xxx engineering contract XXX工程合同
Contract No. :1
合同编号:
Party A: xxxCompany Limited
甲方: xxx有限公司
Party B:xxx Company Limited
乙方:xxx有限公司
This contract is made and entered into on the day of , 2014 by the fol lowing Parties
in
本合同于2014年月日由以下当事方在签署。
Party A: xxx Company Limited,
甲方:xxx有限公司,xxx经营的公司,住所地为XXX,(下称“甲方”),法定代表人:XXX
Party B: xxx Company Limited,
乙方:xxx有限公司,一家XXX经营的公司,注册地址是:XXX,(下称“乙方”),法定代表人:XXX
Party A and Party B are called by a Joint name of Both Parties under this contract, each of
which is cal led as A Party.
甲方和乙方在本合同项下统称为“双方”,单独称为“一方”。
Work Content and Requirements
工作肉容、要求
1.1In accordance wi th the i toms stipulated in this Contract, Party B shal1 conduct the project as per the Project standard
and quality standard stipulated by Ministry of Engineering of the Union of xx.
依据本合同所限定的条款、乙方应以XX工程部规定的建筑标准和质量要求执行本工程。
■I
Contract Period
含同期限
2.1Work period for the Road Construction Project: the work shal1 be completed within 2 month upon signing the Contract.
The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection.
2.1本次工程吋间周期:合同签订后M个工作日内完成、并以甲方组成的竣工验收小组现场检验并出具验收单为竣
工交接条件。
2.2 This contract shall be implemented after this is duly signed by the legal representatives or author!zed representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite acceptance of the Project and Contract paymcnt.
2.2 本合同自双方法定代表人或授权代表人签字盖章后生效,现场验收合格、款项支付完毕后关闭。
3. Health, Safety and Environtnent Principles (USE):
、安全和环境原则(HSE )
3.1 The staff from Party B shal1 fol low the arrangement of Local government and Party A (or its representatives), and comply
with the laws and regulations of Myanmar as well as rules and regulations on Health, Safety and Environment (HSE) of Party A.
3.1乙方工作人员必须听从地方政府、甲方人员(或代表)的安排,遵守缅甸法律、法规和甲方的安全 环境健康规章制
度等。
As per the stipulated construction contents t both Parties agree that this Contract is a lump sum contract. The contract payment includes all construction costs and related
cost for construction preparation and construction implementation .Please refer to the
following table for the details
按照本合同所确定的工程内容,甲方与乙方确定本次马德岛岗亭工程为费用总包合同,合同费用包 含全部工程施工费用及其他与工程准备、工程执行相关的费用。详见下表
3.2
Before or during the implementation of this Project, Party B shal1 acknowledge, avoid 3.2
and prevent the possible damage of the Project to other affiliated facilities, and the resulting losses the surrounding environment and shall be borne by Party B.
在工程实施之前或进行当中,乙方应识别工程可能对周边环境及原有设施造成的危害,应进行规避 和防护,对由此带来的损失,应由乙方承担。
3.3 During the performance of this Contract, Party B shall bear the personal and property
losses of Party B or Party B' s personnel injury by itself, if the losses are not caused by Party A.
3.3在合同履行过程中,若发生非甲方原因导致的乙方或乙方人员人身或财产损失的,由乙方自行承担。
4. Contract Price, Payment and Taxes 4.
合同价格、.付款学宜及税费
4.1 4.1