篇一:完整工程施工合同英文版
Translation:
constructioncontract
partyA:(Developer)
(contractor)
ThiscontractissignedbythetwopartiespartyAandpartyba ccordingtothecontractLawofthepeople’sRepublicofchina,thecontractionlawofthepeople’sRepublicofchina,andotherrelevantnationallawsandreg ulations,aswellasthespecificnatureofthisproject.ont hebasisofhonestyandcredit,equality,voluntariness,pa rtyAandpartybhavereachedconsensusthroughnegotiation sandsignedthiscontract.
1.projectIntroduction
1.11.21.31.4Thedesignofconstructiondrawings:
2.natureofcontracting
3.constructionperiod
(includingreceptiontimeaftercompletion),andincludin gthebeginningdateandcompletiondate.
4.Qualityofproject
5.contractAmount
5.15.2
6.FinalAuditoftheproject
6.1TheconditionandstepsforpartyApaytheprojectfundst opartyb:
6.26.3partybshallsubmittopartyAequivalentinvoicebef orepartyA’
seachperiodpayment,otherwise,partyAcanrefusetopayun tilthereceivingofthepartyb’sinvoice.
6.4Theinvoiceprovidedbypartybshouldbevalid.Anyfalls invoiceprovidedbypartybwhicharefoundbyrelevantoffic
e,thepartybshouldnotonlyprovidethevalidinvoicetopar tyA,butalsobeartheresponsiblecausedbytheinvalidinvo ice.
7.Variationofdesignandvisa
7.1Duringtheprocessoftheproject,anycontractlist,tec hnologycheckinglist(notincludethevariation,addition ,substitution,andreductiononthedrawingsandprojectfe e)concerningaboutthisprojectshallonlyberegardedasef fectivewiththeconfirmationoftherepresentativepartyA inwriting.
7.2Anyvariationnoticelist,technologycheckinglist,co ntractlist,technologycheckinglist(includethedrawing sdesign)concerningaboutthisprojectshallonlyberegard edaseffectivewiththeconfirmationofthesealofpartyA.
7.3Intheeventofpartybfailstocompletetheprojectaccor dingtothedrawingtopartyAaspenaltyforthebreach.party bwillalsobeartheresponsibleandthereworkingfeecaused bythecontinuedworkingregardlessofthenewdesign.
7.4partybshalltakefullresponsibilityforanylosscause dbydelayingformorethandaysapplyingforextensionvisef rompartyAchangeddesign.
8.AcceptanceandFinalAuditoftheproject
8.1Acceptanceoftheproject
8.1.1Thisprojectshouldmeetthenationalqualityaccepta ncestandardsandshouldbeacceptedatthefirstinspection aftercompletion.TheQualityAcceptancecriteriaofconst ructionofnationmustberegardedastheacceptancestandar dsfortheproject.partybshallinformpartyAinwritingofa llkindsofinspectionandacceptancewithidays.
workingdaysafterreceivingthenotification.
8.1.2partybshallberesponsibleforthere-inspectioncos t,andtheprojectperiod
shallnotbeextended.
8.2FinalAuditoftheproject
Iftheresultofre-inspectionhaspassedacceptancestanda rds,partybshallsubmittheauditreportandmaterialstopa rtyAforverificationwithin