当前位置:
文档之家› Lean Production精益生产介绍
Lean Production精益生产介绍
1. 2. 3. 4. 5. 6. 7. 8. 9. Flexible resources Cellular layouts Pull production system Kanban production control Small lot production Quick setups Uniform production levels Total productive maintenance Supplier networks
Copyright 2006 John Wiley & Sons, Inc.
15-10
Cells with Worker Routes
Copyright 2006 John Wiley & Sons, Inc.
15-11
Worker Routes Lengthen as Volume Decreases
waste, anything other than that which adds value to the product or service
Muda
Copyright 2006 John Wiley & Sons, Inc.
15-3
Waste in Operations
Copyright 2006 John Wiley & Sons, Inc.
Lecture Outline
Basic Elements of Lean Production Benefits of Lean Production Implementing Lean Production Lean Services
Copyright 2006 John Wiley & Sons, Inc.
Q = order quantity R = reorder point - demand during lead time
Copyright 2006 John Wiley & Sons, Inc.
15-16
Types of Kanban
Production kanban
Signal kanban
15-22
Small Lots
Require less space and capital investment Move processes closer together Make quality problems easier to detect Make processes more dependent on each other
15-2
Lean Production
Doing more with less inventory, fewer workers, less spaceBiblioteka Just-in-time (JIT)
smoothing the flow of material to arrive just as it is needed “JIT” and “Lean Production” are used interchangeably
N d L S C
= number of kanbans or containers = average demand over some time period = lead time to replenish an order = safety stock = container size
15-21
Copyright 2006 John Wiley & Sons, Inc.
Copyright 2006 John Wiley & Sons, Inc.
Determining Number of Kanbans: Example
d L S C = 150 bottles per hour = 30 minutes = 0.5 hours = 0.10(150 x 0.5) = 7.5 = 25 bottles
Cycle time
Takt time
Copyright 2006 John Wiley & Sons, Inc.
15-8
Standard Operating Routine for a Worker
Copyright 2006 John Wiley & Sons, Inc.
15-9
Cellular Layouts
External setup
Separate internal setup from external setup Convert internal setup to external setup Streamline all aspects of setup Perform setup activities in parallel or eliminate them entirely
Copyright 2006 John Wiley & Sons, Inc.
15-23
Inventory Hides Problems
Copyright 2006 John Wiley & Sons, Inc.
15-24
Less Inventory Exposes Problems
Copyright 2006 John Wiley & Sons, Inc.
15-17
Material kanban
Kanban square
Supplier kanban
Copyright 2006 John Wiley & Sons, Inc.
Copyright 2006 John Wiley & Sons, Inc.
15-18
Copyright 2006 John Wiley & Sons, Inc.
15-26
Move time
Waiting time
Setup time
Copyright 2006 John Wiley & Sons, Inc.
Quick Setups
Internal setup
SMED Principles
Can be performed only when a process is stopped Can be performed in advance
Copyright 2006 John Wiley & Sons, Inc.
15-14
Sample Kanban
Copyright 2006 John Wiley & Sons, Inc.
15-15
Origin of Kanban
a) Two-bin inventory system Bin 1 Kanban Bin 2 Reorder card Q-R R R b) Kanban inventory system
Copyright 2006 John Wiley & Sons, Inc.
15-7
Flexible Resources
Multifunctional workers
perform more than one job general-purpose machines perform several basic functions time required for the worker to complete one pass through the operations assigned paces production to customer demand
Copyright 2006 John Wiley & Sons, Inc.
15-12
Pull System
Material is pulled through the system when needed Reversal of traditional push system where material is pushed according to a schedule Forces cooperation Prevent over and underproduction While push systems rely on a predetermined schedule, pull systems rely on customer requests
15-19
Copyright 2006 John Wiley & Sons, Inc.
15-20
Determining Number of Kanbans
No. of Kanbans =
average demand during lead time + safety stock container size dL + S N = C where
15-4
Waste in Operations (cont.)
Copyright 2006 John Wiley & Sons, Inc.
15-5
Waste in Operations (cont.)
Copyright 2006 John Wiley & Sons, Inc.
15-6
Basic Elements
authorizes production of goods
Withdrawal kanban
authorizes movement of goods
a marked area designated to hold items