苹果模具检讨报告范本
Database Release Date & Revision Photo Part Name
3D Date 3D Part No Rev No 2D Date 2D Part No Rev No
DFM Submission Process / Tooling Changes
Date Rev No
Color
Component Cavity Cavity Sub-Insert Core Core Sub-Insert Slide
Cavity PL Core
Slide Line
Parting Line The red line is parting line, the blue line is slide line.
Example: REAR VENT,INSERTMOLDED,MP INTENT,X577 817-01080-02 EVT1 1-
cav DFM01 ( 14 Sep 15 ).ppt
Section
Table Of Contents
Completed Y/N
Y Y Y Y Y Y
Section
Parting Line Concerns/Conditions Post Finishing Operations
Color
Component Cavity Cavity Sub-Insert Core Core Sub-Insert Slide
Slide
The red line is parting line, the blue line is slide line.
1/25/2013 MD Plastic Tooling - Apple Confidential
•
Draft review see picture Wall Thickness review see picture
•
A
A
1.15mm
1.48mm
1.08mm
1.02mm
Section A-A
Color
Draft 0° 2°
There is no draft angle on the green area, propose to decrease materials and make 2°draft angle.
-
For each item/section on the table below, please make sure to place a “Y” or “N” next to it – signifying completion or incompletion. If you put “N” then please explain reason (example: “Does not apply”) When saving the DFM please save in format: Program Vendors Part Name APN Stage Cavity DFM Rev (Date).ppt
Color
Component Cavity Cavity Sub-Insert Core Core Sub-Insert Slide
The blue line is insert line.
1/25/2013
MD Plastic Tooling - Apple Confidential
4 - Surface Finish
Color
Component Cavity Cavity Sub-Insert Core Core Sub-Insert Slide
1/25/2013
MD Plastic Tooling - Apple Confidential
3 - Parting Line Details
• • •
Main parting line (core to cavity) Action witness line (slides, lifters etc.) Any sub-insert line (stationary) see picture
1/25/2013
MD Plastic Tooling - Apple Confidential
3 - Parting Line Details
• • •
Main parting line (core to cavity) see picture Action witness line (slides, lifters etc.) see picture Any sub-insert line (stationary) see page11&12
3 - Parting Line Details
• • •
Main parting line (core to cavity) Action witness line (slides, lifters etc.) Any sub-insert line (stationary) see picture
Plastic Tooling DFM
Date:2015.09.14
DFM Revision:1
--- DO NOT DELETE ANY PAGES FROM THIS DFM --1/25/2013 MD Plastic Tooling - Apple Confidential
Table Of Contents
7.63mm
278.64mm
13.45mm
• •
Cavitation 1*1 Estimated part volume 5.02cm3
14.12mm
1/25/2013
MD Plastic Tooling - Apple Confidential
2 - Draft Check / Observations
Color
Texture SPI-A3 VDI – 18
Comments
817-01080
2015. 09.10
02
2015.0 9.10
02
2015. 09.14
01
1/25/2013
MD Plastic Tooling - Apple Confidential
1 - Project Overview
•
Supplier Name and Location XuHong Kunshan
Completed Y/N
Y N Y Y Y Y
Section
Polishing and Polish Fixtures
Completed Y/N
Y Y Y N 软模先不使用 Y Y
Revision History
Venting
Project Overview
Residence Time Study
3 - Parting Line Details
• • •
Main parting line (core to cavity) see picture Action witness line (slides, lifters etc.) see picture Any sub-insert line (stationary) see page11&12
Color
Component Cavity Cavity Sub-Insert Core Core Sub-Insert Slide
Slide
The red line is parting line, the blue line is slide line.
1/25/2013 MD Plastic Tooling - Apple Confidential
Color
Component Cavity Cavity Sub-Insert Core Core Sub-Insert Slide
Slide
The red line is parting line, the blue line is slide line.
1/25/2013
MD Plastic Tooling - Apple Confidential
Apple Project Number X577 • Part Name Rear Vent Insert Mold Part Number 817-01080
•
288.25mm
• • • •
Resin Type Xantar RC3730 Resin Supplier Mitsubishi Color black Shrink selected 4/1000
Color
Component Core
• • •
Polishing Fixture
Date code location (see PD Part print for location)
Engraving (height / depth / font ; see PD Part print for info.) see picture
1/25/2013
MD Plastic Tooling - Apple Confidential
3 - Parting Line Details
• • •
Main parting line (core to cavity) see picture Action witness line (slides, lifters etc.) see picture Any sub-insert line (stationary) see page11&12 Slide
Ejection
Draft Check/Observations
Mold Base Overview
Part Removal Strategy