海上钻井英语500句RIG JACKING-DOWN AND LEG-PULLING OUT降船及拔桩1、Everything’s ready for the move? Has the unloading finished?准备工作做得怎么样?卸载做完没有?2、They are working to remove the wedges?现在正在拔桩脚楔块。
3、The derrick has been skidded to the towing position?井架已移到适航位置。
4、Drop NO.2 anchor first,and then No.3.先抛2号锚,后抛3号锚。
5、How far are going to lay out the anchor line?锚缆绳需要放多少?6、Keep five warps on the drum and lay out the rest.尽可能放,滚筒上留5圈。
7、We ’ve got through with the anchors,It’s ready for the boat to connect now.已抛完锚,可以接拖了。
8、Have you got emergency equipments ready for the moving?拖航作业的应急器材准备完了吗?9、The variable load is over the allowable limit. We’ll have to unload the surplus cement,drilling to unload the surplus cement,drilling water and some diesel oil.可变负荷超过允许量了,应该卸掉多余的水泥、钻井水,以及部分油。
10、I s it O.K to jack the rig down today?今天可以降船吗?11、W e can’t jack down the rig as the weather is bad.天气不好,不能降船。
12、T he rig jacking-down is under way now.现在正在降船。
13、T he hull bottom is now the water surface.船体已接触水面。
14、T he draft is 3.5 meters.船体吃水3.5米。
15、L et’s connect the jetting line to jet the legs with 100 psi.接好冲桩管线,用7公斤/厘米2的压力开始冲桩。
16、T he jetting pressure is 100 psi.冲桩压力7公斤/厘米2的压力。
17、A ccording to the requirements wind speed less than force 3 and wave height lessthan 1 meter are considered as the optimum weather condition for the jacking down.按规定,要求风速在3级以下,波高小于1米是最佳的气象条件。
MOVING A JACK UP RIG拖航18、T here will be strong wind,we have to wait on weather.有强风,必须等候天气好转。
19、T he wind speed is 1.5 meters per second and the wave height is less than 0.5 meter todayGreat!今天风速1.5米/秒,浪高小于半米,好极了!20、H ave you worked out the statistical list of variable loads?平台可变负荷统计表搞好没有?21、N ow the Rig is overloaded to the boat?现已超载,需要卸载?22、W hat materials can be unloaded to the boat?哪些物品可以卸载到?23、T he surplus barite, bentonite and cement have to trans-fered to the supply boat.反多余的重晶石,粘土粉和水泥运到拖轮上。
24、T he Rig is short of potable water. Tell the boat to come for transferring water to the Rig.平台生活用水缺乏,让拖轮靠平台打淡水。
25、W here’s the new location? What are the coordinates?交换机井位在什么地方?经纬度多少?26、W hat is our position now?现在船位在哪里?27、W e have got the Rig position at 17:50 hours;108º35ˊEL (east longitude) and 20º45ˊNL (north latitude).17时50分测得船位在:东经108º35ˊ北纬20º45ˊ。
28、W hich tug is responsible for handling the anchors?哪条拖轮负责起抛锚。
29、D rop No.2 and No.3 anchors, right?抛2号和3号锚,对不对?30、W hen do we start jacking the Rig down?什么时候开始降船。
31、W hen do we going to start moving?什么时候开始拖航。
32、T he move is supposed to start at eight thirty.预计8点半起拖。
33、W hich one the main tug? The Binhai 281, it has 8,000HP(horse power).主拖是哪条船?---滨海281,8000马力。
34、w hat’s the moving speed now?现在船速多少?35、A bout 4 knots.4节左右。
36、W e can jack down the platform only when the wind scale is less than 4 and wehave a smooth sea.四级风以下,海浪、海流不急时才可降船。
37、T he speed has slowed down some because the fog is too thick.雾太大,航速成降低了些。
38、W hich one is the chase boat? how much is the horse power?护航船是哪一条?有多大马力?39、I t’s the boat binhai 261. She has 6.000HP (horse power).护航是滨海261船,6000马力。
40、W hat time will we get to the location.什么时候我们可以到达井位?41、A ccording to the present speed the Rig is expected to enter the location area at about 5oˊclock tomorrow morning.按现在的航速,大约明早5时左右进入井位区。
42、T he location buoy is in front over there. .前面就是井位标。
43、W e are ready to drop the anchors.我们已经做好抛锚准备。
44、E verything is O.K.一切都正常。
JACKING-UP AND PRELOADING升降及压载45、W hat’s the air gap to start preloadin g?平台升离水面多少才开始压载?46、W e are not going to preload until the air gap gets to 3 meters.打算升三米再开始。
47、H ow much preload water will have to put into the tanks?压载舱内要加多少压载水?48、W e’ll have to put into 5500 tons of preload water.要加5500吨。
49、W hat way are you going to preload?打算如何压载?50、W e plan to have 3 steps for preloading. Each step will be followed by 30 minutes ofobservation. When the preloading finally finishes. There will be 2 hours for observation.打算分三组压,每组压完观察30分钟,最后压完观察二小时。
51、D o we star preloading right now?现在开始压载吗?52、w e’ll have to adjust the brake torque of jacking motors first so that the legs will jack evenly.先将升降马达的刹车扭矩调匀,这样桩腿升高比较平稳。
53、C an you get it done quickly?很快能调完吗?54、I t will probably take us one and half hours to adjust the 36 motors.36个马达大概要1个半小时。
55、W hen the preloa ding finishes and nothing abnormal is found, then we’ll be ready to drain thewater off.压载完了。
观察无变化,准备放水。
56、W hy has the main engine stopped?主机为什么停机?57、T hey are lowering the raw water tower(deep well pump)now, so only the emergencygenerator can be operated.正在下放海水塔(深井泵),只能开应急发电机。