乌兹别克斯坦电力规划
• • •
•
•
9
«Cascade Tashkent HPP»
• Consist of 4 HPP (HPP-3,11,12,15), located at Chirchik– Bozsuv river. Installed capacity – 29 МW. Commissioning periods 1926-1954. «Modernization of Cascade Kadiria HPP UE» (HPP1,21,4,9). Increasing the efficiency of equipment. Expected cost of the project is 10 mln US dollars. Implementation period 2011-2013.
Capacity: 81 MW (3x27 MW) Power generation: 450 mln. kWh per year Construction period: 2009-2012
Before modernization Capacity: 30 MW Generation: 165 GWh per year
After modernization Capacity: 422 MW(taking into account dismantling of 212 MW capacity ) Generation: 700 GWh Specific fuel consumption: 390,0 gr/kWh
Power unit №1 turbine №2 turbine №3 turbine №4 turbine №5 turbine №6 turbine №7 turbine №8
STATE JOINT-STOCK COMPANY “UZBEKENERGO”
Electric power industry of the Republic of Uzbekistan: a current situation and development prospects
About the Company
After extension Capacity: 1600 MW Generation: 10.5 TWh per year Specific fuel consumption: 256,5 gr/kWh
UzFRD credit – 230 D foreign loan – 280 mln. USD
2
TECHNICAL AND ECONOMIC INDICES
Structure of installed capacities of power plants of Uzbekistan
Structure of Electrical networks
3
TECHNICAL AND ECONOMIC INDICES
Pay-off period: 9 years
5Hale Waihona Puke 2 CCPP construction at Talimardjan TPP
Equipment in operation Capacity, MW 800 Comiss ioning 2004
Capacity: 2х400 MW Power generation : 4,8 bln. kWh per year Construction period: 2010-2014 Commissioning Unit №1 – 2013 Commissioning Unit № 2 – 2014
N o The energy sector name Quantity of realized projects, piece 8 15 1 12 2 Entered capacity Cost ( mln. dollars) 2309,6 512,9 1,85 681,4 70,7
1 2 3 4 5
6
Turbine unit installation at Angren TPP
Project goal: using coal with 45% ash content in a volume 800-1000 thousand tons per year Cost estimate:150,0 D Capacity: 2*75 MW Construction period: 2012-2014 years Financing source: loan - 150 D
Total
38
3575,1
4
3 gas turbine units construction at Tashkent Heat and Power Plant
Equipment in operation Name Steam turbine Capacity MW 30 commission ing 1954
Name Power Unit №1
Before extension Capacity: 800 MW Generation: 4,7 TWh per year Specific fuel consumption: 314 gr/kWh
Cost estimate: 710 D Pay-off period: 13 years Finance sources: SJSC “Uzbekenergo” means – 200 mln. USD.
Thermal power stations Hydro power stations Nonconventional power (wind) Electric networks The other
2255 MW 440 MW 0,75 MW 1418,2 km, 1754 МVА ATE (1 stage), ash-and-slad removal – 7,5 million in cubic m 2695,7 MW generating capacities 1418,2 km of transmission lines 1754 МVА transformer capacities
Cost estimate: 142,0 D Finance sources: SJSC “Uzbekenergo”means – 47,8 D foreign loan – 94,2 D
After modernization Capacity: 111 MW Generation: 450 GWh per year
120 90 30 331,6
148,9 115,6 33,3 388,0
8
«Cascade Kadiria HPP»
• Consist of 4 HPP (HPP3,11,12,15), located at Chirchik– Bozsuy river. Installed capacity– 44,6 MW. Commissioning periods 1933-1946. «Modernization of Cascade Kadiria HPP UE» (HPP-15,11,3,12). Increasing the efficiency of equipment. Expected cost of the project is 19,5 mln US dollars. Implementation period 2011-2013.
7
Hydro Power Plants are planned for construction till 2015 year
„• „• Tashkent region 1. 2. 3. 4. 5 Nizhnechatkal HPP at Chatkal river Akbulak HPP at Akbulak river Kamchik HPP at Akhangaran river Irgayliksayskaya HPP at Ugam river HPP “Kamolot” at Chirchik- Bozsu canal Syrkhandarya region 5. 6. Zarchobskaya HPP at Tupalangdarya river HPP Niluy-II at Total Sangardakdarya river ‡‚ / HPP name Capacity to be commissioned, MW 211,6 100 60 30 13,6 8 Estimate cost mln. USD 239,1 105,5 62,8 34,5 25,0 11.3
Structure of fuel consumption by power plants
Structure of installed capacity of power transformers
4
The program of measures on realization of the major projects on modernization, technical and technological re-equipment of electric power industry for 2009-2014 years
• The Power Industry of Uzbekistan operates in the framework of the State Joint Stock Company ”Uzbekenergo”, established in the form of open joint stock company including the Coal Industry enterprises since 2001. • The company structure includes 53 enterprises and organizations, including 39 open joint-stock companies, 11 unitary enterprises, 2 societies with limited liability and company branch-“Energosotish”. • As for now, the company performs the centralized electric power supply of national economy and population, and also sale of thermal energy to industrial and domestic consumers in distinct cities of the Republic. • The installed capacity of Power Plants of Uzbekistan exceeds 12,3 GW equal to 50% of all generating capacities of the Interconnected Power System of Central Asia • The Power Industry’s enterprises annually generate up to 48 TW/h of electric and more than 10 mln. Gcal of thermal power.