和润新城·畅远3#楼外墙保温施工方 案编制人: 审核人: 审批人:1目录1 编制依据··············································································32工程概况··············································································33 材料性能及要求·······································································34 施工条件环境要求····································································55 施工机械及工具 ······································································56 工艺流程 ···············································································66.1 基层清理············································································76.2 吊顺直线············································································76.3 配制水泥砂浆 ······································································76.4 水泥砂浆抹灰施工 ································································76.5 配制粘结砂浆·······································································76.6 排板···················································································86.7 粘贴聚苯板施工····································································96.8 施工要点·············································································106.9 特殊部位施工·······································································126.10 锚固件安装·········································································196.11 抹面层施工··········································································196.12 质量控制·············································································207 人力资源管理·················································································208 安全生产保证措施 ···········································································2029 文明施工及成品保护········································································221、编制依据1.1 《外墙外保温施工技术规程》(JGJ144-2004); 1.2 《筑节能工程施工质量验收规范》(GB50411-2007); 1.3 《筑装饰装修工程施工质量验收规范》(GB50210-2001); 1.4 和润新城.畅园3#、5#楼施工图纸及施工组织设计。