

鉴于总包商已接受分包商的报价,并依据分包商所附的报价表,现双达成协议如下:

This con tract is made and en tered in to on __ , betwee n Electrical

Mach ine Con tract ing Compa ny (here in after referred to as gen eral

con tractor) and Engin eeri ng Compa ny (here in after referred to as subco ntractor). WHEREAS gen eral con tractor has con cluded con tract, with Libya n

Nati onal Authority of Large Electrical Project (here in after referred to as employer ), of the design, transportation and execution of the contracted project of electrical machine installation;

WHEREAS subc on tractor is willi ng to execute the project of civil engin eeri ng and in stallati on and made quotati on there on;

WHEREAS general contractor has accepted subcontractor quotation;

NOW THEREFORE parties hereto, as per subcontractor hereby covenant and

s quotation, agree as follows:

(一)下列文件应是本分包协议的组成部分:

Following documents is the integral parts of this subcontracting contract.

1•电气、机械及技术操作的合同通用条款(1980年第一版);

General Provisions on Electrical / Machine and Technical

Operation ( First version 1980);

2.合同的特殊条款;Particular Provisio ns of Co ntract;

3 •电气机械工程项目的技术规;

Technical Norms of Project of Electrical / Machine;

4.工作围和技术要求;Contents and Tech ni cal Requireme nts for

Project;

5 •土建和安装工程分包合同的报价表

Quotation for Subcontract of Civil Engineering and Installation.

(二)工作围Project Contents 本建设电气机械工程项目位于利比亚国境,业主的技术规定如图所示。分包商的工作围包括如下容:

The project of Electrical Machine which technical requirements as shown in drawings, is located in the territory of Republic of Libya. The Working contents of subcontractor include the following:

1 •提供所有工程的监督人员,熟练和非熟练工人,提供运输、测绘工具及设备,挖掘及钻机械,吊车,以承担塔架安装和导线挂垂和拉直等工作。

Dispatching the personnel, for all projects, of supervision, skilled and unskilled workers, providing transportation, mapping tools / equipment, machines of digging & drilling and crane, which for the purpose of the executions of tower ins tallation, electrical line ' s hanging / straightening, and so on.

2.提供混凝土材料、水泥、砂、子、灰浆材料、钢筋,并运送到工地

Provision of and transportation of concrete materials, cement, sand, gravel, mortar materials and steel bar.

3.为所有工人及管理人员提供住宿、膳食、供水、卫生设备、交通费用和社会保险。Provision of, for all workers and administrators, accommodation, meals, water,