当前位置:文档之家› 模具设计评审清单

模具设计评审清单


59
是否依照客户要求设计? Is it compliance with the customers' tooling standards?
60
其它
是否符合投产会的最终定案? Does it accord with the conclusion of the production meeting?
61
39
干涉 顶针杯头是否撞斜顶座单元?
interference Does ejector pin head interfere with connect coupling?
40
镶件、镶针、顶针、直顶孔、斜顶孔、螺丝孔是否碰运水? Are inserts,insert pin,ejector pin,lifter hole and screw hole interfere with water lines?
不 不适 是 Y是 合
N Not fit
2
是否满足模具设计规格书? Is it compliance with the customers' design specification?
3
是否满足客户指定的注塑机要求?
依 据 Can it meet the requirements of customer's Injection machine?
21
顶针撞行位(或油缸行位)是否考虑预复位系统?Has the early return bar been considered to avoid ejector pin interfere with slide?
22
机械锁扣及复位剑是否碰运水进出口及吊模孔等? Is the early return bar devices interfere with water fittings and lifting holes?
10
易扣前模,后模,行位、斜顶等产品是否考虑用防扣模的结构对应? cavity,core,slide and lifter etc are easy to stick mould,whether considering design
11
油缸行位同前模或后模等接触面配合是否已考虑采用擦穿角?Have the mountings of Cylinder and A or B plate beeing considered adopt shut off corner
30
模具无需配合的避空是否已设计? Have the clearance for no fitting area been designed?
31
三模板导柱及其各行程是否足够? Are the stroke of guider pin and others of 3 plates enough?
32
4
foundation 是否跟足客户或项目工程师分模线,入水位置,顶出方式等指示?
Is it compliance with the instructions of parting line,gate position and eject mode
5
是否跟足开模评审意见? Does it follow the instruction of mold review meeting?
管理室
有限公司制造中心
模具设计评审清单
评审人员Authorized
Participants:
Mould design check list
(结构装配图&正式装配图评审)
工程师Engineer
模号 NO.
日期 Date


分类
问题描述
NO Item
Questions Description
.
1
是否跟足客户模具设计标准? Is it compliance with the customers' tooling standards?
54
Drawing 行位,压条,耐磨板,耐磨片,定位圈等非3D设计的零件尺寸标注是否齐全?
Are slide,heel blocks,wear plate,location ring etc parts all dimentioned?
55
装配图配套零件图是否齐全? Are the assembly drawing and spare parts drawing ready?
43
冷却水的进出口朝向是否OK? Are the direction IN and OUT of waterline ok?
44
冷却 是否确保运水胶圈不碰内模边倒角等? Cooling Are "O"rings beyond the chamfered corner of core?
45
深呵地方是否已考虑冷却? Has additional cooling been considered for thick areas?
与会人员签名Sign:
49
是否对PRO-E分型后内模基准角? Have datum of core and cavity been confirmed?
52
是否跟足客户的模具批核意见? Have final decision been approved by customer?
53
图纸
各剖图是否已清晰表达料位及枕位的最高及最底点?Are all cross sections express the highest and lowest of plastic and pi模螺丝大小、位置是否合理?
Are the size and position of the core screw reasonable?
16
压座,勾腿的强度是否足够? Are the strength of ejector coupling and connector enough?
6
是否已参考客供模图或以往同一客户的模具设计图? Does it follow the customer's drawing?
7
模具结构是否合理? Are mould structure reasonable?
8
上、下模分模面是否合理? Are parting line reasonable?
9
结 构 行位、斜顶、缩哥大小是否合理? structure Are the slides, lifter,movable core reasonable?
17
前后模的支撑柱大小及数量是否合理? Are the stand-off size and quantities enough?
18
顶针、顶块等出模设计是否考虑充分? Have ejector pins and ejector bar etc ejection system been considered?
19
是否已考虑大斜度斜顶运动的稳定性? Has the stability of the movement of huge angle lifter been considered?
20
开模及合模的顺序控制是否 OK?Is the sequential control of mold open and clamping ok?
28
模具组件装配顺序是否已论证OK? Is the sequence of assemble mould ok?
备注 Remark
TBD
29
油缸选择是否合理(力量、大小、固定方式、行程余量)?Has the cylinder been chose reasonably(strength,size,clamp type and stroke)
23
朝上行位弹弓是否够力? Is the lower slide strength enough?
24
功 能 是否已做整套模具的运动过程分析? Function Have all the movement of mould been analyzed?
25
热流道系统或热咀系统选择是否合理(包括热咀腔尺寸)? Are the hot runner system or hot nozzle system reasonable?
顶出行程是否充分? Is the ejection stroke enough?
33

行位行程是否足够?
程 Is the slide travelling enough?
34
Stroke 斜顶行程是否足够?
Is the lifter travelling enough?
35
斜缩呵行程是否足够? Are the movable cores travelling enough?
36
机械锁扣及行程螺丝行程是否足够? Are the latch and shoulder screw travelling enough?
37
是否确保司筒不碰KO孔? Are sleeve pins interfere with KO?
38
行位、斜顶是否撞顶针、斜顶、直顶等? Are slide and lifter interfere with ejector pin,lifter etc?
26
INSERT五金或塑胶件的模具是否考虑安装稳定性、简易性、安全性? Have the stability,simplicity and safety of instert mould been considered?
27
特殊结构的模具设计是否有充分论证? Is enough proof for special mould design?
56
材料明细表(BOM)是否正确? Is the material lists correct?