当前位置:文档之家› DELMIA工艺仿真操作流程

DELMIA工艺仿真操作流程


DASSAULT SYSTEMES Confidential Information Secured - Date
PaБайду номын сангаасe
Process Structure工艺结构
Step 1第一步 Create a structure as shown创建如图的结构 Create Process View, Assembly Process plan, Assembly plan, Work Plan according the PTS designed. 根据PTS建立Process View, Assembly Process plan, Assembly plan, Work Plan 节点
Simulation of Critical Assemblies in V5 ,V5下 关键装配的仿真 Documentation 1. Generate Process Documents创建 工艺文档
DASSAULT SYSTEMES Confidential Information Secured - Date
Page
Summary of activities
Create station Plans and sequence them according to Precedence. 创建station Plans 节点,并且根据逻辑关系排列它们 Create Operations under each station Plans and sequence them according to Precedence.在station Plans 下面创建操作,并且根据逻辑关系排列它们 Detail each operation unit. 每个操作需细化的内容 Car body positions车身的位置 Work height操作高度 Station linkage from工位连接接入 Station linkage to工位连接接出 Attribute Viale(Automatic operation: yes or No)特征(是否是自动操作) )创建用于线平衡的 Create workplan for Balancing(operations list of all stationplans stationplans) workplan节点(所有stationplans 的操作清单) Link Parts to Process.将产品部件连接到工艺节点上 Line Balancing线平衡 Import Line balancing configuration (one time administrator activity for one project). 导入线平衡的配置表(管理员为一个项目做一次) Create line in resource view.在resource view下创建一个线 Execute Automatic Line balancing.执行自动线平衡 Fine tune the line in ALB.在ALB下优化线 View & save ALB reports.预览并保存ALB的报告 bins/Shelfs .将产品链接到料箱料架 Link Parts to Part bins/Shelfs Shelfs. Create create Balanced line work plan for 3DSimulation ,validation /Verification/Analysis of Station in DELMIA V5. 创建已平衡的生产线的work plan 节点,用于3D仿真,用于V5下工位验证分析
Page
Double Click on the Button to Launch Process Engineer 双击此按钮,加载 DPE
DASSAULT SYSTEMES Confidential Information Secured - Date Page
> <UserName UserName> <Password>
DASSAULT SYSTEMES Confidential Information Secured - Date
Page
Import product导入产品数据
Please refer product import document 请参考产品数据导入的文档
DASSAULT SYSTEMES Confidential Information Secured - Date
DASSAULT SYSTEMES Confidential Information Secured - Date
Page
Process Structure Creation … Contd工艺结构的创建
Calculate throughput Time. 计算操作时间 Enter this throughput Time as Estimated time of the Fitment.给操作输 入预定义时间
X:\ Drive mapped to Data Directory //plmpox03\proj\mfgcaddata
Report/Documentation Directory
Formats For Report Generation报表的格式
Images Directory for Report related Bitmaps 报 表上相关的 bmp图片文件 PLO Related Data PLO相关的数据
Page
Step 1 – Copy the Master Project 复制“主”项目
To Create new project copy master /template project. 创建一个新的“主项目”或者“模板项目”的复件 ’t create project if not necessary. The data base expands to a huge size. Don’ Don 没有必要创建新的项目,数据库会变得很大
Step 2第二步 Open Process Graph for the Work Plan. 打开Work Plan节点的 Process Graph Create Station work plan and operation quickly and easily. 可快捷地 创建Station work plan 和 operation Enter name Number and estimated time for each operation. (No need for station plan.)给每个operation创建编号和定义一个时间(无需 给station plan创建) Planners will plan processes for all lines for one variant under work plan.工艺规划员将在work plan节点下规划一个车型的所有生产线 Planners will reuse the work plan for other variants making modifications to operations where necessary. 工艺规划员将重复使用 work plan用于其他变型车,在一些必要的地方修改operations
Import Product Data 导入产品数 据
Import Resource Structure输入资 源结构 1. Create Tooling, gauges & Fixtures in DPE Library. 在 DPE的库中创建工具、工装、 夹具
Link Product and Resource Structure , (Partbins Partbins, Trolleys, Racks)链接产品 和资源的节点( 如料箱、小车)
Procedure for FA PROJECT 总装项目工作流程
Kumar 姜中春
Project Preparation项目准备工作
CAD File System and Directory structure for PLO ’s and reports Resource CAD data, Product CGR CGR’ generated for Planning. CAD文件和资源的结构 Machine Setup. 电脑设置好 Project Structure Creation in Delmia Process Engineer. DPE的项目的结构
Create Process Structure创建工艺结构 1. 2. Set Estimated Time预定义时间 Enter Quality data & others 输入 质量控制信息或者其他信息 Link Product & Process链接产 品和工艺节点 Line balancing 生产线平衡 1. Create work plan for balancing给生产线平衡 plan ”节点 创建“work plan” 2. 3. 4. Create process Graph. 创建操作之间的逻辑关系 图(鱼刺图) Execute ALB & Tune the result.执行ALB 并调 整结果 Create Balance WorkPlan .创建“Balance WorkPlan. WorkPlan节点”
DASSAULT SYSTEMES Confidential Information Secured - Date
Page
Process Structure Creation … Contd工艺结构的创建
Open Process Graph for the. 如左图,打开Fitment的 Process Graph 界面 Create precedence links between operation units with Precede” relation.用 “Must Precede” Must Precede关系创建操作之 间的先后连接关系