当前位置:文档之家› 7步工作法 8D 模板

7步工作法 8D 模板


Section E: Failure Scenario失效分析
Worst Case Failure Scenario最差的失效情况: Is this an Emissions Related Failure 是排放 相关的失效: Estimated Cost per Engine for most likely failure估计单台成本
Section C: Start of Problem 问题开始时间
When did problem start in the mfg. process 问题什么时候在生 产过程发现 If a supplier problem, when was material first received at 如果是 供应商问题, 什么时候发现? Supporting logic for the start date 开始时间 If a Engine problem, when was engine first received at customer 如果是发动机问题,客户什么时候 发现?
Section G: Recommended Action 建议行动
For IN-HOUSE Engines 库 存发动机处理 For PARTS DISTRIBUTION Inventory 零件库存 For OEM Engines OEM 发动机处理 Finished Date and Responsibility 计划检验完成时间及责 任人
Section H: Follow-up/Interim Action Assignments Action Resp. Plan Date
Section D: End of Problem问题结束时间
When was condition corrected in production 问题什么时候解决? What action was taken 采取了什么行动? ESN First: 第一个ESN
PIC Report
Team Member: 小组成员 Prepared by: 起草人
PIC No: Date: 时间
Section A :Problem Description 问题描述
Part Number (s) affected 影响的零 件号: Problem Description (Word) 问题文字描述: Part or Process Name零件或过程 名称 Part Batch or Engine No. 零件批 次或发动机号
F08-077A0
Most Likely Failure Scenario最可能的失效:
Section F: Possible Reasons可能原因
Pictures Description 图片描述
Байду номын сангаас
Section B: First Noted 第一次发现
When was the problem found 问题什么时候发现? If supplier identified, when was notified 如果供应商发现的, 何 时被通知 Who identified the problem 谁发 现问题? If Customer identified, when was notified 如果客户抱怨的, 何时被 通知
相关主题