FIDIC合同与我国建设合同重要时限中英文对照表

FIDIC 合同管理事项

The items of CM

承包人以书面形式将监理工程师的口

头指令变为书面指令的时限

The time limit that the contractor changes the oral instruction into the

written instruction with the written form

监理工程师向承包人免费提供设计图纸及相关资料的时限

The time limit that the engineer freely provides the disign drawing and

related information

监理工程师应向承包人提供原始基准点等资料的时限

The time limit that the engineer shall provide the contractor the imformation about the original points.

在一般情况下组织开始交工验收(竣工检验)

The time limit that start to organise the project checking and receiving(test

on completion)

颁发交工(移交)证书的时限

The time limit that issus the taking-over certificate

缺陷责任期的时限

the time limit of the defects liability periods

雇主提出已经做出资金安排的时限

the time limit of the Employer's financial arrangement

雇主替换工程师的时限

the time limit of the replacement of the Engineer

承包商提交履约保证的时限

the time limit of delivering the Performance Security to the Employer

承包商将履约保证有效期延长至工程竣工和修补完任何缺陷的时限 the time limit of extending the validity of the Performance Security until the Works have been completed and any defects have been remedied.

雇主应对履约保证提出索赔的时限

the timelimit that the Employer shall make a claim under the Performance Security

雇主退还履约保证给承包商的时限

the time limit of returning the Performance Security

雇主退还履约保证给承包商的时限

the time limit of returning the Performance Security

承包商将现场拟定各分包商开工日期通知工程师的时限

the time limit that the Contractor five the Engineer the notice of the commencement such work on the Site

承包商将生产设备或其他主要货物运到现场的日期通知工程师的时限the time limit that the Contractor shall give the Engineer the notice that any Plant or a major item of other Goods will be delivered to the Site

月进度报告报告时间时限

the time limit of monthly progress reports

工程师将参加试验的意图通知承包商的时限

the time limit of the notice of the Engineer's intention to attend the tests

工程师向承包商发出开工日期通知的时限

the time limit of the Endineer's notice of the Commencement Date

开工日期的时限

Commencement of Works

承包商向工程师提交一份详细的进度计划的时限

The Contractor shall submit a detailed time programme to the Engineer

工程师向承包商发出通知指出在进度计划中不符合合同要求的部分的时限

Engineer gives notice to the Contractor stating the extent to which it does not comply with the Contract

承包商可以要求工程师对已暂停的工程允许继续施工的时限

the Contractor may request the Engineer's permission to proceed

承包商有权得到尚未运到现场的生产设备或材料的价值付款的时限the time limit that the Contrctor shall be entitled to payment of the value

受暂停影响的工程部分视为删减项目的时限

the time limit of treating the suspension as an omission

承包商将他可以进行每项竣工试验的日期通知工程师的时限

the time limit of the Contractor's notice which ready to carry out each of the Tests on Completion

竣工试验进行的时限

the date of the Tests on Completion

如果承包商不当地延误了竣工试验,承包商进行下一次竣工试验的时限

the time limit that the Contractor carry-outs the Tests which were unduly delayed by the Contractor

雇主人员可自行进行竣工试验的时限

the time limit that the Employer's Personnel may proceed with the Tests

承包商向工程师发出申请接收证书的通知的时限

the time limit taht the Contractor may apply by notice to the Engineer for a Taking-Over Certificate