建筑合同architecture confirmation

甲方:party a : 乙方:party b :

合同编号: contract no

日期:date :

签约地点:signed at :

特约定:

甲方基于下文所列各种因素,特与乙方达成了协议并一致同意:由甲方在订约日期之翌日起天之内为乙方建造并完成。涉约建筑之规模及所需的钢筋、水泥、砖块、石子和其它建筑材料之数虽,均在作为合同附件的设计图和施工细则中予以说明。

witnesses that the party a for considerations hereinafter named, contracts and agrees with the party b that party a will, within days, next following

the date hereof, build and finish a libarary building for party b. ( the building hereinafter is referred to as the said building.)the said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed.

基于上述情况,乙方及其法定代表郑重承诺向甲方支付人民

币 元整。支付方法商定如下:

in consideration of the foregoing, party b shall, for itself and its legal representatives, promise to pay party a the sum of one million rmb yuan in manner as follows, to wit :

在上述工程开工之日,支付人民币 元整 在_____ 一年 _______ 一月 ___ 日,支付人民币

_______ 一元整 在_____ 一

年 _______ 一月 ___ 日,支付人民币 _______ 一元整 在_____ 一年 _______ 一月 ___ 日,支付人民币 _______ 一元整 在_____ 一年 _______ 一月 ___ 日,支付人民币 _______

一元整 余额人民币 _____ _元整于工程完成之日付清。

rmb __ _at the beginning of the said work.

rmb_ __ o n

/ ______ / ____ ( for example 3/21/XX)

rmb __ _ on ______ __/

/ rmb __ _ on ______ __/ / rmb __ _ on ______ __/ /

and the remaining sum will be paid upon the

pletion of the work.

订约双方并同意由甲方或其法定代表在领取各项付款

时,为证明有权领用上述各次付款, 必须由建筑师作出评定, 证明已经收到的付款之价值已经消耗在劳务及材料费用之 中。

it is further agreed that in order to be entitled

to the said payments ( the first one excepted, which

is otherwise secured ), party a or its legal representatives shall, according to the architects appraisement, have expended, in labor and material, the value of the payments already received by party a, on the building, at the time of payment.

上述协议如未能忠实执行,则违约一方同意其

其应享有权利自动丧失,且在违约之日后一个月之内,

向对方或其法定代表赔偿人民币元整,作为商定之损失赔偿

费。

for failure to acplish the faithful performance of the agreement aforesaid, the party so failing agrees to forfeit and pay to the other rmb yuan as fixed

and settled damages, within one month form the time so failing.

为示信守,各方谨于上文起首载明之日期签名、盖章。

本合同当下列人员之面交付。

in witness whereof we have hereunto set our hands

and seals the day and year first above written.

signed, sealed and delivered

in the presence of

甲方:party a : 乙方:party b

土建合同中英文版

新希望加尔各答动物饲料私人有限公司New Hope Kolkata Animal Feed Private Limited 年产26万吨饲料加工项目 Annual output of 2,60,000 tons of feed processing project 施工合同 The Construction Agreement 合同编号:NHKTJ2016033001 (土建工程)

Agreement No.: NHKTJ2016033001 (Civil works)

Agreement award date : May 7 th, 2016

第一部分协议书 Part One The Agreeme nt 发包人(全称):新希望加尔各答动物饲料私人有限公司以下简称甲方) The Employer (full n ame) : New Hope Kolkata Ani mal Feed Private Limited (Here in after referred to as First Seco nd Party) 承包人(全称):印度朴实建筑发展私人有限公司以下简称乙方) The Con tractor (full n ame): Pushy Con struct ion and developme nt In dia Pvt Ltd. (Here in after referred to as Seco nd Party) 依照印度其他有关法律、行政法规,遵循平等、自愿、公平和诚实信用的原则,双方就本建设工程施工事项协商一 致,订立本合同。 In accorda nee with releva nt laws, admi nistrative rules and regulati ons in In dia, based on the prin ciple of equality, volun tari ness, fair ness, hon esty and credit, the two parties con clude the follow ing Agreeme nt on n egotiated consen sus of the con struct ion items on this con structi on project. 一、工程概况The Project Overview 工程名称:新希望加尔各答动物饲料私人有限公司年产26万吨饲料厂项目(土建工程) Project Name: Annual output of 2,60,000 tons of feed processing projects for New Hope Kolkata Animal Feed Private Limited (civil works) 工程地点:印度西孟加拉邦奈哈蒂政府工业园 The address of the project: Plot-A5, Rishi Ban kim Shilpaudya n, PS-Naihati, North 24 Parga nas, West Ben gal, PIN-743165 工程立项批准或核准、备案文号:西孟邦政府工厂局批复第23号(13/01/2016) Formality: No. 23 of year 2016, Directorate of Factories of West Ben gal (13/01/2016) 资金来源:发包方企业自筹(已到位) Capital source: Rasied by First Party (In place) 工程内容:承包人按照施工图及甲乙双方的合同约定对主车间、成品车间、原料车间、雨棚一、锅炉房、卸料棚、发电

建筑合同-英文建筑合同

编号:_______________本资料为word版本,可以直接编辑和打印,感谢您的下载 建筑合同-英文建筑合同 甲方:___________________ 乙方:___________________ 日期:___________________

Party A : Party B : Contract No Date : Signed at : Witnesses that the Party A for considerations hereinafter named, contracts and agrees with the Party B that Party A will, within days, next following the date hereof, build and finish a Libarary Building for Party B. The said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed. In consideration of the foregoing, Party B shall, for itself and its legal representatives, promise to pay Party A the sum of one million RMB yuan in manner as follows, to wit : RMB at the beginning of the said work. RMB on/ / RMB on/ / RMB on/ / RMB on/ / And the remaining sum will be paid upon the pletion of the work. It is further agreed that in order to be entitled

中英文合同范本

销售合同 SALES CONTRACT 编号:Contract No: 日期: Date: 签约地点:Signed at: 卖方:Sellers: 地址:Address: 邮政编码:Postal Code: 电话:Tel:传真:Fax: 买方:Buyers: 地址:Address: 邮政编码:Postal Code: 电话:Tel:传真:Fax: 兹确认售予买方下列货品,其成交条款如下: The Seller hereby confirms selling the following goods on terms and conditions specified as (3)公差:数量及总值均有_____%的增减,由卖方决定 Tolerance: With _____% more or less both in amount and quantity allowed at the sellers option. (4) 原产地

Country of Origin: (5) 付款方式:30%预付,70%发货前一周付清 Payment terms: 30% deposit, 70% payment within one week before delivery. (6) 交货时间:收到预付款后15天内完成装运。 Time of shipment: Within15 days after deposit received. (7) 贸易方式:FOB Shanghai Terms of Shipment: FOB Shanghai (8) 包装:胶合板木盘外封铁皮 Packing:Plywood drum with steel sheet cover. (9) 保险:由卖方按发票全额110%投保至_____为止的_____险。 Insurance:To be effected by seller for 110% of full invoice value covering _____ up to _____ only. (10) 装运口岸:中国上海港 Port of Loading: Shanghai Port, China (11) 转运:允许 Transshipment: Allowed (12) 分批装运:允许分批装运 Partial Shipment: Allowed (13) 目的口岸: Port of Destination: (14) 唛头:Shipping Marks: (15) 单据:Documents: (16) 品质与数量、重量的异义与索赔:Quality/Quantity Discrepancy and Claim: (17) 逾期发运:如果由于买方原因造成逾期发运,买方承担责任。造成自签订合同之日起超过45天不能发运的,卖方将每日按货物金额的3%收取保管费;如果由于买方原因造成逾期发运超过6个月,卖方有权自行处置定金和货物。如果是卖方原因造成的逾期

中英文建筑工程合同(ContractofConstructionProject)

编号:_______________ 本资料为word版本,可以直接编辑和打印,感谢您的下载 中英文建筑工程合同 (ContractofConstructionProject) 甲方:___________________ 乙方:___________________ 日期:___________________

Contract of Construction Project 合同编号:Contract Number: 工程名称:Project Name: 发包方(甲方): ______________________________ Employer (Party A): ________________________ 承包方(乙方): ______________________________ Contractor (Party B): ________________________ 根据《中华人民共和国合同法》和《建筑安装工程承包合同条例》及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。 In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract. 第一条工程项目Article 1, Project item 1 .工程地点:Project site: 2. 工程范围:Scope of project 3. 工程造价:人民币元整(该造价为包工包料价) Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials) 第二条施工准备Article 2, Preparation for construction 1 .甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及有关隐蔽障碍物的资料。 Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles . 2 .乙方:.Party B: ①负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作; Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area. ②组织施工管理人员和材料、施工机械进场;

2019年建筑施工合同中英文对照版本.

XXXX施工合同 Con struct ion Con tract of xxxx 发包方(甲方)xxxx Party A: xxxx 承包方(乙方)xxxx Party B: xxxx 本合同由如上列明的甲、乙双方按照《中华人民共和国合同法》、《建筑安装工程承包合同条例》 以及国家相关法律法规的规定,结合本合同具体情况,于xx年x月x日在XX签订。 This con tract is sig ned by the two Parties in xxxx on xxxx accord ing to the “ Con tract Law of the People' s Republic of China " , the " Regulation on Building and Installation Con tract ing Con tract " , and other releva nt n ati on al laws and regulati ons , as well as the specific n ature of this project 第一条总则 Article 1 General Prin ciples 1.1合同文件 Con tract Docume nts 本合同包含合同、展示、施工图纸、作法说明、招投标文件以及合同所指的其他文件,它们均被视为合同的一部分。合同文件应该能够相互解释,互为说明。组成本合同的文件及优先解释的顺序如下:本合同、中标通知书、投标书及其附件、标准、规范及有关技术文件、图纸、工程量清单及工程报价单或预算书。合同履行中,发包人承包人有关工程的洽商、变更等书面下一或文件视为本合同的组成部分。 This con tract in eludes the con tract itself, exhibits, con struct ion draw in gs, explanations of work procedures, tender documents, as well as other documents specified by the con tract. The con tract docume nts should be mutually expla in able and mutually descriptive. The docume nts that con stituted the con tract and the priority hierarchy of expla nati ons of the docume nts are as follows: this con tract; the official letter of winning the ten der; Letter of biddi ng and its ann ex, sta ndards, guideli nes, and releva nt tech nical docume nts, draw in gs, Bill of Quan tity (BOQ) , quotati on of prices, and project budget. During the impleme ntati on of the con tract, any writte n agreeme nts or documents between two parties such as change-orders are also regarded will be deemed as part of this con tract. 1.1.1项目概况 Project In troduct ion 1.1.21 程名称:xxxx Name of Project: xxxx

英文建筑合同模板

英文建筑合同模板 party a:party b: contract no date: signed at: witnesses that the party a for considerations hereinafter named, contracts and agrees with the party b that party a will, within_____ days, next following the date hereof, build and finish a libarary building for party b. ( the building hereinafter is referred to as the said building.) the said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed. in consideration of the foregoing, party b shall, for itself and its legal representatives, promise to pay party a the sum of one million rmb yuan in manner as follows, to wit: rmb_____at the beginning of the said work. rmb_____on _____/ _____/_____( for example: 3/21/XX) rmb_____ on_____/ _____/_____ rmb_____ on_____/ _____/_____ rmb_____ on_____/ _____/_____ and the remaining sum will be paid upon the completion of the work. it is further agreed that in order to be entitled to the said payments ( the first one excepted, which is otherwise secured ), party a or its legal representatives shall, according to the architect''s appraisement, have expended, in labor and material, the value of the payments already received by party a, on the building, at the time of payment.

房屋租赁合同中英文合同范本

房屋租赁合同中英文合同范本 lease contract 出租方(甲方)lessor (hereinafter referred to as party a) : 承租方(乙方)lessee (hereinafter referred to as party b) : 根据国家有关法律、法规和有关规定,甲、乙双方在平等自愿的基础上,经友好协商一致,就甲方将其合法拥有的房屋出租给乙方使用,乙方承租使用甲方房屋事宜,订立本合同。 in accordance with relevant chinese laws 、 decrees and pertinent rules and regulations ,party a and party b have reached an agreement through friendly consultation to conclude the following contract. 一、物业地址 location of the premises 甲方将其所有的位于上海市_________区____________________________________的房屋及其附属设施在良好状态下出租给乙方___________使用。 party a will lease to party b the premises and attached facilities all owned by party a itself, which is located at _______________________________________ __________________________ and in good condition for_____________ . 甲方如未按本合同规定的时间向乙方提供租赁房屋,应按延迟期间内乙方应交租金的_____%计算,向乙方偿付违约金。 1-该房屋的现有装修及设施状况,由双方在合同附件( )中加以列明。除双方另有约定外,该附件作为甲方按本合同约定交付乙方使用和乙方在本合同租赁期满交还该房屋时的验收依据。 二、房屋面积 size of the premises 出租房屋的登记面积为_________平方米(建筑面积)。 the registered size of the leased premises is_________square meters (gross size). 三、租赁期限 lease term

建设工程设计合同(2014年中英版)

建设工程设计合同 Construction Project Design Contract 项目名称: Project Name: 项目建设地点: Project Location: 合同编号: Contract No: 设计资质等级: Grade of design License: 委托方: Client: 设计方: Design Firm: 签订日期: Signed date: 委托方(甲方): Client(Party A): 设计方(乙方): Design Firm (Party B): 甲方委托乙方承担【】工程设计,经双方协商一致后,签订本合同。 Party A entrusts Party B to undertake the design for【】this contract is made by the two parties after their mutual agreement. 第一条本合同依据下列文件签订 Article1. This Contract is made on the basis of the following documents 1.1《中华人民共和国合同法》、《中华人民共和国建筑法》和《建设工程勘察设计管理条例》。 《The Contract Law of the People’s Republic of China》,《The building regulations of the People’s Republic of China》and 《Regulations on Administration of Surveying and Designing of Construction Projects》. 1.2国家及上海市有关建设工程勘察设计管理法规和规章。 Relevant Building & Design Codes and Regulations of the State and of the Shanghai Municipality. 1.3建设工程的相关批准文件。 1.3The approval documents that are required for this construction project. 第二条本合同工程设计项目的名称、地点、规模、投资总额、内容及标准Article2. The name, location, size, investment sum, function, design contents and standards 2.1工程项目名称:【】

中英文合同范本

中英文合同范本 建筑合同architecture confirmation 甲方:party a:乙方:party b: 合同编号: contract no 日期:date: 签约地点:signed at: 特约定: 甲方基于下文所列各种因素,特与乙方达成了协议并一致同意:由甲方在 订约日期之翌日起_____天之内为乙方建造并完成_____(涉约建筑)。涉约建 筑之规模及所需的钢筋、水泥、砖块、石子和其它建筑材料之数量,均在作为 合同附件的设计图和施工细则中予以说明。 witnesses that the party a for considerations hereinafter named, contracts and agrees with the party b that party a will, within_____ days, next following the date hereof, build and finish a libarary building for party b. ( the building hereinafter is referred to as the said building.) the said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed. 基于上述情况,乙方及其法定代表郑重承诺向甲方支付人民币_____元整。支付方法商定如下: in consideration of the foregoing, party b shall, for itself and its legal representatives, promise to pay party a the sum of one

土木工程建筑承包合同中英文对照范文

土木工程建筑承包合同中英文对照范文 PART工GENERAL CONDITIONS 第一章总则 DEFINITIONS AND INTERPRETATION 定义和释义 1.(1)In the Contract,as hereinafter defined,the following words and expressions shall have the meanings hereby assigned to them,except where the context otherwise requires: 1.1在本合同中,除按上下文另具意义者外,下列词语应解释如下: (a)'Employer' means the party named in Part II who will employ the Contractor and the legal successors in title to the Employer,but not,except with the consent of the Contractor,any assignee of the Employer. “业主”指第二章中所指定的雇用承包人的一方或其权利继承人,但不包括业主的受让人,经承包人同意者除外。 (b)“Contractor”means the person or persons,firm or company whose tender has been accepted by the Employerand includes the Contractor’s personal representatives,successors and permitted assigns. “承包人”指标书已被业主接受的某个或某些人、商行或公司,包括其个人代表,继承人和业经认可的受让人。

xxx工程合同中英文版(标准版)

xxx engineering contract xxx工程合同 Contract No.: 合同编号: Party A: xxxCompany Limited 甲方:xxx有限公司 Party B:xxx Company Limited 乙方:xxx有限公司

This contract is made and entered into on the day of , 2014 by the following Parties in . 本合同于2014年月日由以下当事方在签署。 Party A: xxx Company Limited, 甲方:xxx有限公司,xxx经营的公司,住所地为xxx,(下称“甲方”),法定代表人:xxx Party B:xxx Company Limited, 乙方:xxx有限公司,一家xxx经营的公司,注册地址是:xxx,(下称“乙方”),法定代表人:xxx Party A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A Party. 甲方和乙方在本合同项下统称为“双方”,单独称为“一方”。 1. Work Content and Requirements 1. 工作内容、要求 1.1 In accordance with the items stipulated in this Contract, Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx. 1.1 依据本合同所限定的条款,乙方应以xx工程部规定的建筑标准和质量要求执行本工程。 2. Contract Period 2. 合同期限 2.1 Work period for the Road Construction Project: the work shall be completed within 2 month upon signing the Contract. The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection. 2.1 本次工程时间周期:合同签订后14个工作日内完成,并以甲方组成的竣工验收小组现场检验并出具 验收单为竣工交接条件。 2.2 This contract shall be implementedafter this is duly signed by the legal representatives or authorized representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite acceptance of the Project and Contract payment. 2.2 本合同自双方法定代表人或授权代表人签字盖章后生效,现场验收合格、款项支付完毕后关闭。 3. Health, Safety and Environment Principles (HSE) 3. 健康、安全和环境原则(HSE) 3.1 The staff from Party B shall follow the arrangement of Local government and Party A (or its representatives), and comply with the laws and regulations of Myanmar as well as rules and regulations on Health, Safety and Environment (HSE) of Party A. 3.1 乙方工作人员必须听从地方政府、甲方人员(或代表)的安排,遵守缅甸法律、法规和甲方的安全 环境健康规章制度等。 3.2 Before or during the implementation of this Project, Party B shall acknowledge, avoid and prevent the possible damage of the Project to the surrounding environment and other affiliatedfacilities, and the resulting losses shall be borne by Party B.

英文建筑合同(标准版)

Both parties jointly acknowledge and abide by their responsibilities and obligations and reach an agreed result. 甲方:___________________ 乙方:___________________ 时间:___________________ 英文建筑合同

编号:FS-DY-20196 英文建筑合同 Party A:Party B: Contract No Date: Signed at: Witnesses that the Party A for considerations hereinafter named, contracts and agrees with the Party B that Party A will, within_____ days, next following the date hereof, build and finish a Libarary Building for Party B. (the building hereinafter is referred to as the said building.)The said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed. In consideration of the foregoing, Party B shall, for itself and its legal representatives, promise to pay Party A the sum of one

建设工程施工合同中英文翻译件

工程编号: ___________________ Project No.: ___________________ 合同编号: ___________________ Contract No.: __________________ 建设工程施工合同 Con structi on Con tract for Con structi on Projects (GF-2013-0201 ) 工程名称: Name of project: 工程地点: Locati on of project: 发包人: Clie nt: 承包人:

工 商 行 政 管 理 总 局 Made by Min istry of Hous ing Urba n-Rural Developme nt State Admi nistrati on for In dustry & Commerce of the P 目录 Table of Contents 第一部分合同协议书 .......................................... ................ 错误! 未 定 义 书 签。 Part I Con tract Agreeme nt ........................................................... .............................. 错误! 未 定 义 书 签。 ...17 I. Project Overview ................. ?... .......... ?... ........... ?... ......... ?... ......... ?... ......... ???17 、合同工期 ... ....... ... ....... ... ....... .............. .......... ........ ... ........... . (30) II. Project Duratio n un der Con tract ?… ......... … ..... ?….....?… ....... … ......... ?::... Con tractor: 住房和城乡建设部 制定 .R.C 、工程概况

2019最新中英文对照-工程施工合同范本

工程施工合同 Con tract 合同编号(Con tract NO.): 签订日期(Date ): 发包方(简称甲方)___________________________________ Party A: 承包方(简称乙方): __________________________________ Party B: 根据《中华人民共和国合同法》以及其他有关法律法规规定的原则,结合本工程的具体情况, 甲、乙双方在平等、自愿、协商一致的基础上达成如下协议,共同遵守。 Accord ing to "PR.C Con tract Law”,and other releva nt laws and regulati ons to the specific circumsta nces of this project, parties A and B have hereby equally and volun tarily en tered into the followi ng agreeme nt executed on the basis of mutual respect. 1.工程概况 Project overview 1.1 工程名称: Project n ame: 1.2 工程地点: Project locati on: 1.3 工程范围: A. 新研发中心和新厂房的网络综合布线系统的施工; B. 数据中心的建设,主要包含:数据中心的装饰工程、电气系统、空调系统、机房闭路监控系统、机房门禁系统、消防系统改造、机柜系统等。 Project conten ts: A. The new R &D and new pla nt con structi on of n etwork cabli ng systems; B. Data Center, mainly includes: data center decoration and electrical systems, air-conditioning systems, CCTV systems, access con trol systems, firefight ing system reform, server rack systems. 1.4 开工条件:合同生效后,甲方预付款到位和现场具备开工条件。 Start con diti ons: After the comme nceme nt of the con tract, Party A has started adva nee and

建筑装饰工程施工合同(中英文)

Contract of Building decoration engineering 发包方(简称甲方)Party A: 承包方(简称乙方):Party B: 根据<中华人民共和国合同法><中华人民共和国消费者权益保护法><中华人民共和国价格法><上海市合同格式条款监督条例>,<上海市建筑市场管理条例>,以及其他有关法律法规规定的原则,结合本工程的具体情况,甲、乙双方在平等、自愿、协商一致的基础上达成如下协议,共同遵守 According to “PRC Contract Law”, “Law on the Protection of Consumer Interests”, “PRC Price Law”, “Shanghai Supervision of Contract Terms”, “Shanghai Construction Market Management Regulations”, as well as other laws and regulations relevant to the specific circumstances of this project, parties A and B have hereby equally and voluntarily entered into the following agreement executed on the basis of mutual respect. 一、概况OVERVIEW 1. 甲方装饰物业系合法物业Party A is the owner of the property. 2. 乙方为本市经工商行政管理机关核准登记,并可从事装潢装修的企业 Party B is approved and registered with the city industrial and commercial administrative organs as an enterprise engaged in renovation and decoration. 3. 装饰施工地点Construction site: 4. 建筑结构:建筑面积平方米,施工面积平方米。 Construction area: total area (including stairwells and other common areas): m2, private living area: m2. 5. 装饰施工内容:住宅装饰 Structure: residential. 6. 承包方式:详见附件一<工程估价单> Contractor engagement method: See annex – (quotation).