Tran slatio n:
Construction Contract
Party A: __________________ (Developer)
Party B: _________________________ (Contractor)
This con tract is sig ned by the two Parties Party A and Party B accordi ng tothe Con tract Law of the Peoples Republic of Chi na, the Con tracti on law of the Peoples Republic of China , and other releva nt n atio nal laws and regulati ons, as well as the specific n ature of this project. On the basis of hon esty and credit, equality, volun tari ness, party A and party B have reached consen sus through n egotiati ons and sig ned this con tract.
1. Project Introduction
1.1 Name of Project:—
1.2 Locatio n of Project: From to .
1.3 Scope and content of the project一
1.4 The desig n of con structi on drawi ngs: __________________________ .
2. Nature of Con tracti ng: Con tract for labor and materials .
3. Construction period
This project will take 20 days after the receive of the beg inning no tice from Party A (in clud ing recepti on time after completi on ),a nd in cludi ng the beg inning date and completi on date.
4. Quality of Project
Quality of Project: qualified ___ .
5. Contract Amount
5.1 Con tract Amount: be RMB 400,000 Yua n ten tatively (The actual settleme
nt shall prevail).
5.2 Adjustme nt of con tract amoun t: .
6. Final Audit of the project
6.1 The condition and steps for Party A pay the project funds to Party B:
Party A agrees to pay Party B for RMB150,000Yua n three days after the beg
inning of the project,the bala nee will be paid 97% after the qualified
completi on, and 3% warra nty guara ntee fee will be paid one years if there
is no quality problem.
6.2 Mode of payme nt: .
s each perio 6.3 Party B shall submit to Party A equivale nt inv oice before Party A
payme nt, otherwise, Party A can refuse to pay un til the recei ving of the
Party B inv oice.
6.4 The inv oice provided by Party B should be valid. Any falls inv oice
provided by Party B which are found by releva nt office, the Party B should
not only provide the valid inv oice to Party A, but also bear the resp on
sible caused by the in valid inv oice.
7. Variation of design and visa
7.1Duri ng the process of the project, any con tract list, tech no logy check
ing list ( not in clude the variatio n, additi on, substituti on, and reducti
on on the draw in gs a nd project fee) concerning about this project shall
only be regarded as effective with the confirmation of the representative
Party A in writing.
7.2 Any variati on no tice list, tech no logy check ing list, con tract list,
tech no logy check ing list ( in clude the draw ings desig n) concerning
about this project shall on ly be regarded as effective with the con firmatio
n of the seal of Party A.
7.3 In the eve nt of Party B fails to complete the project accord ing to the
draw ing
variati on, Party B shall pay __ to Party Aas pen alty for the breach.Party B
will
also bear the resp on sible and the rework ing fee caused by the con ti nued
work ing regardless of the new desig n.
7.4Party B shall take full responsibility for any loss caused by delaying for
more than days appl ying for exte nsion vise from Party A days after the
recei ving of
cha nged desig n.