12 水手英语听力 第6章
3.The position of this guy is not right. You should move it a little bit ahead. A. This guy is positioned too much forward. B. This guy is positioned slightly forward. C. This guy is positioned too much aft. D. This guy is positioned slightly aft.
2.This guy rope is not serviceable. Please unfasten it. A. Please fasten the guy for it's not in good condition. B. Please unfasten the guy for it's not in good condition. C. Please fasten the guy for it's in good condition. D. Please unfasten the guy for it's in good condition.
6.S1:Should the damaged cargo by put aside? S2:Yes. Please don't discharge them until we inspect them together. Q:How shall the cargo be disposed of? A. It shall be sent ashore. B. It shall be put aside. C. It shall be examined again. D. It shouldn't be checked.
1.The motor doesn't work. I will call the electrician to check it. A. The motor can be used. I need not call the electrician to check it. B. The motor can not be used. I will call the electrician to check it. C. The motor can be used. I will call the electrician to check it. D. The motor can not be used. I will not call the electrician to check it.
7.S1:Check the hold for damage and report. S2:The cargo battens are damaged. Q:What does the first speaker want to know? A. The damage to the hold. B. The damage to the cargo batten. C. The state of the hold. D. the state of the cargo batten.
4.S1:Why are these case planks bulged? S2:I'm sure these are second-hand cases. Q:What's wrong with the cases? A. The case planks are patched. B. the case planks are re-nailed. C. the case planks are dented. D. The case planks are bu.Mats must be used as well in between the cargo battens and the rice bags. A. some bags are stained by water. B. some bags are stained by oil. C. some bags are stained by paint. D. Some bags are stained by the cargo itself.
8. Fill up broken stowage with small stowage. A. Fill up the broken space with small pieces of cargo. B. fill up the broken space with small dunnage materials. C. exchange broken cartons with small pieces of cargo. D. exchange broken cartons with small dunnage materials.
1.S1:What is the grain capacity of the vessel? S2:It is 6,700 cubic meters. Q:What is asked about? A. the grain capacity. B. the bale capacity. C. the hold capacity. D. The grain capacity
2.S1:What shall we do with the damaged cargo if there is any? S2:Just put it aside and let me know at once. Q:What are they talking about? A. how to discharge damaged cargo. B. how to load damaged cargo. C. how to stow damaged cargo. D. how to deal with damaged cargo.
5.We are ready for loading in all respects. A. Everything is ready for loading. B. Everything is ready for unloading. C. We are not ready for loading yet. D. We are not ready for unloading yet.
9.S1:How much deck cargo can the vessel load? S2:The vessel can load 1,500 forty foot containers on deck. Q:What is the loading capacity on deck? A. 1,500 trailers. B. 1,500 cubic meters. C. 1,500 TEUs. D.1,500 forty foot containers.
7.Check careful separation of different lots. A. check if different lots of cargo are carefully stowed. B. Check if different lots of cargo are carefully separated. C. check if different lots of cargo are carefully dunnaged. D. check if different lots of cargo are carefully tallied.
9.Some of the bags are stained by contents 第九题和第十 题弄反了 A. mats must be put below the cargo battens. B. mats must be put below the rice bags. C. mats must be put between the cargo battens and the rice bags. D. mats must be put between the rice bags.
8.S1:How many gangs are going to work in each hold? S2:We'll assign three gangs to your vessel. Two gangs to the main hold and one to hold No.3 Q:How many gangs will work the main hold? A. 4 gangs B. 3 gangs C. 2 gangs D. 1 gangs
3.S1:Check reefer holds for proper loading preparation and report. S2:Reefer holds ready for loading. Q:What should be checked? A. reefer plugs. B. reefer holds C. cargo securing. D. hold ventilators.
4.They'll certainly take safety measures to discharge dangerous cargo. A. They will take precautions in unloading dangerous cargo. B. They will take precautions in unloading dangerous cargo. C. They will take precautions in stowing dangerous cargo. D. They will take precautions in segregating dangerous cargo.