PROJECT CONSULTANCY CONTRACT 项目顾问合同
For ()project
Between
XXXXXX
represented by Mr.
hereinafter referred to as “” -
甲方:有限公司
代表人:
(以下简称甲方)
and
XXXXXXX
Mr.
Amsterdam
The Netherlands
represented by Mr.
hereinafter referred to as “”–
乙方:
代表人:
(以下简称乙方)
1. Terms of the contract 合同条款
XXXXX authorizes XXXXX to implement the consultancy to the preliminary design concept of XXXXX project, and to assist XXXXX in completing preliminary design drawings.
甲方授权委托乙方执行其在XXXXX展示工程初步设计概念的顾问工作,并帮助甲方完成初步设计稿。
2. Project stages 项目阶段
The project shall be carried out in cooperation and in close guidance by the XXXXXX. The general consulting plan shall be provided before the design starts, a detailed plan shall be sent to XXXXX after each biding conference or press release meeting as follows: An idea explanation presentation shall be showed within 7 days after the tender starting date. A draft design drawing shall be submitted within 7 days after the first presentation
meeting between XXXXXXXX and XXXXXXXX. Following the meeting of draft design drawing, a number of amendments requested by X shall be carried out. The final presentation of the preliminary design shall be submitted within 3 days before the bidding deadline to assist XXXXX in completing the tendering documents.
本项目应在相互合作以及吸取XXXXX指导方针的前提下开展。乙方应在设计前期提供整体咨询计划书,每次招标或信息发布大会后,乙方也应按如下提供详细计划:投标开始后的七日内向甲方展示初步设想;设想探讨会议结束后的七日内递交设计草图,递交后,乙方须执行甲方的修改要求;最终初始设计稿应在招标截止期前三天内交予甲方,从而帮助甲方整理其投标文件。
3. Term of validity 合同效力期限
The consultancy contract shall apply from 1 Jan 2011 to 31 December 2012.
此项目顾问合同适用于2011年1月1日至2012年12月31日。
4. Force Majeure 不可抗力
“Force Majeure” under the contract means the external circumstances that can not be foreseen, avoided and surmounted in the process of fulfilment of the contract, the incidents of which makes either party fails to fulfill the obligations under the contract, such as wars, riots, government behaviors, earthquake, fire, storms, floods or other severe weathers.
本合同下的“不可抗力”是指在执行合同的过程中不能被预见、避免、克服的外在因素,从而导致合同任意一方无法履行合同责任,如战争、暴乱、政府行为、地震、火灾、风暴、洪水或其他恶劣天气。
The period required to complete the obligations shall be extended accordingly due to the affect of the force majeure, the extension shall be the same as the period of time affected by the force majeure or the period of time is agreed upon both parties.
由于不可抗力造成的影响,履约责任期可被相应延长,延长期应与不可抗力的影响期相同或通过双方协商确定。
5. Intellectual Property Rights and confidentiality知识产权与保密
XXXXX shall ensure that the results of his design are not with any flaw to any right and none of the rights of third parties is impinged, and shall ensure that XXXXX is not claimed by any third party for using XXXXX's design results to be against the intellectual property rights. Should the case above occur, XXXXX shall be responsible for disposing and assuming all legal liabilities arised therefrom.
乙方应确定其设计不存在任何所有权瑕疵,不会牵涉到任何第三方的权利,并保证甲方不会因使用乙方的设计而产生侵权赔偿。如果发生上述情况,乙方应负责处理所有因此造成的法律责任。